Q

What are the 10 Knowledge Areas?

A
  1. Project Integration
  2. Scope
  3. Schedule
  4. Cost
  5. Quality
  6. Resource
  7. Communication
  8. Risk
  9. Procurement
  10. Stakeholder
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What are the processes for Project Integration Management?
(7 processes)

A
  1. Develop project charter
  2. Develop project management plan
  3. Direct and manage project work
  4. Manage project knowledge
  5. Monitor and control project work
  6. Perform integrated change control
  7. Close project or phase
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

What are the ITTOs associated with Developing the Project Charter?

4 Inputs
3 Tools & Techniques
2 Outputs

4 Inputs

Knowledge Area: Project Integration Management

A

Inputs
1. Business documents
2. Agreements
3. Enterprise environmental factors
4. Organizational process assets

Tools & Techniques
1. Expert judgment
2. Data gathering
3. Interpersonal and team skills

Outputs
1. Project charter
2. Assumption log

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

What are the ITTOs associated with Developing the Project Management Plan?

4 Inputs
4 Tools & Techniques
1 Output

Knowledge Area: Project Integration Management

A

Inputs
1. Project charter
2. Outputs from other processes
3. Enterprise environmental factors
4. Organization proces assets

Tools & Techniques
1. Expert judgment
2. Data gathering
3. Interpersonal and team management

Output
1. Project management plan

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

What are the ITTOs associated with Directing and Managing Project Work?

5 Inputs
3 Tools & Techniques
7 Outputs

Knowledge Area: Project Integration Management

A

Inputs
1. Project management plan
2. Project documents
3. Approved change requests
4. Enterprise environmental factors
5. Organizational process assets

Tools & Techniques
1. Expert judgment
2. Project management information system
3. Meetings

Output
1. Deliverables
2. Work performance data
3. Issue log
4. Change requests
5. Project management plan updates
6. Project documents updates
7. Organizational process assets updates

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

What are the ITTOs associated with Managing Project Knowledge?

5 Inputs
4 Tools & Techniques
3 Outputs

Knowledge Area: Project Integration Management

A

Inputs
1. Project management plan
2. Project documents
3. Deliverables
4. Enterprise environmental factors
5. Organizational process assets

Tools & Techniques
1. Expert judgment
2. Knowledge management
3. Information management
4. Interpersonal and team skills

Output
1. Lessons learned register
2. Project management plan updates
3. Organizational process assets updates

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

What are the ITTOs associated with Monitoring and Controlling Project Work?

6 Inputs
4 Tools & Techniques
6 Outputs

Knowledge Area: Project Integration Management

A

Inputs
1. Project management plan
2. Project documents
3. Work performance information
4. Agreements
5. Enterprise environmental factors
6. Organizational process assets

Tools & Techniques
1. Expert judgment
2. Data analysis
2. Decision making
3. Meetings

Output
1. Work performance reports
2. Change requests
3. Project management plan updates
4. Project documents updates

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

What are the ITTOs associated with Performing Integrated Change Control?

6 Inputs
5 Tools & Techniques
3 Outputs

Knowledge Area: Project Integration Management

A

Inputs
1. Project management plan
2. Project documents
3. Work performance reports
4. Change requests
5. Enterprise environmental factors
6. Organizational process assets

Tools & Techniques
1. Expert judgment
2. Change control tools
3. Data analysis
4. Decision making
5. Meetings

Output
1. Approved change requests
2. Project management plan updates
3. Project documents updates

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

What are the ITTOs associated with Closing the Project or Phase?

8 Inputs
3 Tools & Techniques
4 Outputs

Knowledge Area: Project Integration Management

A

Inputs
1. Project charter
2. Project management plan
2. Project documents
3. Accepted deliverables
5. Business documents
6. Agreements
7. Procurement documentation
8. Organizational process assets

Tools & Techniques
1. Expert judgment
2. Data analysis
3. Meetings

Output
1. Project documents updates
2. Final product, service, or result transition
3. Final report
4. Organizational process assets updates

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

What are the processes for Project Scope Management?
(6 processes)

A
  1. Plan scope management
  2. Collect requirements
  3. Define scope
  4. Create WBS
  5. Validate Scope
  6. Control Scope
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

What are the ITTOs associated with Planning Scope Management?

