Expeditionary Flashcards
(15 cards)
How many Navy combat camera (COMCAM) units are there
Two
What is a tactical enabling operation in which, by the direction of higher authority all or part of a unit is replaced in an area by the incoming unit?
Rip/ TOA
Authority and guidance for UOF and UODF is found in which of the following institutions
CJCSI 3221.01
Designated Marksman (DM) and Assistant Boarding Officer are both part of what team composition
Help Vessel Boarding Search and Seizure
Regardless of force disposition, one of the most critical aspects of the RIP/TOA is to ensure the combat effectiveness of the CRF unit being relived does not diminish while the process unfolds, typically over the course of ______ days
14-21
Units conduct force protection of strategic shipping and naval vessels operating in the inshore and coastal areas, anchorages and harbors, and from bare beach to sophisticated port facilities
Small Craft Operation
The ___ through the Chairman of the Joint Chiefs of Staff, promulgates SROE to component commanders to guide in the employment of forces toward achieving broad national objectives
SECDEF
Rules of engagement always recognize what
Inherent right to self defense
Who is designated as the executive agent for the administration of the DOD Detainee Program
Secretary of the Army
Which of the following are NOT one of the four treaties of the Geneva Convention
Relative to the Quality of care, food, clothing, medical m, and housing.
Which line of the nine-line MEDEVAC reports is only included when contamination exist
Line 9
Detention operation are governed by the provisions of the Cofe of Conduct
False
Individual’s responsible for AA&E will be screen and all screenings and interviews will be maintained for a minimum of hoe long after de-screening or termination
Six months
Basing falls into one of two categories: permanent or contingency
True
Cart 1 will be conducted toward the end of sustainment phase to prepare the unit for the upcoming maintenance phase. Cart 2 will take place in the _____to assess material conditions of CESE and other equipment items not utilized during the unit’s deployment
Maintenance Phase