learn Flashcards

1
Q

how long should the 800 Gpm engine Idle before you pull the stop switch

A

1 minute

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

3 types of pump stations

A

Booster, Mainline,and Flood/transfer

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

the line strainer should be changed when the pressure diiferiantial reading increases by How many psi?

A

5 psi

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

characteristics of the flood and transfer hose line pump

A

600 GPM / 150 psi

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

the fist step to operating an 800 GPM pump

A

PMCS

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

after the scrapper enters the reciever barrel, what should you do first

A

open the bypass valve

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

what is flow idle RPM of the 800 GPM pump

A

500 to 1000 RPM

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

How long should you engage the 600 GPM pump starter switch each time to prevent
electrical damage

A

10 sec

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

During ____ pump arrangement fuel first flows.. One pump and then into the next

A

Series

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

What indicated that the scrapper has entered the receiver barrel

A

The flag indicator pops up

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

The 800 GPM pump low suction pressure (shut down) is set

A

9 PSI

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

A scrappers speed should not be allowed to fall below

A

2 mph

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

What are the types of scraper

A

Polly pig and brush

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

When pumps receive fuel directly from the line at the same time, they are arranged in
which of the following

A

Parallel

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

The 800 RPM pump engine over speed is set at

A

2300 RPM

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

. What is the first step when putting pumps on line

A

perform before operations (pmcs)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
17
Q

What is the acronym GLUV performed

A

During operation maintenance (PMCS)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
18
Q

. During shutdown procedures the 600 GPM pump engine should be allowed to idle for

A

30 secs

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
19
Q

What determines the size scrapper you should use

A

The size of the pipeline

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
20
Q

Brush scrapers cannot be used on sections of pipe that have corners/ bends of more than

A

30 degrees

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
21
Q

What is the first thing you should do if the strainer gets stuck in the pipeline

A

Increase the full line pressure

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
22
Q

What is the first step when taking pumps off line

A

Reduce pump pressure to the idle speed for the required time

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
23
Q

What are the types of pump arrangements?

A

Series and parallel

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
24
Q

Which of the following is positioned at an angle up to 5 degrees from the

A

800 GPM pump

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
25
. What type of pump is the 600 GPM
Flood and transfer/ hose
26
The 800 GPM pump engine over speed is set at
2300 RPM
27
What are the 3 types of pump stations
Booster, mainline, flood/ transfer
28
What indicated that the scraper has entered the receiver barrel
The flag indicator pops up
29
During the start up of the 600 GPM pump the oil bypass switch is engaged until the oil pressure reaches
40 PSI
30
What is/ should be the first step when taking the pumps offline
Reduce the pump pressure to idle speed
31
During pump operations if the fuel flows into one pump and then the other it is arranged in a
Series
32
A brush scraper cannot be utilized in a section of pipe that have/has corners or bends of more than
30 degrees
33
During setup of pump stations the 800 GPM pump can be positioned at any angle up to
5 degrees
34
The 800 GPM pump low suction is
9 PSI
35
What are two types of scrapers
Polly pig and brush
36
When is the acronym GLUV performed
During operations
37
. Before operating the 600 GPM what actions are taken
PMCS
38
During shutdown procedures on the 800 GPM pump how long should the engine idle before you pull the stop switch
1 min
39
During the start up procedures, the 800 GPM pump should be idled until
120 degree is reached
40
. During pump operations the scrapper becomes stuck in the pipelines what should you do
Increase the fuel flow pressure
41
After the scraper enters the receiver barrel, what is the first thing you should do
Open the bypass valve
42
During the startup of the 600 GPM pump how long should you engage the starter switch each time to prevent electrical damage
10 sec
43
What determines the scraper size used
The size of the pipeline
44
Which of the following is not one of the safety considerations for the 800 GPM pump
Ensure the pump has warmed up for 3-5 min
45
The 600 GPM pump is a
hoseline/ flood & transfer
46
During shutdown procedures the 600 GPM pump should be idle for at least
30 sec
47
During pump operation the pump receives fuel directly from the line at the same time it is engaged in a
Parallel
48
The pump primarily utilized with the TPT is a single stage centrifugal pump it has a
600 GPM & an operational output at 150 PSI
49
Which of the following is a characteristic of the 600 GPM hose line pump?
Single stage, centrifugal pump
50
SPC Smith properly set the scraper indicator after launching a poly pig from pump station 2. Who should he/ she notify?
The chief dispatcher
51
What are two methods to monitor the location of a scraper during a pipeline?
Listening and measuring
52
Before starting the 800 GPM pump should conduct the following
PMCS
53
The 600 GPM pump is equipped with a mode select switch located on the left side of the left control panel. Always select ____ mode when starting the engine.
Manual
54
Why are strainer assemblies installed in pump stations, upstream of the pumps?
To protect them from damage due to dirt or debris in the pipeline
55
Which of the following is a characteristic of the 800 GPM mainline pump
A 3 stage centrifugal pump
56
The ____ is one of the major components of the 800 GPM pump and is used to connect the speed increaser to the pump
Flexible coupling
57
Have a mission to position an 800 GPM pump within a 5 degrees horizontal using its lifting bail assembly it should be connected to ____ on the skid
4 locations
58
. The 800 GPM can be classified as a
Hose line pump
59
To calculate the total volume needed to move the scraper between the launcher and receiver
8, 185 gallons
60
Air should be bled at least ____ and repeated every 15 min. If there is a lot of air in the line until no air is observed
Every hour
61
Additionally the pump is equipped with four safety shutdown devices. What type of pump is he referring to?
800 GPM mainline pump
62
The 600 GPM pump, suction gage which shows a Vacuum. But the pump did not prime after 5 min. What action is required?
Stop engine and check for leaks
63
The dispatcher informed you that it's safe to shut your 800 GPM pump down- turn the engine discharge pressure control fully _____ to idle position
Counterclockwise
64
What is the purpose of the 600 GPM pumps air eliminator valve
Removes air and maintains an air free system throughout the operations
65
You should not inject starting aid more than __ with engine stopped
2 twice
66
What device is mounted on strainers that will indicate a possible fuel blockage issue during operations
Pressure differential gage
67
800 GPM pump > how many hrs can the continuously operate the pump before the 110 gallon tank require refueling
4 hours
68
When you open a strainer for further inspection. What tool is available on the strainer to assist with this task
Come a long bolt
69
What effect would using the light fuel provide
debris will settle out faster in a light fuel
70
. __ fuel is pumped when a series arrangement is used instead of a parallel setup
Less
71
. The scrapper can probably be freed by increasing the pressure in the line. What care should be taken when increasing the pressure
Avoid over pressurize the line
72
. ___ stations are sometimes used to push fuel unloaded from a tanker or barwe through the line to base terminal storage
Booster pump
73
Always ensure you have launching instructions from the dispatcher and set the scraper indicator ____ before the scraper departs his station
red flag in the down position