MSTC Flashcards

(85 cards)

1
Q

Inform and advise road users of directions, distances, routes, the location of services for road users and point of interest

A

Guide signs

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

To level a floor or layer of concrete with a straight edge using back and forth motion while moving across surface

A

Screeding

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Process of proportioning , cement, water, aggregates, and additives prior to mixing called

A

Batching

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Device mounted on a fixed support or portable support whereby a specific message is conveyed by means of work or symbols for the purpose of regulating, warning, or guiding traffic

A

Roadwork signs

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Cement, Aggregates, and water

A

Bulk composition

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Written instruction detailing how the facility is to be constructed

A

Specifications

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Wave generated in deep water, when reaching shoaling waters, charges not only its height but also in its length but the period will

A

decrease

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Maximum wave height and wave period of the maximum wave height in wave train

A

Significant wave

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

When directly affected and generated by local winds, a wind wave is

A

wind sea

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Failure of the stability of slopes, generally occurs along

A

a curved surface

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Measures of congestion highway capacity, what will happen as density continues to increase

A

speed declines

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Ways to avoiding traffic conflicts

A

Grade separation
Time sharing
Space sharing

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

The difference between the actual travel time of a given segment of a transportation system and some ideal travel time

A

delay

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

cracks approximately at right angles to the pavement

A

Transverse crack

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

Provision of safety sight distance

A

Road: geometry, surface, topography, and illumination

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

Provision of safety sight distance

A

Friciton
Eye-height

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
17
Q

2.5 days (tides)

A

Age of tides

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
18
Q

Usually a result of insufficient asphalt binder in the mix or stripping of asphalt from particles of aggregate

A

Raveling

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
19
Q

The most important process to prepare concrete

A

Batching

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
20
Q

A test to determine the relative consistency of concrete

A

Slump test

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
21
Q

Circumstances or deviation from standard condition which could permit an occurrence or incident

A

hazard

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
22
Q

The single most important environmental factor in the broad field of coastal engineering

A

Wave

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
23
Q

Combination of the likelihood of an occurrence of a hazardous event and severity of injury or damage of health of the people, property and environment

A

Risk

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
24
Q

Worst condition which should be considered in relation to the design of coastal defence

A

combination of usually high sea level with severe wave action

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
25
Which is more accurate parameter of traffic capacity
Density: Function of cars
26
Concept of safe design for construction
Design Equipment On-site facilities manpower
27
Occurs as concrete hardens, being greater in wet mixes
Shrinkage
28
Single initial application of bituminous material
Prime coat
29
ideal capacity of road in vehicles per hour
2000 veh/hr
30
Satisfy the requirement for estimating expected activity times in a PERT network
Makes use of three estimates Puts the greatest weight on the most likely time Motivated by BETA distribution
31
Stimuli fall into four categories
Mechanical Thermal Conductivity Chemical
32
Standard practice of measuring vertical or zenith angles
Instrument is level Sight exactly on the target Slight direct and reverse
33
Calculation of the probability that the critical path will be completed
Requires knowledge of the standard deviation
34
Probability of a mechanism that will function satisfactorily
Reliability
35
Objectives of proper compacting
Minimize settling Increase bearing Increase soil stability Reduce water penetration
36
When train passes on curves, which have no super-elevation
inner side of outer rail
37
Critical path
has the maximum expected time
38
All normal curves are
Bell-shaped and symmetric
39
Compress the bulk volume of concrete
Aggregates
40
Signs used to guide drivers through a change in horizontal alignment of the road
Chevron signs
41
The basic lane width appropriate for national road
3.35m
42
Operating a motor vehicle on a street or highway can be complex and boring
Driving Task
43
Any structure build into the sea but not parallel to the coast line
Pier
44
Because concrete is unable to maintain a particular shape before it sets, it must be placed in a form or mold
Formworks
45
What is the capacity requirement for all scaffoldings
At most, 4 times its own weight
46
It is a measure of a material’s ability to dissipate or deaden mechanical vibrations
Damping
47
It is an informal group discussion that focuses on a particular safety issue
Toolbox meeting
48
A method of protecting employees from cave-ins form materials that could fall or roll from an excavation face or collapse of adjacent structures
Protective System
49
A method of protecting workers from cave-ins by excavating the sides of an excavation to form one or series of horizontal steps
Benching
50
A formal or legally binding agreement between 2 parties
Contract
51
It occurs after the completion of construction and the resolution of the majority punchlist and commissioning issues
Turnover of a Project
52
This drawing has elevation as its vertical axis, and horizontal distance as measures along the centerline
Profile
53
The bucket volume contained within the bucket
Plate line capacity
54
What is the reaction time to be used for the safety design? This value is applied to the whole range of design speeds.
2.5 seconds
55
Is measure of a material’s ability to withstand cyclic (repeated) stresses.
Fatigue resistance
56
In a horizontal angle layout, this is a procedure that involves turning the angle twice and making the line of sight each time at the point.
Double centering
57
This is a source or situation with a potential cause to harm in terms of injury, ill health, damage to the environment or a combination of these.
Hazard
58
Every construction project shall have a suitable construction safety and health program, which must be in accordance with these rules and other orders and issuance issued by the DOLE.
Unsafe act
59
What is the color of the loading and unloading zone marking
Red
60
Does not cause a contract change
Unforseen conditions
61
If the standard deviation of a set of observation is 0, you can conclude:
that all observations are the same value
62
It is considered to be the basic unit of travel behavior.
Trip
63
It is the timing of signal in relationship to one another so that vehicles traveling at a determined speed can pass through the greens of successive signals.
Signal coordination
64
It represents the component of vehicle weight which acts parallel to an inclined surface
Grade resistance
65
These are circumstances or deviation from standard condition which could permit an occurrence of accident or incident is called
Unsafe condition
66
On what days of the week can the first day of century fail? The first day of the 20th century was Jan.1, 1901.
Monday
67
A measure of materials ability to resist indentation or penetration.
Hardness
68
An increase in soil density of a cohesive soil resulting from the expulsion of water from the soils void spaces.
Consolidation
69
Who is given authority to review reports of inspection, accident investigations and implementation of the program?
Health and Safety Committee
70
The process of injecting any agent into soil or rock to increase its strength or stability, project foundations or reduce ground water.
Grouting
71
Every construction project shall have a suitable ______, which must be in accordance with these rules, and other orders and issuances issued by the DOLE.
Construction Safety and Health Program.
72
What treatments might be made to improve the level of service
realigning the roadway
73
A benefit/cost analysis is to be performed to justify the installation of safety-related road improvements such as flexible barriers and breakaway poles.
Insurance records, state disability fund records, accepted federal standards, (basta panay pera)
74
Produces the greatest possible error in your initial speed calculations
The coefficient of friction is more sensitive to error
75
A line on a topographic map connecting points of equal elevation is known as
contour line
76
Greens theorem is the basis for determining the
surface area of a construction site
77
what is the preferred method to avoid negative stations in a construction document?
Station 0+00
78
A simple random sample is defined by
The method of selection
79
What are the sources of errors in making measurements
Natural Instrumental Personal
80
Lifting capacity of a crane
Decreases with an increase radius
81
Ideal capacity of road vehicles per hour
2000 veh/hr
82
Number of vehicles per unit distance occupying a section of road way
Density
83
Distance
Space headway
84
Time
time headway
85
Maximum speed
mean free speed