Photovoltaic (Solar Panel) Electrical Systems (AUC 351) Flashcards

(42 cards)

1
Q

Greatest Hazard of these Systems..?

A

DC- direct current shock

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Which system has fewer safety features..?

A

RESIDENTIAL

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Which arrays may be difficult or impossible to detect during nighttime hours?

A

INTEGRATED

FLUSH MOUNTED ARRAYS

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Firefighters must avoid____ on modules, since this can expose them to electric shock?

A

WALKING

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

When do we cut wires associated with a PV?

A

NEVER

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Shutting off power at the main electrical panel….?

A

does NOT ensure that all power to the building has been removed

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Where are PV disconnect (isolation) switches located?

A
roof
next to main electrical panel
adjacent to the inverter
nearby the charge controller
battery bank area
outside the building
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

OPENING PV DISCONNECT SWITCHES…?

A

DOES NOT ENSURE POWER IS OFF

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Rooftop disconnects…?

A

should not be relied upon

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Shut off electrical power to….?

A

INVERTER (inverters do have capacitors that store energy, however this energy will discharge soon after power to inverter is disconnected)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Firefighters discovering PV arrays at fires and emergencies, shall immediately..?

A

NOTIFY COMPANY OFFICER AND IC

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

For top floor/cockloft fires in non-fireproof buildings where fire is beneath the PV array..?

A

roof venting options, including power saws, may NOT BE POSSIBLE
cutting roof must be limited to areas, that are CLEAR OF PV ARRAYS AND OTHER COMPONENTS

-Ladder Ops INSIDE the building should be directed toward opening ceilings to define boundaries of fire

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

For top floor/cockloft fires in non-fireproof buildings where fire is beneath the PV array..?

A

roof venting options, including power saws, may NOT BE POSSIBLE
cutting roof must be limited to areas, that are CLEAR OF PV ARRAYS AND OTHER COMPONENTS

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

The decision to use Water on energized PV system, can only be made by…?

A

IC

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

HOW SHOULD WATER BE APPLIED?

A

FOG NOZLE, UTILIZED FROM A DISTANCE AND SET AT 30 DEGREE SPRAY PATTERN

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

Straight streams or Foam…?

A

should NOT BE USED

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
17
Q

PHOTOVOLTAIC SYSTEMS COULD ADD..?

A

THOUSANDS OF POUNDS TO ROOF SURFACE

18
Q

Removal of modules by FF’s is…?

A

NOT AN OPTION

utility company and licensed solar power installer/electrician should be contacted

19
Q

Incipient Fires can be extinguished using?

A

CLASS C (dry chemical) portable extinguishers

20
Q

Batteris involved in a fire, generate?

A

explosive, flammable, toxic and corrosive gases
full PPE
dry chem or foam may be effective on battery fires

21
Q

Combiner boxe_____be open by FF’s, in attempt to shutdown the PV array?

A

SHOULD NOT BE OPENED BY FF’S

22
Q

Wires running from the array to the power distribution system, should ALWAYS be considered ?

A

LIVE, unless there is a disconnect on the PV array itself

23
Q

On buildings with sloped roofs/PV arrays will generally be installed on …?

A

SOUTH AND WEST FACING SIDES

24
Q

When FF’s are working in close proximity to a PV system…?

A

SAFETY OFFICER should be assigned to the roof

25
Company Officers on BISP, or other outside activities, finding a HAZARDOUS condition relative to a PV system, that is IMMINENTLY PERILOUS TO MEMBERS OR OCCUPANTS DUE TO SIZE, LOCATION, ARRANGEMENT, DEFECTS, OR LACK OF MAINTENANCE, should?
request the response of the ADMINISTRATIVE BC
26
Buildings with PV systems should be...?
entered into CIDS
27
CIDS entries should include?
``` PV array on roof limited roof ops pv disconnects located at batter storage system located backup generator located installer contact number ```
28
All electrical PV array systems should be treated as...?
ENERGIZED | they do not turn off by flip of a switch
29
Integrated design...
serves as structural element (roof, wall, canopy or skylight) and REDUCES concentrations of added weight
30
Flush Mounted...
used with SMALL solar arrays and PEAKED roofs
31
Stand mount systems must be installed to..? | also known as UNIVERSAL mounting
withstand loads...used with LARGER solar panel systems
32
Stand mount systems must be installed to..? | also known as UNIVERSAL mounting
withstand loads...used with LARGER solar panel systems
33
The IC should delay overhaul...?
until CONFIRMATION that PV system has been shutdown
34
The IC should delay overhaul...?
until CONFIRMATION that PV system has been shutdown
35
Cells...
photovoltaic cell is the device that converts the sun's light energy into electricity by means of the photovoltaic effect
36
Module...
a module (solar panel) is an interconnected assembly of photovoltaic cells...cells are arranged in a grid like pattern on the surface of the module
37
Array...
modules in a PV array are normally first connected in SERIES to obtain correct voltage for the system (residential 600 volts are common)...individual leads are then connected in PARALLEL to allow system to add more amperage
38
Array...
modules in a PV array are normally first connected in SERIES to obtain correct voltage for the system (residential 600 volts are common)...individual leads are then connected in PARALLEL to allow system to add more amperage
39
PV arrays CAN PRODUCE ELECTRICITY on CLOUDY DAYS, not as much as on sunny days...but ...
DO NOT produce electricity at night
40
PRIME FOCUS of LADDER OPS...
opening/removal of skylights and scuttles, as well as horizontal ventilation
41
PRIME FOCUS of LADDER OPS...
opening/removal of skylights and scuttles, as well as horizontal ventilation
42
FF's discovering PV arrays at fires and EMERGENCIES should IMMEDIATELY NOTIFY...
their Company Officer and IC for relay to all members also, Inform IC if PV system is involved in FIRE and if it will negatively IMPACT VERTICAL VENT. OPERATIONS