Module 4: WBS - Work Breakdown Structure (ch4) Flashcards
(16 cards)
WBS
Work Breakdown Structure
What is WBS - Work Breakdwon Structure?
A WBS is a hierarchical breakdown of a project into smaller, more manageable components. It’s a tool used in project management to help complete complex projects more efficiently.
WBS dictionary
provides detailed information about each item in the WBS. Each item can be described in point form, or in paragraph form
QUIZ: The main purpose of project planning is to guide project execution
True
QUIZ: A scope baseline is a document used to integrate and coordinate all project planning documents.
False
QUIZ: The project management plan does not contain budget information.
False
QUIZ: All elements in the WBS must be nouns
True
QUIZ: An (???) is large user story that is composed of multiple smaller user stories.
Epic
QUIZ: (???) describes product characteristics and requirements, user acceptance criteria, and deliverables.
Scope statement
QUIZ: (???) is a formal acceptance of deliverables by the sponsor.
Validation
QUIZ: The (???) is a deliverable-oriented grouping of work for a project.
WBS - Work Breakdown Scope
QUIZ: (???) are conditions or capabilities that must be met by the project or present in the product, service, or result to satisfy an agreement or other formally imposed specification.
Requirements