fe cards Flashcards

1
Q

Ace Equation

A

(NIA-NIS)-10xBx (FS-FA)-IME

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

CPS 1- control performance standard

A

must be 100% or greater- distribution of all BAs Ace in an Interconnection and based on expected freqency performance within the indiviual interconnection. Statistical measure of ace variability. Measures ace in combonation with frequency error

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

CPS 2- control performance standard

A

90% or greater- limits the magnitude of the impact at a BA places on the transmission resources in its interconnection. Designed to limit the BA’s unscheduled Power Flows. To protect the tie lines.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

CPS 1 - control performance standard

A

can be viewed as a measure of whether a BA is maintaining enough Regulating Reserves

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

CPS 2 control performance standard

A

can be viewed as whether a BA is maintaining enough operating reserves

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

DCS control performance

A

measure a BA or RSG is maintaning enough Contingency Reserves

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

CPS 1 & CPS 2

A

report compliance to Nerc on monthly basis & must be in compliance with the CPS during both normal and disturbance conditions

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

DCS

A

You can report compliance to the DCS as a BA or RSG.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

DCS

A

Entities must be able to recover from their single most severe contigency.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

DCS

A

A BA is responsible for recovering from a reportable disturbance within 15 minutes and contingency reserves must be back in 90 minutes. unless combined magnitude is greater than single most severe contingency.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

DCS

A

REPORTED TO NERC QUARTLEY - 4X A YEAR

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

FREQUENCY

A

60HZ

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

BIAS

A

SHALL BE SET CLOSE TO BA’S FREQUENCY RESPONSE CHARACTERISTIC

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

WECC

A

OPERATES IN BIAS TIE LINE MODE

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

BIAS

A

REVIEWED ONCE A YEAR - SET AT 1% OF ESTIMATED PEAK LOAD OR 1% OF ESTIMATED GENERATION LOAD

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

NAESB STANDARD

A

MANUAL TIME ERROR CORRECTION - ONE TIME MONITOR PER INTERCONNECTION- THE RC ACTS AS THE MONITOR.

17
Q

FREQUENCY

A

SCHEDULED FREQUENCY IS THE TARGET OR DESIRED FREQUENCY

18
Q

AUTOMATIC GENERATION CONTROL-AGC

A

EQUIPMENT THAT AUTOMATICALLY ADJUST GENERATION IN A BA AREA FROM A LOCATION TO MAINTAIN THE BA’S FREQUENCY- USE MANUAL IF IT BECOMES IN-OPERATIVE

19
Q

SCHEDULED FREQUENCY

A

59.98, 60.00 or 60.02

20
Q

ace

A

should be at zero

21
Q

ace

A

if BA is unable to calculate ace for more than 30 minutes notify RC. data scan every 6 seconds.

22
Q

metering errors

A

lead to inadvertent

23
Q

inadvertent interchange

A

paid back during peak - 0700 to 2200

eastern - central, ercot 0800-2200 & western 0700-2200 pacific.

24
Q

inadvertents

A

are calculated and recorded every hour

25
Q

ba’s

A

submit montly summary report of inadvertants, by the 15th calandar day of the following month to the RRO REP then it is submitted by rro to nerc by the 22nd calander day. if a ba does not report by the 20th day of the month they are non complaint.