LEED Process Flashcards

(58 cards)

1
Q

Any individual energy end use that represents ____ percent of the total annual consumption of the building must have an advanced energy meter?

A

10%

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What minimum percent of parking spaces must be placed under cover for Heat Island Reduction Option 2. Parking Under Cover?

A

75%

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

What percent of runoff must be managed for the 95th percentile rainfall event?

A

100%

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Any roof used to shade covered parking for Heat Island Reduction must meet what requirements?

A
  1. Three year aged SRI of at least 32
  2. Or a vegetated roof
  3. Or covered by energy generation systems
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

What Cradle-to-Cradle certified products count towards material ingredient optimization?

A

Cradle to Cradle v2 Gold: 100% of the cost

Cradle to Cradle v2 Platinum: 150% of the cost

Cradle to Cradle v3 Silver: 100% of the cost

Cradle to Cradle v3 Gold or Platinum: 150% of the cost

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

What energy sources must be metered in a building?

A

Electricity

Natural gas, fuel oil, other fossil fuels

Biofuels

District chilled water, steam, and hot water

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Front of card
What exterior lighting is exempted from uplight and light tresspass requirements?

A

Specialized lighting for transportation -Lighting for façade and landscape lighting in MLO lighting zones 3 and 4

Lighting for theatrical purposes

Government-mandated roadway lighting
Hospital emergency departments, including associated helipads

Lighting for the national flag in MLO lighting zones 2, 3, or 4

Internally illuminated signage

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

At what height should daylight measurements be taken?

A

(March 21 or September 21) and 3 PM on the second equinox

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Shade and architectural devices used for Heat Island Reduction must have at least what three-year aged solar reflectance?

A

0.28. If the three-year aged value information is not available use materials with an initial SR of at least 0.33

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

What is the threshold for an ASE simulation?

A

1,000 lux of direct sunlight for more than 250 hours of the year between 8 AM and 6 PM local time for a full calendar year

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

What is required for Reduced Parking Footprint?

A
  1. Do not exceed the minimum local code requirements
  2. A percent reduction from a baseline (20% or 40% depending on what other credits are achieved)
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

When managing a percentile of rainfall events what minimum amount of historical rainfall data is required?

A

10 years worth

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

When reducing total waste material for C&D Waste Management what is the maximum amount of waste allowed?

A

2.5 lbs / SF (12.2 kg / m2) of waste for the building’s floor area

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

What are the minimum weekday and weekend trips for projects with commuter rail or ferry service only?

A

24 weekday, 6 weekend

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

What is the threshold for an SDA simulation?

A

300 lux for 50% of the hours between 8 AM and 6 PM local time for a full calendar year

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

How long must an advanced energy metering system store data?

A

36 months

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
17
Q

What is the maximum number of points a project can earn for Pilot Credits?

A

4 Points

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
18
Q

What is the maximum number of points a project can earn for Regional Priority credits?

A

4 Points

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
19
Q

What is the maximum number of points a project can earn for IN Credit Innovation for the innovation option?

A

5 Points

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
20
Q

How much preferred parking is required for Reduced Parking Footprint?

A

5% of the total parking spaces AFTER reductions are made from the base ratios.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
21
Q

What are the minimum weekday and weekend trips for projects with multiple transit types (bus, streetcar, rail, or ferry)?

A

72 weekday, 40 weekend

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
22
Q

How much rainfall must be managed for a project with a zero-lot-line with a minimum density of 1.5 FAR

A

85th Percentile

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
23
Q

When do the daylight simulations for Option 2 Simulation: Illuminance calculations occur?

A

9 AM on the first equinox

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
24
Q

For a project with open space what minimum rainfall must be managed?

