ONLINE CONTRACTORS TEST C12 Flashcards

1
Q

Earthwork excavation plan generally prepared with a scale of:

A

1 horizontal , 10 vertical

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

If the excavation is exceeding 5 feet in depth and 20 sq ft. In plan area with a depth not more than 1 foot, is termed as _________

A

Surface Excavation

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

A plot of land measures 40’x40’ with an average cut depth of 5 feet. How many cubic yards of soil will be cut ?

A

297 cu.yds

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

What is a KEY property that is useful in identifying rocks and minerals ?

A

Density

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

In mining and geological works, the drilling process is employed for:

A

Blasting
Exploration
Core Drilling

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

A highway with separated roadbeds for traffic traveling in opposing directions is referred as ________

A

Divided Highway

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

The specified minimum angle intersection for the roadways is ______ degrees.

A

75˚

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

The maximum super elevation rate specified for freeways, expressways, multi lane conventional highway is _______

A

0.10

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

What is the purpose of mechanical stabilization ?

A

Improving strength
Plasticity
Stability

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Grading is exceeds __________ cubic yards shall be performed as per the in charge engineers’ guidelines and approved grading plans.

A

5,000 cu.yds

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

According to CalTrans Standard specifications the type of cement used for cementitious stabilizations of soils is/are :

A

Type II AND Type V

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

The precise definition of “backfill” is __________

A

The material used to fill excavation

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

What is the maximum permitted slope steepness for the fill ?

A

2:1

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

If the slope height is more than 60 feet, it is recommended to construct the terraces at every _______ feet intervals .

A

30 feet

( terraces are required at every 30 feet intervals with base minimum width of 8 feet )

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

The import material used for the basement subgrade preparation shall be scratched to a depth of _______ inches below subgrade.

A

6 “

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

How should a contractor proceed when a concrete load has arrived on job site and the material comes out of the chute in lumps ?

A

Reject the load

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
17
Q

What is the allowable lippage between pavers ?

A

1/8”

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
18
Q

Handling unanticipated hazardous materials at the project site adds risk to who ?

A

The Owner

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
19
Q

The maximum allowable slope for excavation in general construction is ( Horizontal:Vertical) :

A

1:1

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
20
Q

The largest rock size permitted in road bed excavation fill if the finished grade is within 3 feet is _______ inches

A

3”

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
21
Q

The specified minimum and maximum width of single residential driveways should be ______ feet and ____ feet respectively .

A

12 ‘ and 20 ‘

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
22
Q

As per CalTrans earth specifications, the subgrade soil for the pavement is to be compacted to minimum of 95% laboratory density. This should be achieved to a minimum depth of ______ feet below the finished grade.

A

2.5 feet

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
23
Q

Imported backfill material shall not be more than ______ percent by weight of material passing No. 200 mesh sieve

A

10%

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
24
Q

Excavated materials is generally classified into:

A

Loose rock
Solid rock
Common excavation

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
25
Q

If authorized, controlled low-strength material may be used as structure backfill for pipe culverts unless the culvert has a diameter of more than ____ feet

A

20 feet

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
26
Q

According to California Test maximum plasticity index permitted for the backfill material is ______

A

20%

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
27
Q

The specified minimum R-value for the imported backfill material is ______

A

45

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
28
Q

What does the cloud shape represent on a blueprint ?

A

Revisions

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
29
Q

Is it recommended that OPTIONAL right-turn lanes should not be used in combination with right turn only lanes on roads where what type bicycle lanes is present ?

A

Type II

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
30
Q

What are examples for Type B soils ?

A

Silt , silty loam, sandy loam, granular cohesive solids including angular gravel ( crushed rock )

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
31
Q

What are examples for Type A soils ?

A

Clay, silty clay, clay loam and sandy clay

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
32
Q

What are examples for Type C soils ?