4 Inputs
3 Tools & Techniques
2 Outputs

Knowledge Area: Project Scope Management

A

Inputs
1. Project charter
2. Project management plan
3. Enterprise environmental factors
4. Organizational process assets

Tools & Techniques
1. Expert judgment
2. Data analysis
3. Meetings

Output
1. Scope management plan
2. Requirements management plan

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

What are the ITTOs associated with Collecting Requirements?

7 Inputs
8 Tools & Techniques
2 Outputs

Knowledge Area: Project Scope Management

A

Inputs
1. Project charter
2. Project management plan
3. Project documents
4. Business documents
5. Agreements
6. Enterprise environmental factors
7. Organizational process assets

Tools & Techniques
1. Expert judgment
2. Data gathering
3. Data analysis
4. Decision making
5. Data representation
6. Interpersonal and team skills
7. Context diagram
8. Prototypes

Output
1. Requirements documentation
2. Requirements traceability matrix

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

What are the ITTOs associated with Defining Scope?

5 Inputs
5 Tools & Techniques
2 Outputs

Knowledge Area: Project Scope Management

A

Inputs
1. Project charter
2. Project management plan
3. Project documents
4. Enterprise environmental factors
5. Organizational process assets

Tools & Techniques
1. Expert judgment
2. Data analysis
3. Decision making
4. Interpersonal and team skills
5. Product Analysis

Output
1. Project scope statement
2. Project document updates

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

What are the ITTOs associated with Creating WBS?

4 Inputs
2 Tools & Techniques
2 Outputs

Knowledge Area: Project Scope Management

A

Inputs
1. Project management plan
2. Project documents
3. Enterprise environmental factors
4. Organizational process assets

Tools & Techniques
1. Expert judgment
2. Decomposition

Output
1. Scope baseline
2. Project documents updates

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

What are the ITTOs associated with Validating Scope?

4 Inputs
2 Tools & Techniques
4 Outputs

Knowledge Area: Project Scope Management

A

Inputs
1. Project management plan
2. Project documents
3. Verified deliverables
4. Work performance data

Tools & Techniques
1. Inspection
2. Decision making

Output
1. Accepted deliverables
2. Work performance information
3. Change requests
4. Project documents updates

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

What are the ITTOs associated with Controlling Scope?

4 Inputs
1 Tools & Techniques
4 Outputs

Knowledge Area: Project Scope Management

A

Inputs
1. Project management plan
2. Project documents
3. Work performance data
4. Organizational process assets

Tools & Techniques
1. Data analysis

Output
1. Work performance information
2. Change requests
3. Project management plan updates
4. Project documents updates

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
17
Q

What are the processes for Project Schedule Management?
(6 processes)

A
  1. Plan schedule management
  2. Define activities
  3. Sequence Activitities
  4. Estimate activity durations
  5. Develop schedule
  6. Control schedule
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
18
Q

What are the ITTOs associated with Planning Schedule Management?

4 Inputs
3 Tools & Techniques
1 Output

Knowledge Area: Project Schedule Management

A

Inputs
1. Project charter
2. Project management plan
3. Enterprise environmental factors
4. Organizational process assets

Tools & Techniques
1. Expert judgment
2. Data analysis
3. Meetings

Output
1. Schedule management plan

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
19
Q

What are the ITTOs associated with Defining Activities?

3 Inputs
4 Tools & Techniques
5 Outputs

Knowledge Area: Project Schedule Management

A

Inputs
1. Project management plan
2. Enterprise environmental factors
3. Organizational process assets

Tools & Techniques
1. Expert judgment
2. Decomposition
3. Rolling wave planning
3. Meetings

Output
1. Activity list
2. Activity attributes
3. Milestone list
4. Change requests
5. Project management plan updates

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
20
Q

What are the ITTOs associated with Sequencing Activities?

4 Inputs
4 Tools & Techniques
2 Outputs

Knowledge Area: Project Schedule Management

A

Inputs
1. Project management plan
2. Project documents
2. Enterprise environmental factors
3. Organizational process assets

Tools & Techniques
1. Precedence diagramming method
2. Dependency determination and integration
3. Leads and flags
4. Project management information system

Output
1. Project schedule network diagrams
2. Project documents updates

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
21
Q

What are the ITTOs associated with Estimating Activity Durations?

