What would be the main consideration when constructing an expansion loop?
That the loop is not too small
How is poly pipe connected to a barbed fitting for a pump?
Using two gear clamps opposite in direction to each other
What must be done prior to performing a smoke test?
Fill traps and cap off all vents
Recirculation pump is causing cavitation on fittings downstream. How would you test for this condition?
Take an amperage reading on the pump
Water turning into vapour and back to water ( cavitation) when pump is working too hard. See if how much work the pump is doing with amperage reading
On which drawings would you find the location of a chiller?
Mechanical drawings
And a 120 V branch circuit, which of the following colours would be identified as being “hot“?
A.white
B.Red
C.green
D.bare
B.Red
In a 120 V branch circuit, which of the following colours would identify as a wire being“neutral“?
a.white
b.red
C.green
d. Bare
A. white.
What type of toilet seat is required for public use?
Open front
What wrench is best used for confined spaces
Chain wrench
Designed for confined spaces
Similar to strap wrench
Of the following choices, which does not occur in a septic tank
A.putreication
B.anaerobic decomposition
C.aerobic decomposition (oxidation)
D.septiczarion
C.aerobic decomposition/oxidation
How often must construction workers have his or her hearing test tested
Every year
A class “a” fire involves what
Wood
Location of a safety harness that a lanyard attaches to is where?
The back
You must not stand on which rungs of the ladder
The top two
What is the maximum height of a rolling freestanding scaffold?
Twice the minimum base dimensions
Above what height must a scaffold have guard rails?
10 feet
( or risk exists/ working 4’ above rebar)
The guard rails average hight from platform is between 40-44” ( answer on test is 42” for average) and the knee bar/ rail is in between
At 10’ guardrails or fall arrest!
Toe boards must be a minimum of how many inches in height
4 inches in height
Toe board is on scaffolding, it is the board that goes on the platform stopping tools from falling off the platform (also can’t have more than a 1/2” gap)
Before excavation can be started what must be located
Services
How many horn signals would indicate that blasting is about to start?
12 short signals
Following the blast, what indicates that it is safe to return
One long 5 second signal
A class “B” fire involves what?
Combustible liquids
A class “C“ fire involves what materials
Electrical materials
A class “D” fire involves what material
Combustible metals
In addition to fuel and oxygen of fire needs what
A source of ignition