Materials & Materials Flashcards

(36 cards)

1
Q

MR Building Product Disclosure

Option 1

A

20 Products / 5 Manufacturers

  • ISO 14044
  • EPD
  • USGBC Approved
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

ASHRAE Codes

A

0-2005 : The Commissioning Process

  • Annex O : Basics Manual Standard
    1. 1-2007 : HVAC&R Tech Requirements for Commissioning
    90. 1-2010 : Energy Standards for Buildings [Baseline Performance]
  • Appendix B : Climate Zone
  • Appendix G : Energy Modeling
    62. 1 : Default Occupancy Assumptions
    189. 1 : Cooling Towers
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Bike Calculations

A

Slots for Short Term Users = Peak Users x 0.025
Slots for Long Term Users = Regular Users x 0.05

2 Minimum slots for each

1 Shower for every 100 people, +1 for every 150 thereafter

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Parking Calculations

A

Project Area / Capacity = Baseline

(Total Baseline - Provided Capacity) / Total Baseline x 100 = Parking Reduction

No LT Credit Surrounding Density and Diverse Uses
OR
No LT Credit Credit Access to Quality Transit
20% Reduction = 1 pt
40% Reduction = 2 pt

Earning Points
40% Reduction = 1 pt
60% Reduction = 2 pt

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

MR Demo Waste Management Plan

A

5 Materials Diverted
Calculate % of Overall Project Waste
Separated or Commingled Waste Stream
Diversion Strategy Proposed

Excludes land clearing waste & alternative daily cover (ADC)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

MR Diversion Rate Calculation

A

(% Diverted from Landfill / Total Waste of Project) x 100

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

MR List of Materials

A
Segregated Waste:
Mixed Paper
Corrugated Cardboard
Glass
Plastic
Metals

Safe Collection:
Batteries
Mercury Containing Lamps
Electronic Waste

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

MR Valuation Value

A

Calculated for each Component:
Product Cost x % Weight x % Sustainable Material

Within 100 miles = 200% of the cost

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

MR Top Strategies

A

Reduce
Reuse
Recycle
Waste Energy

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

MR Building Product Disclosure (EPD)

Option 2

A

50% by Cost

100 mile = 200%

3rd Party Certified
USGBC Approved

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

MR Building Product Disclosure (EPD)

Definitions

A
PCR (Product Category Rule)
EPD (Environmental Product Declaration)
LCA (Life Cycle Assessment)
LCIA (Life Cycle Impact Assessment)
LCI (Life Cycle Inventory)
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

MR Building Product Disclosure (EPD)

Exemplary Performance

A

Option 1 : 40 Products

Option 2 : 75% Comply

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

MR Building Product Disclosure (EPD)
Option 1
Calculations

A

(# Products with Specific Declarations x 0.25) +
(# Products with Industry Declarations x 0.5) +
(# Products with Type III EPDS x 1)
= Total # of Products

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

MR Building Product Disclosure (EPD)
Option 2
Calculations

A

(Perm Products x Location)/Criterion Valuation Factor x 100 +

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

MR Building Product Disclosure (Ingredients)

Option 1

A

20 Products
5 Manufacturers

Limited to those 0.1% (PPM) or greater

  • ANSI/BIFMA
  • ANSI 336
  • Health Declaration
  • Cradle to Cradle
  • USGBC
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

Project CIR

17
Q

Addendas

18
Q

Project Interpretations

19
Q

Project Fees are calculated taking into consideration:

20
Q

Overlapping Benefit

21
Q

LEED Certification Revoked

A

Does not comply with he minimum program requirements (MPR)

Typically applies when occupancy levels are not maintained

22
Q

Technical Advice

A

Responses with Comments and/or technical advice is done for credit to be earned.
Inconsistencies in the forms against the rating system or reference guides, contact LEEDonline.com
Technical customer care service provides support for existing LEED applications, guidelines and or processes.

23
Q

Submitting Application for Review

A

Responses with Comments and/or technical advice is done for credit to be earned.
Preliminary review can be accepted or documents can be updated or created for additional credits for the final review as deemed necessary.

24
Q

Adaptations

A

Adapting existing rating systems and their credits to respond to particular needs, constraints and opportunities of different project types.

25
Addenda
Corrections, interpretations and alternative compliance paths (ACPs). Incorporate changes previously raised and subject to USGBC committee review published quarterly
26
Recertification
Used by Existing Buildings to maintain high building standards
27
Interpretations
Official answers to formal technical inquiries about implementing LEED, provides clarity on existing options
28
Innovation
1-5 points Doubling requirements Incremental Percentage Threshold LEED AP Specialist
29
Pilot
1-4 Points Can pursue as many as the client wants, but points limited by the innovation credit Cannot use if not on the rating system list for ID+C
30
Exemplary Performance
1-2 Points
31
MR Innovation Credits
32
LT Innovation Credits
Doubling transit point thresholds
33
ER Credit Quality Views Innovation Credits
View for 90% of regularly occupied areas
34
ER Credit Low Emitting Materials Innovation Credits
100% of products must meet the requirements
35
Regional Alternative Compliance Paths
Paths for Geographical & Climactic Regions
36
Local Equivalent Definition
Must two criteria in order to be accepted: Meet the credit’s intent leading to or similar to better outcomes Accepted by industry experts