4 Inputs
8 Tools & Techniques
3 Outputs

Knowledge Area: Project Schedule Management

A

Inputs
1. Project management plan
2. Project documents
2. Enterprise environmental factors
3. Organizational process assets

Tools & Techniques
1. Expert judgment
2. Analogous estimating
3. Parametric estimating
4. Three-point estimating
5. Bottom-up estimating
6. Data analysis
7. Decision making
8. Meetings

Output
1. Duration estimates
2. Basis of estimates
3. Project documents updates

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
22
Q

What are the ITTOs associated with Developing Schedule?

5 Inputs
8 Tools & Techniques
7 Outputs

Knowledge Area: Project Schedule Management

A

Inputs
1. Project management plan
2. Project documents
3. Agreements
4. Enterprise environmental factors
5. Organizational process assets

Tools & Techniques
1. Schedule network analysis
2. Critical path method
3. Resource optimization
4. Data analysis
5. Leads and lags
6. Schedule compression
7. Project management information system
8. Agile release planning

Output
1. Schedule baseline
2. Project schedule
3. Schedule data
4. Project calendars
5. Change requests
6. Project management plan updates
7. Project douments updates

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
23
Q

What are the ITTOs associated with Controlling Schedule?

4 Inputs
6 Tools & Techniques
5 Outputs

Knowledge Area: Project Schedule Management

A

Inputs
1. Project management plan
2. Project documents
3. Work performance data
4. Organizational process assets

Tools & Techniques
1. Data analysis
2. Critical path method
3. Project management information system
4. Resource optimization
5. Leads and lags
6. Schedule compression

Output
1. Work performance information
2. Schedule forecasts
3. Change requests
4. Project management plan updates
5. Project documents updates

24
Q

What are the processes for Project Schedule Management?
(6 processes)