A

Granular soils, sand, gravel , loamy sand, submerged oil and rock

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
33
Q

The dimension mentioned for the earth measurements are _______ distances

A

Horizontal

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
34
Q

When placing an aggregate for a highway, what piece of equipment is not required on the first day ?

A

Scraper

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
35
Q

What does the “ F “ mean on the grading stake ?

A

Fill stake

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
36
Q

On a highway plan, what does “RA” stand for ?

A

Reclaimed asphalt

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
37
Q

What does “PG” refer to on the grading stakes ?

A

Pad grade

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
38
Q

The specified minimum angle of intersection for the roadways is _____ degrees

A

75

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
39
Q

Slurry cement backfill must be fluid workable and shall contain at least ______ pounds of cement per cubic yard

A

188 lbs

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
40
Q

The minimum specified vertical clearance over the travelled way for conventional highways or parkways is ______ feet

A

15 feet

41
Q

What is the height of the object that is used to determine the stopping sight distance in highway design ?

A

1/2 foot

42
Q

The soils resulting from the parental soil having rock characteristics is generally referred to as ?

A

Residual

43
Q

What is the recommended primary roller weight for the soil compaction, if the thickness of compaction is more than 12” ?

A

25 tons

44
Q

What does a slope of 4:1 refer to ?

A

4 feet run for every 1 inch rise

45
Q

The flexible pipe culverts, the minimum height of controlled low-strength material must be ____ times the pipe culvert diameter or height

A

0.7

46
Q

If the excavation is exceeding 5 feet in depth and 20 sq ft . In palm area with a depth not more than 1 foot, is termed as __________

A

Surface Excavation

47
Q

Elastic behavior of soil refers to as soil that ______

A

Regains its shape

48
Q

Which factors contribute to health risk while working under cold conditions ?

A

Type of clothing
Duration of exposure
Work schedule

49
Q

The maximum grade permitted for the urban highways on rolling terrain is ____%

A

5%

50
Q

The borrow definition of “borrow” is :

A

Earth material acquired in grade filling

51
Q

Cement grouted pavement is classified as _______

A

Semi-rigid pavement

52
Q

Slopes can be well maintained by ______

A

Landscaping

( landscaping can prevent erosion )

53
Q

The sopping sight distance generally depends on :

A

Speed of vehicle
Reaction time of driver
Brake efficiency

54
Q

What is the minimum standard scale used for preparation of the grading plan?

A

Shall not be less that 1”:40’

55
Q

Fill density ( compaction ) test is generally done at every _______ cubic yards of filling.

A

1000 cu.yds

56
Q

While calculating the sight distances , the driver’s eye above road surface assumed to be ______ feet

A

3 1/2 feet

57
Q

When adding passing or climbing lanes or right turn lanes, what is the minimum width of the adjacent shoulder ?

A

4 feet

58
Q

The type of grade separator, generally preferred at the intersection of two roads for the traffic to move without any interference, is _________

A

Clover leaf

59
Q

Soil investigation report of two bore holes confirms that there is rock strata at the level of 8 feet from the surface. The bore holes are 40 feet apart. While excavating between the bore holes, it was found that the surface has normal soil and no rock was found. This condition is categorized as :

A

Unclassified excavation

60
Q

Hot air blasting is one of the methods used for cleaning and drying the pavement cracks. The minimum are pressure to be maintained for this is _____ psi.

A

97 psi

61
Q

What is the minimum vertical falsework clearance required over the freeways ?

A

15 feet

62
Q

What is the MAXIMUM permitted slope steepness for the fill ?

A

2:1

63
Q

What is the bottom most layer in a roadway design ?

A

Subgrade

64
Q

The cold pour materials used for crack sealing are generally ________ based .

A

Silicon

65
Q

Fineness test on cement is conducted to ascertain:

A

Rate of hydration
Setting time
Rate of hardening

66
Q

CalTrans recommends the setback requirements for the building adjacent to the graded and natural terrain. What is the maximum setback requirement for the building at the toe of the slope ?

