1
Q

DOGGING WORK INCLUDES THE RESPONSIBILITY OF WHAT TASKS?

A
  1. SELECTING SLING AND SLINGING TECHNIQUES
  2. ASSESSING LOADS
  3. INSPECTING LIFTING GEAR
  4. DIRECTING THE CRANE OPERATOR
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

AT WHAT POINT DOES A PERSON SILING A LOAD NEED A DOGGING LICENCE

A
  1. SELECTING SLING AND SLINGING TECHNIQUES
  2. ASSESSING LOADS
  3. INSPECTING LIFTING GEAR
  4. DIRECTING THE CRANE OPERATOR
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

LIST 3 PEOPLE YOU SHOULD TALK ABOUT SITE HAZARDS BEFORE YOU START WORK

A
  1. OTHER WORKERS
  2. SUPERVISORS
  3. ENGINEERS
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

WHY IS IT IMPORTANT TO TALK TO THESE PEOPLE BEFORE STARTING WORK

A
  1. KNOW THE HAZARD

2. FOLLOW WORK PLACE POLICIES AND PROCEDURES

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

LIST 10 HAZARDS YOU MIGHT FIND IN THE WORK PLACE

A
  1. POOR LIGHTING
  2. UNDERGROUND SERVICES
  3. POTENTIAL NON-WEIGHT BEARING SERVICES
  4. PEDESTRIANS
  5. VEHICLES
  6. TREES
  7. POWERLINES
  8. WEATHER - LIGHTENING AND WIND
  9. BUILDINGS
  10. WORKERS / DANGEROUS MATERIALS
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

OTHER THAN IDENTIFIED HAZARDS, LIST 5 THINGS YOU MUST CONSIDER

A
  1. SIZE OF LOAD
  2. COMMUNICATION
  3. ACCESS AND EGRESS
  4. LOCATION OF LOAD
  5. PERMITS
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

LIST THE HIERARCHY OF CONTROLS FROM THE MOST EFFECTIVE TO THE LEAST

A
  1. ELIMINATION C
  2. SUBSITUTIONS
  3. ISOLATION
  4. ENGINEERING
  5. ADMINISTRATIVE CONTROLS
  6. PPE
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

WHEN SHOULD YOU CHECK IF YOUR PPE IS SAFE TO USE

A

BEFORE USE

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

WHEN SHOULD YOU CHECK IF YOUR PPE IS SAFE TO USE

A
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

WHEN SHOULD RISK CONTROL MEASURES BE PUT IN PLACE

A
  1. BEFORE STARTING WORK

3. WHEN IDENTIFIED

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

LIST 4 ITEMS OF PPE A DOGMAN SHOULD WEAR

A
  1. HARD HAT
  2. SAFETY SHOES
  3. SAFETY GLOVES
  4. HIGH VISIBILITY CLOTHING
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

WHEN SHOULD EXCESS MATERIAL BE REMOVED FORM THE WORK AREA

A

AS SOON AS POSSIBLE

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

WJAT ARE THE 3 ZONE DISTANCE AND CORRESPONDING VOLTAGES FOR WORKING NEAR POWER LINES IN NSW

A
  1. 3 M - 132 KV
  2. 6 M - 330 KV
  3. 8 M - 330 KV AND ABOVE
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

IF YOU NEED TO WORK CLOSER THAN THESE MINIMUM DISTANCE HOW CAN THIS BE DONE

A
  1. HAVE THE POWER TURNED OFF
  2. EXEMPTION / PERMIT
  3. SAFETY OBSERVER
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

HOW CAN YOU DETERMINE THE VOLTAGE OF OVERHEAD POWERLINES

A
  1. SIGNANE

2. CALL POWER COMPANY

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

WHAT IS USED TO INDICATE THE PRESENCE OF OVERHEAD POWERLINES

16
Q

WHAT SIZE SHOULD A TAGLINE BE

17
Q

WHAT MATERIAL SHOULD A TAGLINE BE MADE OF

A

NON-CONDUCTIVE ROPE

18
Q

WHY IS IT CONSIDERED UNSAFE TO RAISE OR LOWER THE BOOM OVER PEOPLE

A

RISK OF SERIOUS INJURY OR DEATH

19
Q

HOW DO YOU DETERMINE IF A CCLP CAN TAKE THE WEIGHT OF THE LOAD

A
  1. CHECK SAFE WORKING LOAD ON CCLP

2. CALL MANUFACTURER

20
Q

WHAT NEEDS TO BE CONSIDERED WHEN PLACING A LOAD ON A CONCRETE FLOOR? WHERE WOULD YOU GET THE REQUIRED INFORMATION FOR THIS TASK.

A
  1. SAFE WORKING LOAD OF FLOOR

2. ENGINEER

21
Q

WHAT IS THE HAZARD AND HOW WOULD YOU CONTROL IT FOR PEOPLE WORKING NEAR THE CHASSIS OR OUTRIGGER OF A MOBILE SLEWING CRANE

A
  1. BEING STUCK OR CRUSHED

2. EXCLUSION ZONE

22
Q

WHAT NEEDS TO BE PROVIDED IN DARK OR POORLY LIT AREAS

A

ADEQUATE LIGHTING ACROSS ENTIRE WORK AREA

23
Q

LIST 2 HAZARDS THAT CAN RESULT FROM WORKING WHEN ITS WINDY

A
  1. LOAD SWING/SPIN

3. CRANE INSTBAILITY

24
WHAT IS THE PURPOSE OF A TAGLINE
TO CONTROL THE SAFE LANDING OF THE LOAD
25
WHEN SHOULD A TAGLINE BE USED
1. AROUND POWERLINES 2. WINDY CONIDTIONS 3. WORKING AROUND OBSTRUCTIONS
26
WHAT IS THE IMPORTANCE OF ALWAYS MONITORING THE LOAD WHILE DOGGING
INDENTIFYING AND CONTROLLING HAZARDS
27
LIST 4 THINGS THAT MUST BE CONSIDERED WHEN THE PATH OF MOVEMENT FOR THE CRANE OR LOAD IS BEING WORKED OUT
1. SIZE OF LOAD 2. SIZE OF CRANE 3. POWER LINES 4. OBSTRUCTIONS
28
WHEN SHOULD YOU PLAN THE PATH OF MOVEMENT WHEN MOVIGN THE LOAD OR CRANE
PLANNING STAGE
29
LIST 3 THINGS YOU MUST DO IF AN UNSAFE INCIDENT OCCURS WHILE DOGGING A LOAD
1. STOP AND ASSESS 2. FIX IF POSSIBLE 3. ASK FOR HELP 4. REPORT