A
  1. Plan schedule management
  2. Define activities
  3. Sequence Activitities
  4. Estimate activity durations
  5. Develop schedule
  6. Control schedule
25
What are the ITTOs associated with **Planning Cost Management**? 4 Inputs 3 Tools & Techniques 1 Outputs ## Footnote Knowledge Area: Project Cost Management
Inputs 1. Project charter 2. Project management plan 3. Enterprise environmental factors 4. Organizational process assets Tools & Techniques 1. Expert judgment 2. Data analysis 3. Meetings Output 1. Cost management plan
26
What are the ITTOs associated with **Estimating Costs**? 4 Inputs 8 Tools & Techniques 3 Outputs ## Footnote Knowledge Area: Project Cost Management
Inputs 1. Project management plan 2. Project documents 3. Enterprise environmental factors 4. Organizational process assets Tools & Techniques 1. Expert judgment 2. Analogous estimating 3. Parametric estimating 4. Bottom-up estimating 5. Three-point estimating 6. Data analysis 7. Project management information system 8. Decision making Output 1. Cost estimates 2. Basis of estimates 3. Project documents updates
27
What are the ITTOs associated with **Determining Budget**? 6 Inputs 6 Tools & Techniques 3 Outputs ## Footnote Knowledge Area: Project Cost Management
Inputs 1. Project management plan 2. Project documents 3. Business documents 4. Agrements 5. Enterprise environmental factors 6. Organizational process assets Tools & Techniques 1. Expert judgment 2. Cost aggregation 3. Data analysis 4. Historical information review 5. Funding limit reconciliation 6. Financing Output 1. Cost baseline 2. Project funding requirements 3. Project documents updates
28
What are the ITTOs associated with **Controlling Costs**? 5 Inputs 4 Tools & Techniques 5 Outputs ## Footnote Knowledge Area: Project Cost Management
Inputs 1. Project management plan 2. Project documents 3. Project funding requirements 4. Work performance data 5. Organizational process assets Tools & Techniques 1. Expert judgment 2. Data analysis 3. To-complete performance index 4. Project management information system Output 1. Work performance information 2. Cost forecasts 3. Change requests 4. Project management plan updates 5. Project documents updates
29
What are the processes for Project Quality Management? (3 processes)
1. Plan Quality Management 2. Manage Quality 3. Control Quality
30
What are the ITTOs associated with **Planning Quality Management**? 5 Inputs 7 Tools & Techniques 4 Outputs ## Footnote Knowledge Area: Project Quality Management
Inputs 1. Project charter 2. Project mangement plan 3. Project documents 4. Enterprise environmental factors 5. Organizational process assets Tools & Techniques 1. Expert judgment 2. Data gathering 3. Data analysis 4. Decision making 5. Data representation 6. Test and inspection planning 7. Meetings Output 1. Quality management plan 2. Quality metrics 3. Project management plan updates 4. Project documents updates
31
What are the ITTOs associated with **Managing Quality**? 3 Inputs 8 Tools & Techniques 5 Outputs ## Footnote Knowledge Area: Project Quality Management
Inputs 1. Project mangement plan 2. Project documents 3. Organizational process assets Tools & Techniques 1. Data gathering 2. Data analysis 3. Decision making 4. Data representation 5. Audits 6. Design for X 7. Problem solving 8. Quality improvement methods Output 1. Quality reports 2. Test and evalustion documents 3. Change requests 4. Project management plan updates 5. Project documents updates
32
What are the ITTOs associated with **Controlling Quality**? 7 Inputs 6 Tools & Techniques 6 Outputs ## Footnote Knowledge Area: Project Quality Management
Inputs 1. Project mangement plan 2. Project documents 3. Approved change requests 4. Deliverables 5. Work performance data 6. Enterprise environmental factors 7. Organizational process assets Tools & Techniques 1. Data gathering 2. Data analysis 3. Inspection 4. Testing/product evaluations 5. Data representation 6. Meetings Output 1. Quality control measurements 2. Verified deliverables 3. Work performance information 4. Change requests 5. Project management plan updates 6. Project documents updates
33
What are the processes for Project Resource Management? (6 processes)
1. Plan Resource Management 2. Estimate Activity Resources 3. Acquire Resources 4. Develop Team 5. Manage Team 6. Control Resources
34
What are the ITTOs associated with **Planning Resource Management**? 5 Inputs 4 Tools & Techniques 3 Outputs ## Footnote Knowledge Area: Project Resource Management
Inputs 1. Project charter 2. Project management plan 3. Project documents 4. Enterprise environmental factors 5. Organizational process assets Tools & Techniques 1. Expert judgment 2. Data representation 3. Organizational theory 4. Meetings Output 1. Resource management plan 2. Team charter 3. Project documents updates
35
What are the ITTOs associated with **Estimating Activity Resources**? 4 Inputs 7 Tools & Techniques 4 Outputs ## Footnote Knowledge Area: Project Resource Management
Inputs 1. Project management plan 2. Project documents 3. Enterprise environmental factors 4. Organizational process assets Tools & Techniques 1. Expert judgment 2. Bottom-up estimating 3. Analogous estimating 4. Parametric estimating 5. Data analysis 6. Project management information system 7. Meetings Output 1. Resource requirements 2. Basis of estimates 3. Resource breakdown structure 4. Project documents updates
