1
Q

How far does the production casing extend to

A

From surface to the producing zones of the formation

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What does the production casing house

A

Production tubing, downhole pumps, and other equipment needed to produce oil and gas

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

What must the production casing cement job do

A

It must give a pressure-tight seal between the formations and the production casing

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

What problems can occur if fluids interacting with oil in the casing strings

A

If oil, water, and gas contact eachother in the wellbore, emulsions, scale deposits, paraffin deposits, severe corrosion and production decline can occur

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

What are the major purposes for production casing

A

Completes well for production
- Effect zonal isolation
- Protect pay zones from unwanted fluids
Provides pressure control
Cover worn or damaged intermediate casing
Provide a place to change out drill fluids to completion fluids which are compatible with the formations

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

What is a good substitue for production casing

A

Liners

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Why would a oil company choose to run liners vs

production casing

A

Major cost savings

Much less pipe weight

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

What are the characteristics of production casing

A

Common sizes of casing used are 4 1/2in, 5 1/2in, and 7 in
Drilling mud needs to be in good conidtion
Cement usually not circulated to surface but generally circulated back to the intermediate casing
Good cement job is vital to a successful completion

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Recommended Cement for Production Casing

A

Filler cements with high strength tail slurries
All potential pay zones are usually covered by low water ratio cements
Densified cements are commonly used for high competency and pressure control
Fluid loss control is usually necessary

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

What type of mixing is usually run for production casing

A

Batch mixing or continuous batch mixing

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

What products do we pump downhole for good mud removal

A

Spacers

Mud Flushes

How well did you know this?
1
Not at all
2
3
4
5
Perfectly