Limits Flashcards
Max ALT Boom AAR for Small RCVR, Heavy and F-15
35000ft, 30000ft, 35000ft
Max ALT Boom deployed for small RCVR, heavy and F-15
41000ft, 30000ft and 35000ft
Min height boom deployed
1500ft AGL
Boom deployed min and max airspeeds
Min: higher of Va PROT or 180 kcas
Max: lower of 325 kcas or M0.86
Boom AAR small min and max airspeed
Min: higher of Va PROT or 180 kcas
Max: lower of 325 kcas and M0.86
Boom AAR heavy min and max speeds
Min: higher of Va PROT or 225 kcas
Max: lower of 300 kcas or M0.80
Boom AAR F-15 min and max airspeed
Min: higher of 250 kcas or Va PROT
Max: lower of 315 kcas or M0.80
Max ALT pod AAR
35000ft
Max ALT hose(s) trailed
41000ft
Min height hoses trailed
1500ft AGL
Min and max airspeed pod AAR
Min: higher of Va PROT or 180 kcas
Max: lower of 325 kcas or M0.86
Between -50 and -54 degrees, max time hose trailed without fuel transfer?
15 mins
Min temp for hose to be trailed
-54 degrees
Are receiver NVG ops permitted while BEVS IR lights are switched on?
No.
IR lights can only be used in operations at night or under degraded visual conditions.
AAR can continue with how many hyd system failures?
1
Is it permitted to deploy boom or hoses in icing conditions?
No
What do you do if the boom or hoses are deployed and you fly into icing conditions?
Stow them
Actions if refuelling a receiver and ice accretion is suspected or found?
Disconnect any receiver and maintain the refuelling device deployed until it is free of ice.
A boom fight control check must be performed prior to recommending AAR.
Can the boom be deployed when the pods are in trail?
No
Boom AAR/ Tanker law is permitted in what CONF?
0
Is boom/pod AAR permitted in covert mode?
No
When in manual tanker operation, what 2 AAR pumps must not be selected at the same time due to a blue hydraulic circuit limitation?
1 and 4
Can boom and/or hoses be deployed in severe turbulence?
No
What do you do with boom, hoses and UARRSI in stormy weather conditions?
Stow and power off boom and hoses
UARRSI door closed