36
What are the ITTOs associated with **Acquiring Resources**? 4 Inputs 4 Tools & Techniques 8 Outputs ## Footnote Knowledge Area: Project Resource Management
Inputs 1. Project management plan 2. Project documents 3. Enterprise environmental factors 4. Organizational process assets Tools & Techniques 1. Decision making 2. Interpersonal and team skills 3. Pre-assignment 4. Virtual teams Output 1. Physical resource assignments 2. Project team assignments 3. Resource calendars 4. Change requests 5. Project management plan updates 6. Project documents updates 7. Enterprise environmental factors updates 8. Organizational process assets updates
37
What are the ITTOs associated with **Developing Team**? 4 Inputs 8 Tools & Techniques 6 Outputs ## Footnote Knowledge Area: Project Resource Management
Inputs 1. Project management plan 2. Project documents 3. Enterprise environmental factors 4. Organizational process assets Tools & Techniques 1. Colocation 2. Virtual teams 3. Communication technology 4. Interpersonal and team skills 5. Recognition and rewards 6. Training 7. Individual and team assesments 8. Meetings Output 1. Team performance assessments 2. Change requests 3. Project management plan updates 4. Project documents updates 5. Enterprise environmental factors updates 6. Organizational process assets updates
38
What are the ITTOs associated with **Managing Team**? 6 Inputs 2 Tools & Techniques 4 Outputs ## Footnote Knowledge Area: Project Resource Management
Inputs 1. Project management plan 2. Project documents 3. Work performance reports 4. Team performance assessments 5. Enterprise environmental factors 6. Organizational process assets Tools & Techniques 1. Interpersonal and team skills 2. Project management information system Output 1. Change requests 2. Project management plan updates 3. Project documents updates 4. Enterprise environmental factors updates
39
What are the ITTOs associated with **Controlling Resources**? 5 Inputs 4 Tools & Techniques 4 Outputs ## Footnote Knowledge Area: Project Resource Management
Inputs 1. Project management plan 2. Project documents 3. Work performance data 4. Agreements 5. Organizational process assets Tools & Techniques 1. Data analysis 2. Problem solving 3. Interpersonal and team skills 4. Project management information system Output 1. Work performance information 2. Change requests 3. Project management plan updates 4. Project documents updates
40
What are the processes for Project Communications Management? (3 processes)
1. Plan Communications Management 2. Manage Communications 3. Monitors Communications
41
What are the ITTOs associated with **Planning Communications Management**? 5 Inputs 8 Tools & Techniques 3 Outputs ## Footnote Knowledge Area: Project Communications Management
Inputs 1. Project charter 2. Project management plan 3. Project documents 4. Enterprise environmental factors 5. Organizational process assets Tools & Techniques 1. Expert judgment 2. Communication requirements analysis 3. Communication technology 4. Communication models 5. Communication methods 6. Interpersonal and team skills 7. Data representation 8. Meetings Output 1. Communications management plan 2. Project management plan updates 3. Project documents updates
42
What are the ITTOs associated with **Managing Communications**? 5 Inputs 7 Tools & Techniques 4 Outputs ## Footnote Knowledge Area: Project Communications Management
Inputs 1. Project management plan 2. Project documents 3. Work performance reports 4. Enterprise environmental factors 5. Organizational process assets Tools & Techniques 1. Communication technology 2. Communication methods 3. Communication skills 4. Project management information system 5. Project reporting 6. Interpersonal and team skills 7. Meetings Output 1. Project communications 2. Project management plan updates 3. Project documents updates 4. Organizational process assess updates
43
What are the ITTOs associated with **Monitoring Communications**? 5 Inputs 5 Tools & Techniques 4 Outputs ## Footnote Knowledge Area: Project Communications Management
Inputs 1. Project management plan 2. Project documents 3. Work performance data 4. Enterprise environmental factors 5. Organizational process assets Tools & Techniques 1. Expert judgment 2. Project management information system 3. Data representation 4. Interpersonal and team skills 5. Meetings Output 1. Work performance information 2. Change requests 3. Project management plan updates 4. Project documents updates
44
What are the processes for Project Risk Management? (7 processes)
1. Plan Risk Management 2. Identify Risks 3. Perform Qualitative. Risk Analysis 4. Perform Quantitative Risk Analysis 5. Plan Risk Responses 6. Implement Risk Responses 7. Monitor Risks
45
What are the ITTOs associated with **Planning Risk Management**? 5 Inputs 3 Tools & Techniques 1 Outputs ## Footnote Knowledge Area: Project Risk Management
Inputs 1. Project charter 2. Project management plan 3. Project documents 4. Enterprise environmental factors 5. Organizational process assets Tools & Techniques 1. Expert judgment 2. Data analysis 3. Meetings Output 1. Risk management plan
