OM-A Flashcards
(19 cards)
What is the Max crew duty day if crewing in between 0500-1500L
16 hrs
What is the max crew duty day if crewing in between 1500-0459L?
14 hrs
What is the min CRP?
12 hrs
If CRP is between 18-30 hrs, by how much should the subsequent crew duty period be reduced?
2 hrs
What are the time limits for napping as non augmented crew?
20-45 minutes, completed 30 minutes before TOD
What are the approach limitations to fly a CDFA non precision approach?
3.77° GS
5° Offset
What is the lowest minima for a VOR/DME?
250ft
What is the lowest minima for a VOR?
300ft
What is the lowest minima for an NDB/DME?
300ft
What is the lowest minima for an LNAV/VNAV approach?
250ft
What are the planning minima for destination alternate airfields with a Cat1 ILS?
Non precision RVR and ceiling of MDA(H)
What are the planning minima for destination alternate airfields with a non precision approach?
Non precision RVR + 1000m and ceiling of MDA + 200ft
What are the planning minima for a destination airfield?
Normal operating RVR and ceiling at or above MDA(H)
If planning minima cannot be met for destination airfield, what contingencies must be carried out?
2 destination alternates required
What RFFS CAT does the A400 require?
8, 6 for RHP
What is the reduced hazard profile?
Min crew, max 15 POB, no pax,
When is a destination alternate not necessarily required?
The duration of flight does not exceed 6 hours and:
1: 2 separate runways are available and useable
2: the appropriate weather conditions or forecasts are fit for an hour either side of planned landing time
What are the requirements for using the 3% reduced contingency fuel?
Fuel En Route Alternate planned within a distance 20% total route distance from a point 75% of total route distance into route
When can an ARFF CAT 7 airfield be used as an alternate?
When no other suitable ARFF 8 aerodromes are available, Aerodrome operator has given approval, No DG carried