KAIZEN Flashcards
(23 cards)
Maintenance
activities directed towards maintaining current technological, managerial operating standards and upholding standards
Improvements
activities directed towards elevating current standard
emphasises human efforts, morale, communication, training, team-work, involvement and self-discipline
PDCA cycle
Plan: establish a target
Do: implement the plan
Check: determine if implementation remains on track
Act: take actions to perform and standardise new procedures
7 types of waste
Overproduction
Excess inventory
Scrap/Rework
Wait time
Excess conveyance
Excess motion
Overprocessing
Overproduction
produce more than customer requires
producing too early
Excess inventory
producing more than customer demand
Scrap/Rework
things not done right the first time
consume labour, materials, energy etc. to remake
no value for customer
Wait time
things always should be ready when required without delay
Excess conveyance
moving parts more than required
often occurs with overproduction
Excess motion
multiple handling of items, multiple trips to get materials, straining to reach tools etc.
Over-processing
working the product beyond customer’s specification
6-steps of kaizen
Discover improvement potential
Analyze current method
Generate new idea
Develop implementation plan
Implement the plan
Evaluate new method
Discover improvement potential
establish new level of performance
requires more creativity, degrees of freedom and willingness to try new methods
Kaizen attitude
Open-minded
Don’t be swayed by preconceived notion
Practice rigorous thorough observation of process
Conduct with calm and rational attitude
Analytic skill for kaizen
Classify and organize
Quantify and observation
Specify the details
Machine loss analysis
focus on human aspect of production
Machine loss analysis areas for improvement
equipment breakdown
equipment changeover
equipment cycle time
minor stops
scrap/rework
start-up loss
Equipment breakdown
unplanned downtime of machine due to electrical or mechanical failure
data on which component on machine breaks down
data on which machine breaks down
effective countermeasures can be taken
Equipment changeover
lost production time due to changing tools in equipment
setup time reduction involves identifying major step during changeover
distinguish between work done before machine stop and after stopped
move work to external from internal
Equipment cycle time
cycle time can degrade over time or be slowed
if unchecked accidental loss of production time can occur
if machine hasnt slowed down, there is still dead time in cycle
Minor stops
machine often suffers minor stops that robs valuable production time
watching machine cycle continuously and interviewing machine operators can uncover minor steps for analysis regarding root cause
frequency of stops can be tabulated and corrective measures can be taken to eliminate them
Scrap/Rework
(Machine loss)
dollar amount lost in production due to scrap/rework
time loss not so significant
many countermeasures available for any root cause
Start-up loss
equipment starts up at beginning, prone to start-up problems or yield loss
cause equipment loss