46
What are the ITTOs associated with **Identifying Risks**? 6 Inputs 6 Tools & Techniques 3 Outputs ## Footnote Knowledge Area: Project Risk Management
Inputs 1. Project management plan 2. Project documents 3. Agreements 4. Procurement documentation 5. Enterprise environmental factors 6. Organizational process assets Tools & Techniques 1. Expert judgment 2. Data gathering 3. Data analysis 4. Interpersonal and team skills 5. Prompt lists 6. Meetings Output 1. Risk register 2. Risk report 3. Project documents updates
47
What are the ITTOs associated with **Performing Qualitative Risk Analysis**? 4 Inputs 7 Tools & Techniques 1 Outputs ## Footnote Knowledge Area: Project Risk Management
Inputs 1. Project management plan 2. Project documents 3. Enterprise environmental factors 4. Organizational process assets Tools & Techniques 1. Expert judgment 2. Data gathering 3. Data analysis 4. Interpersonal and team skills 5. Risk categorization 6. Data representation 7. Meetings Output 1. Project documents updates
48
What are the ITTOs associated with **Performing Quantitative Risk Analysis**? 4 Inputs 5 Tools & Techniques 1 Outputs ## Footnote Knowledge Area: Project Risk Management
Inputs 1. Project management plan 2. Project documents 3. Enterprise environmental factors 4. Organizational process assets Tools & Techniques 1. Expert judgment 2. Data gathering 3. Interpersonal and team skills 4. Representations of uncertainty 5. Data analysis Output 1. Project documents updates
49
What are the ITTOs associated with **Planning Risk Responses**? 4 Inputs 9 Tools & Techniques 3 Outputs ## Footnote Knowledge Area: Project Risk Management
Inputs 1. Project management plan 2. Project documents 3. Enterprise environmental factors 4. Organizational process assets Tools & Techniques 1. Expert judgment 2. Data gathering 3. Interpersonal and team skills 4. Strategies for threats 5. Strategies for opportunities 6. Contingent response strategies 7. Strategies for overall project risk 8. Data analysis 9. Decision making Output 1. Change requests 2. Project management plan updates 3. Project documents updates
50
What are the ITTOs associated with **Implementing Risk Responses**? 3 Inputs 3 Tools & Techniques 2 Outputs ## Footnote Knowledge Area: Project Risk Management
Inputs 1. Project management plan 2. Project documents 3. Organizational process assets Tools & Techniques 1. Expert judgment 2. Interpersonal and team skills 3. Project management information system Output 1. Change requests 2. Project documents updates
51
What are the ITTOs associated with **Monitoring Risk**? 4 Inputs 3 Tools & Techniques 5 Outputs ## Footnote Knowledge Area: Project Risk Management
Inputs 1. Project management plan 2. Project documents 3. Work performance data 4. Work performance reports Tools & Techniques 1. Data analysis 2. Audits 3. Meetings Output 1. Work performance information 2. Change requests 3. Project management plan updates 4. Project documents updates 5. Organizational process assets updates
52
What are the processes for Project Procurement Management? (3 processes)
1. Plan Procurement Management 2. Conduct Procurements 3. Control Procurements
53
What are the ITTOs associated with **Planning Procurement Management**? 6 Inputs 5 Tools & Techniques 10 Outputs ## Footnote Knowledge Area: Project Procurement Management
Inputs 1. Project charter 2. Business documents 3. Project management plan 4. Project documents 5. Enterprise environmental factors 6. Organizational process assets Tools & Techniques 1. Expert judgment 2. Data gathering 3. Data analysis 4. Source selection analysis 5. Meetings Output 1. Procurement management plan 2. Procurement strategy 3. Bid documents 4. Procurement statement of work 5. Source selection criteria 6. Make-or-buy decisions 7. Independent cost estimates 8. Change requests 9. Project documents updates 10. Organizational process assets updates
54
What are the ITTOs associated with **Conducting Procurements**? 6 Inputs 5 Tools & Techniques 6 Outputs ## Footnote Knowledge Area: Project Procurement Management
Inputs 1. Project mangement plan 2. Project documents 3. Procurement documentation 4. Seller proposals 5. Enterprise environmental factors 6. Organizational process assets Tools & Techniques 1. Expert judgment 2. Advertising 3. Bidder conferences 4. Data analysis 5. Interpersonal and team skills Output 1. Selected sellers 2. Agreements 3. Change requests 4. Project management plan updates 5. Project documents updates 6. Organizational process assets updates
55
What are the ITTOs associated with **Controlling Procurements**? 8 Inputs 5 Tools & Techniques 7 Outputs ## Footnote Knowledge Area: Project Procurement Management
Inputs 1. Project mangement plan 2. Project documents 3. Agreements 4. Procurement documentation 5. Approved change requests 6. Work performance data 7. Enterprise environmental factors 8. Organizational process assets Tools & Techniques 1. Expert judgment 2. Claims administration 3. Data analysis 4. Inspection 5. Audits Output 1. Closed procurements 2. Work performance information 3. Procurement documentation updates 4. Change requests 5. Project management plan updates 6. Project documents updates 7. Organizational process assets updates