A

95th Percentile

25
How long must a project commit to sharing metering data with USGBC and when must the sharing begin?
A five-year period beginning on the date the project accepts LEED certification or typical occupancy, whichever comes first
26
What is a BUG rating?
A luminaire classification system that classifies luminaires in terms of backlight (B), uplight (U), and glare (G) (taken from IES/IDA Model Lighting Ordinance). BUG ratings supersede the former cutoff ratings.
27
What is the contract period for demand response?
A minimum of one year with the intention of multiyear renewal
28
What does not qualify as material diverted from disposal for C&D Waste Management Planning?
Alternative daily cover (ACD) and land-clearing debris.
29
What is Technical Release (TR) 55?
An approach to hydrology in which watersheds are modeled to calculate storm runoff volume, peak rate of discharge, hydrographs, and storage volumes, developed by the former USDA Soil Conservation Service
30
What is load shedding?
An intentional action by a utility to reduce the load on the system. Load shedding is usually conducted during emergency periods, such as capacity shortages, system instability, or voltage control.
31
How can reductions be achieved beyond 30% be achieved for outdoor water use reduction?
Any combination of efficiency, alternative water sources, and smart scheduling technologies
32
What must a bicycle network connect to?
At least one of the following: at least 10 diverse uses a school or employment center, if the project's total floor area is 50% or more residential a bus rapid transit stop, light or heavy rail station, commuter rail station, or ferry terminal
33
At what heights should CO2 sensors be placed at for breathing zone requirements?
Between 3 and 6 feet above the floor.
34
What hazardous waste stream categories require safe collection, storage, and disposal?
Choose two of these three: Batteries, mercury-containing lamps, or electronic waste
35
What minimum number of waste streams must be diverted for C&D Waste Management?
Divert at least 50% of the total C&D material, including at least three material streams
36
What are the light pollution reduction requirements for internally illuminated exterior signs?
Do not exceed a luminance of 200 cd/m2 (nits) during nighttime hours and 2000 cd/m2 (nits) during daytime hours.
37
How often must advanced meters be able to report data?
Hourly, daily, monthly, and annually
38
What is a BAS?
Intent of proposed innovation credit, the proposed requirement(s) for compliance, proposed submittals, and strategies used to meet the requirement(s)
39
When managing rainwater using natural land cover conditions what must be done?
Manage on-site the annual increase in runoff volume from the natural land cover condition to the postdeveloped condition.
40
When using the calculation method for light pollution reduction how far apart can the calculation points be?
No more than 5 feet (1.5 meters) apart.
41
Does building envelope commissioning have to be completed for Fundamental Commissioning?
No. It must be documented in the OPR and BOD. It is not required unless the project team pursues EA Credit Enhanced Commissioning, Option 2.
42
If the BUG rating method is used to meet the Uplight requirements does the method have to be used to mee the Light Tresspass requirements?
No. Project teams can use the BUG method or calculation method for Uplight, and use the same or different method for Light Tresspass.
43
What type of location must a historic district project be located in for High-Priority Site?
On an infill location
44
What is required for LEED Accredited Professional credit?
One LEED AP with a specialty appropriate for the project
45
What three components are part of monitoring-based commissioning (MBCx)?
Permanent energy monitoring systems, real-time energy analysis, and ongoing commissioning
46
What two simulations are required for Daylighting, Option 1 Simulation?
sDA and ASE
47
What types of demand response programs are acceptable?
Semi-automated and automated (not manual)
48
How is the total vehicle parking spaces calculated for Heat Island Reduction?
The number of parking spaces in the LEED project boundary (including motorcycle parking). Do not count bicycle parking spaces.
49
How many conditions are there where the lighting boundary can be different than the property boundary?
There are 3 conditions. The exceptions are not listed here due to their length (see the reference guide).
50
What are the three options for high priority sites?
Option 1. Historic district Option 2. Priority designation Option 3. Brownfield remediation
51
What should be used to designate a site as prime farmland and identify its soil classification?
Natural Resources Conservation Service (or local equivalent)
52
When can certification be revoked?
Certification may be revoked from any LEED project upon gaining knowledge of non- compliance with any applicable MPR. If such a circumstance occurs, registration and/or certification fees will not be refunded.
53
When is a 40% reduction from the base ratios of the ITE Transportation Planning Handbook required for Reduced Parking Footprint?
When a project earns EITHER LT Credit Surrounding Density and Diverse Uses or LT Credit Access to Quality Transit
54
When can planned stops and stations count towards Access to Quality Transit?
When they are sited, funded, and under construction by the date of the certificate of occupancy and are complete within 24 months of that date.
55
Where must long-term bicycle storage be located?
Within 100 feet (30 meters) walking distance of any functional entry.
56
Where must short-term bicycle storage be located?
Within 100 feet (30 meters) walking distance of any main entrance.
57
How close does a functional entry or bicycle storage need to be to a bicycle network?
Within 200-yards (180-meters) walking or bicycling distance
58
What is the maximum distance on a bicycle network destinations (diverse use, school/employment center, quality transit) must be?
Within a 3-mile (4,800 meter) bicycling distance of the project boundary.