What work requires Building Regs approval? Provide some examples.
Building work as defined by the Building Act 1984.
New Build
Extension
Inserting cavity wall insulation
Thermal Upgrading
What work requires planning approval? Provide some examples
Development as defined by the Town and Country Planning Act 1990.
- New build
- Change of use
- Extending a building
- Listed building / conservation area
What is the Party Wall Act?
Legislation providing a framework for resolving disputes in relation to the party wall.
In relation to St Davids Drive, what is the difference between acting as Agreed Surveyor and Building Owners Surveyor?
Agreed surveyor - appointed by both
BO surveyor - only appointed by BO
For St Davids Drive, how did you know the foundations were being installed to a greater depth than that of the AOs foundations?
Drawings
Trial Pit
Informed judgement on building age and location
What are the statutory timescales associated with serving a Party Wall Notice?
Line of junction one month before and if dissent build wall wholly on your land, adjacent excavation is one month before and repair notice is 2 months before.
Were special foundations installed at St Davids Drive? What are special foundations? What would you advise your client if they were installing special foundations on the BOs land?
No
An assembly of beams and rods for distributing any load (reinforced foundations).
AO does not have to consent in which case redesign and underpin instead.
What are the subsections that apply for issuing notice under section 6?
Subsection 6(1) three metres
Subsection 6 (2) six metres
For St Davids Drive, what did you serve with your party wall notice?
Drawings in relation to the party wall
Method statement
Where would you find guidance on the Party Wall Act? What is De Minimous work?
RICS Party Wall Legislation and Procedure 7th Ed 2022
Party Wall etc Act 1996 explanatory booklet on gov.uk
Works too small to be meaningful or taken into consideration, like inserting a nail in a wall, re-plastering
For St Davids Drive, what did you include in your party wall notice?
BO name and address, signed, dated, served on all AOs, scope of works and start date.
For St Davids Drive, did you need a third surveyor?
No, my colleague was named as agreed surveyor therefore no third surveyor was needed
What should the client have as per the Control of Asbestos Regulations 2012?
Asbestos Management Plan and Asbestos Management Survey updated at least every 6-12 months
Under the Control of Asbestos Regulations, who is the main duty holder?
The dutyholder is the owner of the non-domestic premises /common areas of domestic premises or the person or organisation that has clear responsibility for the maintenance or repair of this premises.
What properties would you expect to find asbestos? When was asbestos banned?
Pre 2000 buildings. First ban was 1985 final ban was November 1999.
For Montague Graham Court, what is Part M of the Building Regulations? What are the different sections?
Access to and use of buildings. Cat 1 visitable dwelling, cat 2 accessible and adaptable dwellings, cat 3 wheelchair unit dwelling.
For Montague Graham Court, what are the response times for building regs and planning approval? How long is each valid for?
Planning is 8 weeks and Building Regulations is 5 weeks. Each is valid from 3 years after approval.
Can you simply construct a shed in your garden?
Depends on size and area of shed as to whether it consitutes as development or building work under the respective acts
When do you not need planning permission? Give an example?
Extension or shed which does not meet the height or size requirements to be considered as development requiring planning permission.
You can perform certain types of work without needing to apply for planning permission. These are called “permitted development rights”.
When do you not need building regulations approval? Give an example
You do not need to apply for approval yourself if the work is not covered by building regulations, or if it’s carried out by someone who’s registered with a competent person scheme.
For example most repair work and sanitaryware and kitchen fittings
For Axe Street, what were the H&S safeguarding measures in place?
- Toolbox talks
- Inductions
- Slingers
- Edge protection
- Heras fencing
- PD inspections
- CPP on site
For Axe Street, what is edge protection?
Roof edge protection is fall protection equipment
What legislation requires Building Control approval and planning approval to be sought?
Building Act 1984
Town and Country Planning Act 1990
Give examples of work which would require Building Control approval?
Defined as building work under the Building Act 1984.
Can include new build, extension, change of use, cavity wall insulation insertion, electrical rewiring, etc