ERJ-170/175 LIMITATIONS Flashcards
(100 cards)
TYPE OF OPERATIONS
- VFR
- IFR
- Icing Conditions
- CAT I & CAT II
- Extended Overwater Operations
- RVSM
- RNP
APU MAX ROTOR SPEED
108%
APU MAX ITT START
1032 °C
APU MAX CONTINUES
717 °C
APU MAX ALTITUDE FOR START
33,000 Feet
APU MAX ALT ELECTRICS & PNEUMATICS
15,000 feet
APU MAX ALTITUDE ELECTRICS ONLY
33,000 Feet
APU MAX ALT to ASSIST ENG START
21,000 Feet
APU MIN OPERATION TEMPERATURE
- 62 °C
APU MAX OPERATION TEMPERATURE
ISA + 35 °C
APU DUTY CYCLE
- 1st & 2nd Start………60 seconds ON/60 seconds OFF
- 3rd Start………………..60 seconds ON/5 minutes OFF
PNEUMATIC
MAX DIFF PRESSURE to 37,000 Feet
7.8 psi
PNEUMATIC
MAX DIFF PRESSURE 37,000 - 41,000 Feet
8.4 psi
PNEUMATIC
MAX DIFFERENTIAL OVERPRESSURE
8.8 psi
PNEUMATIC
MAX DIFFERENTIAL NEGATIVE PRESSURE
- 0.5 psi
PNEUMATIC
MAX DIFFERENTIAL PRESSURE TAKEOFF AND LANDING
0.20 psi
PNEUMATIC
MAX ALT SINGLE PACK OPERATION
31,000 Feet
MAX OPERATION AIRSPEED VMO/ MMO
320 KIAS/0.82M
MAX AIRSPEED FOR RAT OPERATIONS
VMO/MMO 320 KIAS/0.82M
TURBULENT AIR PENETRATION BELLOW 10,000 Feet
250 KIAS
TURBULENT AIR PENETRATION ABOVE 10,000 Feet
270 KIAS/ 0.76 M
MAX TIRE LIMIT GROUND SPEED
195 KTS
MAX SPEED to Open DIRECT VISION WINDOW
160 KIAS
MAX WINDSHIELD WIPER OPERATION SPEED
253 KIAS