Level Exam Review Flashcards

(6 cards)

1
Q

A cement that is used when concrete forms must be removed as soon as possible is Type —

A

III (3)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

To control water seepage in excavations that have a high water table, the commonly used retention material is

A

steel-sheet piling

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

When the signal person stands with arm extended, thumb pointing down, and flexes her fingers in and out, the crane operator is to

A

lower the boom and raise the load

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

The signal given by extending both arms and moving them rapidly back and forth horizontally is

A

Emergency stop

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

When the signal person holds the forearm vertical, with the forefinger pointing up, and moves the hand in a small circle, the crane operator is to

A

hoist the load

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

As the angle between two slings increases along the horizontal plane, the amount of tension on a pair of slings

A

increases

How well did you know this?
1
Not at all
2
3
4
5
Perfectly