A

15 feet

67
Q

The fabrics or grid interlayers placed between the pavement structure and the subgrade are called _______

A

Geosynthetics

68
Q

The responsible person for the safety and health issues at the construction site is/are ________

A

Residential engineer

69
Q

In restricted situations with two lanes highway on mountainous terrain, the rate of change of cross slopes shall not exceed ____% per 100 feet.

A

6%

70
Q

If the actual physical site conditions differ materially from the conditions represented in the contract document, the type of the site condition in this case would be what type ?

A

Type I

71
Q

In a sloping terrain, it is recommended to use _______ travel lanes in order to reduce the cut and fill.

A

One way

72
Q

As per standard, the total cost of the environment impacts due to mitigation activities, contributes to about ____% of the total project budget

A

3%

73
Q

The methods used for placing the crack treatment materials are:

A

Flush fill
Overband
Reservoir
Back Rod

74
Q

The most important requirement for the pervious pavement is _______

A

Ability of infiltration

75
Q

As per standards , the maximum super elevation in hill roads shall NOT exceed ______%

A

10%

76
Q

When the bituminous surfacing is done on already existing black top road or over existing cement concrete road, the type of treatment given is _______

A

Tack coat

77
Q

If the R- value of the sub-grade is more than ______, the sub base is not recommended for the pavement.

A

40

78
Q

For the conventional highways in one-way tunnels, the minimum side clearance from the edge of the travelled way shall be _____ on the left and ____ on the right

A

4’ 6” Left

6’ 0” Right

79
Q

What is the maximum specified grade for the gutter at a driveway ?

A

20%

80
Q

Penetration test on bitumen is used for determining its _____

A

Grade

81
Q

The temperature under which the hot pour materials used for crack treatment must be with ______ ˚F

A

370˚ - 390˚

82
Q

California Tilt-Oven test is used for testing the Asphalt _____

A

Durability

83
Q

Per guidelines, the minimum lighting requirements for the nighttime working on highways is _____ lumens per square feet

A

5 lumens

84
Q

Pavement tensile strength or the bond strength is measured by using _______

A

Tensile strength apparatus

85
Q

Retaining walls that retain less than four feet of earth measured from the bottom of the footing , fall under which category ?

A

Category I

86
Q

California R-Value is the key factor to decide pavement design and thickness. The thickness of the hot mixed asphalt for the pavement, with R-Value greater than 40 is _____

A

0.15

87
Q

The maximum percentage of water absorption allowed for the aggregates used for road construction is ____%

A

0.6%

88
Q

The import material used for the basement subgrade preparation shall be scratched to a depth of _____ inches below subgrade

A

6 inches

89
Q

Street grades other than arterial and thoroughfares shall not exceed _____ %

A

15%

90
Q

What is the general width of the barricade wall along the highway in hilly terrain ?

A

20 inches

91
Q

The width of the crack sealant/filler material shall NOT exceed _____ inch on either side of crack

A

1/2”

92
Q

What factors need to be considered for the construction project near a school ?

A

Impact or noise and vibration
Air pollution
Discharge

93
Q

What is the minimum specified grade for the streets ?

A

1%

94
Q

According to the standards, what is the normal access width on expressways ?

A

30 feet

95
Q

What is the maximum size of aggregate to be used for the surface course of the pavement ?

A

1/2”

96
Q

According to the specifications, all surfaces shall be prevented from soil erosion by planting trees/shrubs , if the cut slopes exceeds ______ feet in height

A

5 feet

97
Q

According to CalTrans standards, the type of cement used for cementitious stabilization of soils is/are what type ?

A

Type II and Type V

98
Q

The minimum boring depth in soil exploration specified for a retaining wall is ______

A

2 times the wall height

99
Q

The function of an expansion joint in rigid pavements is to :

A

Allow free expansion