module 2 Flashcards
(36 cards)
off-site concrete vs poured in place
off site is already pre-cast
structure component used in hight rise building other then concrete
STEEL
new commercial structure must comply with
Accessibility requirement *
a new commercial development near a
A HIGHWAY MAY REQUIRE AN ADDITIONAL PERMIT
GREEN SPACE
allocation for an undeveloped portion of a total lot area
office classification for a landmark property with highest rent rates
class A+
an office condominium
type of ownership with exclusive ownership of an office unite and a percentage share of common area
site plan approval involving a property in a flood plain require
conservation authority approval
class C
an office for a property more than 20 years old
site plan control
affect building layout and site amenities
daylighting
setback requirement to achieve unobstructed sight lines form building on corner lot
official plan
detail general policies for future land use municipality
shade control
height of a commercial building maybe be limited by a municipality shade control
shade control
height of a commercial building maybe be limited by a municipality shade control
minimum zoning requirement involving setback distance form the street
minimum zoning requirement involving setback distance form the street
Ontario fire code
life safety systems are regulated under the PFC
egress forma building
EXIT
FAR - floor area ratio
big box
usually built on inexpensive industrial land
outlet
mall containing factory direct stores
Minimum Distance Separation (MDS)
minmum requirement between existing and new livestock facility on a farm
central
multi-floor in which elevators are located core
central
multi-floor in which elevators are located core