extra stuff Flashcards

(6 cards)

1
Q
  1. how to work out cross sectional dimension of a primary beam concrete frame?
  2. how to work out cross sectional dimension of a secondary beam concrete frame?
A
  1. put length in meters into mm (x1000)
    then divide by 16
  2. put length in meters into mm (x1000)
    then divide by 22
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

how to work our thickness of floor slabs conrete frame FLAT slabs?

how to work our thickness of floor slabs conrete frame CANTILEVER slabs?

A
  1. use longest side, put meters into mm (x1000)
    divide by 36
  2. put length in meters into mm (x1000)
    then divide by 11
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

GLULAM COLUMNS (posts)
1. maximum amount a 150mm× 150mm glulam post can carry?

  1. 200mm× 200mm ?
  2. 250mm× 250mm?
  3. 300mm× 300mm
  4. 350mm× 350mm?
A
  1. 55 m2 of roof and floor area
  2. 90 m2 of roof and floor area
  3. 180 m2 of roof and floor area
  4. 270 m2 of roof and floor area
  5. 360 m2 of roof and floor area
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

PRIMARY BEAMS GLULAM

  1. equation for h(depth) primary beams glulam?
  2. equation for b (width) primary beams glulam?
A
  1. h=l/20+150mm
  2. b = h/3

so it will probably be 2 dimensions like 500mm x 170mm or something

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

SECONDARY BEAMS GLULAM

  1. equation for h(depth) secondary beams glulam?
  2. equation for b (width) secondary beams glulam
A
  1. h=l/20
  2. b= h/4
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6