Field offices and living quarters shall be constructed within ___ months upon the commencement of the works.
A. 1
B. 2
C. 3
D. 4
C
Field Office and other facilities provided by the contractor shall be within the ___ radius or preferable near the job site
A. 3 km
B. 4 km
C. 5 km
D. 2.5 km
C
Based on Survey and staking requirements, when the centerline horizontal curve radius is less than or equal to 150 m and vertical parabolic curve radius is less than or equal to 100 m, cross-section shall be taken at a maximum centerline spacing of ___.
A. 5m
B. 10m
C. 15m
D. 20m
B
Based on survey and staking requirements when the centerline horizontal curve radius is greater than 150 m and vertical parabolic curve radius is greater than 100 m, cross-section shall be taken at a maximum centerline spacing of ___.
A. 5m
B. 10m
C. 15m
D. 20m
D
If the slag is used on structural concrete, its density shall be less than ___.
A. 1,120 kg/m
B. 980 kg/m
C. 1,150 kg/m
D. 960 kg/m
A
Fly Ash, if specified or permitted as a mineral admixture, it shall not exceed ___ partial replacement of Portland Cement in concrete mix.
A. 5%
B. 10%
C. 15%
D. 20%
D
What is the maximum stacking layers of cement if the storage period is more than 60 days?
A. 10 layers
B. 7 layers
C. 12 layers
D. 14 layers
B
What is the maximum stacking layer of cement if the storage period is less than 60 days?
A. 10 layers
B. 7 layers
C. 12 layers
D. 14 layers
D
For timber forms, it is important that the moisture content of the timber that will be used to make the formwork in between ___.
A. 10 - 15%
B. 5 - 10%
C. 10 - 20%
D. 15 - 20%
D
What is the minimum thickness used for metal forms or of such thickness that the forms remain true to shape?
A. 2.5 - 3.0 mm
B. 2.0 - 3.0 mm
C. 3.0 - 5.0 mm
D. 3.5 - 4.0 mm
A
What is the minimum wall thickness of structural steel tubes used as support for forms?
A. 3.0 mm
B. 2.0 mm
C. 5.0 mm
D. 4.0 mm
D
What is the minimum slump of Lean concrete?
A. 30 mm
B. 25 mm
C. 50 mm
D. 75 mm
B
What is the maximum slump of Lean concrete?
A. 30 mm
B. 25 mm
C. 50 mm
D. 75 mm
D
For structural concrete, no deduction on payment will be made for the volume occupied by the pipe less than ___ outside diameter nor for reinforcing steel, anchors, weepholes, or expansion materials
A. 100 mm
B. 101 mm
C. 50 mm
D. 51 mm
B
What is the minimum pre-streaming period after placement of the concrete for pre-cast members?
A. 4 hrs
B. 3 hrs
C. 5 hrs
D. 2.5 hrs
A
What is the minimum curing period of Pre-Cast Concrete (except piles) by the water method?
A. 5 days
B. 7 days
C. 10 days
D. 14 days
B
All newly placed concrete for pre-cast concrete piles, conventionally reinforced or prestressed shall be cured by the “Water Method” except that the concrete shall be kept under moisture for at least ___
A. 5 days
B. 7 days
C. 10 days
D. 14 days
D
The rammed aggregate column is a system that could work well on most types of soils such as sands, clays, silts, and peat and could work equally well in these types of soils. What is the minimum depth of application?
A. 3m
B. 2m
C. 5m
D. 7m
C
What is the maximum sulfate content of filling materials used for reclamation?
A. 3%
B. 2%
C. 5%
D. 7%
B
The reclamation area shall be filled to the finished elevation shown on the Plane as approved by the Engineer with an allowable tolerance of ___
A. +- 25mm
B. +- 50 mm
C. +- 75 mm
D. +- 100 mm
D
An allowance of ___ shall be acceptable for over dredging, but in no case shall the entire dredging area be dredged to the allowable ___ tolerance.
A. 300 mm
B. 250 mm
C. 500 mm
D. 750 mm
A
The top edge of dredging works shall not be closer than ___ from existing riverbanks and/or river structures such as dikes, revetment, spur dikes and other river training structures.
A. 30 m
B. 20 m
C. 10 m
D. 15 m
C
What is the minimum floor area for medical room and first aid facilities?
A. 6 sqm
B. 10 sqm
C. 12 sqm
D. 15 sqm
D
What is the minimum glazed window area for medical rooms and first aid facilities?
A. 2 sqm
B. 3 sqm
C. 4 sqm
D. 5 sqm
A