Fire In Buildings - Module 7 (Salvaging And Cutting) Flashcards

1
Q

Where would you expect to find salvage plans?

A

Heritage sites
National Infrastructure sites

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Where salvage plans exist the priority to remove the contents to safety may overtake the extinguishment of the fire, true or false?

A

True

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

If after a dynamic risk assessment the IC deems it too dangerous to follow the existing salvage or disaster plans access to that specific area can be prohibited where should this be recorded?

A

CS1 log
Next informative message

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

What are some operational tactics that might be considered to limit damage caused by fire fighting media?

A

Diverting or channelling water run off
Damming door ways
Running hose up the outside of a building
Inspecting dry rising mains leaks
Replacing burst lengths as quickly as possible
Isolating sprinklers
Using sheet to protect contents

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Water can have a significant impact on the integrity and stability of any structure due its weight, 1000 litres of water is equivalent to how much weight?

A

1 tonne

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Damage control can be categorised into three phases.. what are they?

A

1 - Work undertaken at the same time as firefighting. This is usually the most important phase if significant damage is to be prevented

2 - This is aimed at mitigating the damage that has already occurred and preventing further deterioration

3 - This deals with preventing subsequent damage or losses including removing and storing items

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

At the conclusion of an incident, fire and rescue services have an obligation to hand over responsibility for a location or premises and any recovered or salvaged items over to who?

A

Responsible person for the site

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

If salvage or disaster plans do not exist for a premise what should be implemented by the IC during the progression of the incident?

A

Damage control plan

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Salvage and / or disaster plans should be present within SSRI information true or false?

A

True

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Which of the following is not an operational tactic that might be considered to limit damage caused by firefighting media?

A

Inspecting buildings and leaving doors wedged open

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

What damage can a significant effect on the integrity and stability of any structure due to its weight. 1000l is equivalent to how many metric tonnes?

A

1 cubic metric tonne

How well did you know this?
1
Not at all
2
3
4
5
Perfectly