1
Q

Novice Librarian

A

Between 10 & 13

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Bringing of a concrete surface to true grade.

A

Leveling

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Pre molded inserts are placed in concrete slab to control cracking.

A

Jointing

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Ability to resist indentation/penetration.

A

Hardness

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Increase in soil density, resulting from expulsion of water.

A

Consolidation

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Given authority to review reports of inspection & accidents.

A

Health and Safety Committee

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Process of injecting any agent into soil.

A

Grouting

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Every construction project shall have ___.

A

Construction safety and health program.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Reason that will not cause a contract change.

A

Unforeseen Conditions

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

If standard deviation of set of observation is 0,

A

That all observations are same value.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Reaction time to be used for safety road signs.

A

2.5 seconds

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Ability to withstand cyclic stresses.

A

Fatigue Resistance

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Manner of moving straight edge back and fort with saw like motion.

A

Screeding

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

Turning angle twice and making line of sight each time at the point.

A

Double Centering

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

Source or situation with potential cause to harm.

A

Hazard

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

Human action that deviates from safe procedure, occurrence of accident.

A

Risk

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
17
Q

Color of loading and unloading zones.

A

Red

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
18
Q

More than a column driven into the soil to support a structure.

A

Piles

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
19
Q

Considered to be the basic unit of travel behavior.

A

Trip

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
20
Q

Timing of signal, vehicles can pass through greens & successive signas.

A

Signal Coordination

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
21
Q

Thermoplastic lane marking (visual, audio, motion)

A

Rumble Strips

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
22
Q

Component of vehicle weight which acts parallel to an inclined surface.

A

Grade Resistance

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
23
Q

Basic lane width appropriate on national road.

A

3.35 m

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
24
Q

Berth structure projecting out from shoreline.

A

Pier

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
25
Signs used to guide drivers (horizontal alignment)
Chevron Signs
26
Capacity required for all scaffolding.
At least 4 times of its weight
27
Essential elements: navigation, guidance, and control
Driving Task
28
Method of protecting employees from cave ins.
Protective System
29
Bucket volume contained within bucket.
Plate line capacity.
30
Signs that inform road users about direction & distances.
Guide Signs
31
Provides detailed requirements for materials equipment and workmanship.
Specifications
32
Time scheduling you should consider in preparation of PERT CPM
All of the above
33
Ability to dissipate mechanical vibrations.
Damping Capacity
34
Drawing has elevation as its vertical & horizontal axis.
Profile (Geometric)
35
Formal/legally binding agreement.
Contract
36
Informal group discussion
Toolbox Meeting
37
Occurs after the completion of construction and resolution.
Profile
38
Must be placed in a form or mold.
Formwork
39
By excavating sides of an excavation to form one/series of horizontal level/step.
Benching
40
Expected number of production
Mean
41
Cause of unusual sounds and change in building.
Temperature
42
All normal curves are bell shaped & symmetric
True Statements
43
Ideal capacity of road in vehicle per hour.
2000
44
Process of providing required water and temperature after placing concrete.
Curing
45
Process of transferring energy from wind to water, type of wave:
Gravity Wave
46
Application of hot bitumen
Tack Coat
47
Train passes on curves, no super elevation, give thrust on:
Inner side of outer trail
48
Used in determination of critical path method.
Network
49
Device mounted on a fixed support
Traffic Signs
50
Not a characteristic of contour
Contours on the ground can cross another
51
Standard shape for guide signs
Rectangle
52
% of tide of water level which is safe to ships depth of berth.
98 %
53
Maximum number of vehicles
Road Capacity
54
Warn road users
Warning Signs
55
Maximum sustain 15 mins rate of flow
Capacity
56
Which has greater displacement, player or ball?
The player & ball have same displacement
57
Type of control identified as primary, secondary & working.
Horizontal Control
58
Maximum number of vehicles, passenger or like
Volume
59
Waves which fall forward
Breaking Waves
60
Primary consideration in geometric cross sections for highways.
Drainage
61
Ratio of wave height to its wave length.
Steepness
62
MMLW means
Mean Lower Low Water
63
Two angles sum is 360 degrees
Conjugate Angles
64
Normally parabolas centered about point of intersection of vertical tangents.
Vertical Curve
65
Least of number of links must be disengaged from a 23 link chain.
4
66
Must be shown on site plans for orientation purposes.
North Directions
67
Open water of navigable depth
Fairway
68
Structure built but not parallel to coast
Pier
69
Consideration in avoiding bias in survey.
Taking care to choose individuals
70
Messages when painted should be limited
3 words or less
71
4 types of pavement & curve markings
Longitudinal Lines Transverse Lines Other Lines Other Markings
72
Structure built but parallel along
Wharf
73
Wave at point where water depth is 1/2 the wavelength.
Deep Water Wave
74
Exactly one defective
DNN, NDN, NND
75
Chance of probability a person will be harmed.
Risk
76
Single most important environment factor in coastal engineering?
Coastal Erosion
77
Source of potential damage/harm
Hazard
78
Basic concept for design in construction
Design of Structure
79
Determination of traffic capacity / number of vehicles per unit distance at given instant time.
Density
80
Test drive consistency of concrete
Slump Test
81
Most important process in preparing concrete / Proportioning prior to mixing concrete
Batching
82
Ways of avoiding traffic conflicts
All of the Above
83
Bulk composition of concrete
All of the above
84
Result of insufficient asphalt binder in the mix or stripping.
Raveling
85
Caused by shrinkage/differential thermal stress of asphalt
Transverse Cracking
86
Interval which may amount to as much as two & a half day
Age of Tides
87
_____ difference between actual travel time and a given segment of transportation and ideal travel time
Delay
88
What will happen as density continues to increase?
The point is reacted at which speed declines noticeably
89
Wave generated in deep water, changes not only on height & length but period will ____.
Remain Constant
90
When directly generated & affected by local winds.
Wind Sea
91
Maximum wave height and wave period of maximum wave height in wave train.
Highest Wave
92
Value of quantity is 3.5 must be less than 0.05
3.45 < x < 3.55
93
Ship with draft of 7.5 m
Standard water depth of berth (-7.5m) + design low tide (-0.35m) = (-7.8 m)