Q&A2 Flashcards

(40 cards)

1
Q

Is TOI Next a process improvement for specification? Execution? Environment?

A
  • strategy
  • metrics
  • tools
  • environment
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

In test strategy procedd, , which is predetermined set of test conditions quality standard?

A

ISO 25000 replacing ISO 9126

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

What model, When test codes are all

completed when phase activities should ge completed before the bextnphase starts

A

Sequential:
V-model
Waterfall
W-model

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

After developing the test tool, what shall be done next?

A

Test the tool

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

In Defining and Using Test Metrics

, which testing metrics category measures the DEFECT DENSITY

A

PRODUCT METRICS:
extent if testing the product
and defect density

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

What is the Key characteristic of audits

A
  1. Lead auditor
  2. Evidence
  3. Documented results
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

What is the Key characteristic of mgmt reviews

A
  1. Conducted by:
    Managers
    Stakeholders
  2. Check consistency with and deviations from
    Plans
  3. Check adequacy of mgmt procedures
  4. Assess project risks
  5. Evaluate impact of actions and ways to measure these impacts
  6. Produce list of action items
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Open Source tool, what is the key characteristic ?

A

Can make chg and changes need to ve available to external users follow the same term applied as received

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Handed over defects fixed and assigned report to maintenance: what sdlc process?

A

Test Closure

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Test tool /lifecycle

A

Acquisition, Support and Maintenance, Evolution, Retirement____

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

IDEAL , what step where test process improvement is fully deployed?

A
ACTING to implement improvement:
Training
Mentoring
Piloting of processes
Full deployment
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Which defect information needs to support process improvement initiatives which the largest number of defects are introduced to enable targeted improvements to reduce the total number of defects?

A

Pareto analysis

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Who is generally responsible for managing the reported defects for a given project?

A

Cross functional team

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

What are the existing standards and docs tongelp

Test mgr determine which info to gather defect reporting?

A

Orthogonal Defect Classification

Standards
ISO 25000 replced ISO 9126
IEEE829
IEEE 1044

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

Testing Tools capabilities should test mgr consider

A

Analysis
Design
Data and test selection
Execution Evaluation

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

What should test mgr hire?

A

Proper MIX of skills

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
17
Q

What Test Mgr should maintain in a high pressure fast paced environment?

A

Maintain Set of skills

18
Q

What shld test mgr do when hiring? What skills if inherited a team with tech skills in auto tool, scripting tests?

A

mix of strong testing skills and domain skills

19
Q

What shld test mgr do?

A

Team cross-train each other

20
Q

Requirement-based technique

A

Cause-effect graphing

21
Q

When Sys performance is high risk, what shall be done?

A

Performance testing shall be run during unit and integration testing.

22
Q

If serious defect found in design specs

A

Addl static testing reviews of design specs should be done

23
Q

Risk based test strategy, what is used to guide in mitigating activities to reduce the product risk to gelp in contingency planning?

A

Risk Analysis

24
Q

Reactive strategy (dynamic testing)

A

Exploratory testing - test charters and tools

25
Risk Assessment - used for quality categorization
ISO 9136 replaced by ISO25000
26
If test execution is shortened due to a delay in starting testing
Risk analysis and the plan must be revised
27
Whom should test mgr work with to coordinate delivery of test objects content and dates of each test release
Development Mgrs
28
Whom should test mgr work with to coordinate delivery of test objects content and dates of each test release
Development Mgrs
29
Whom should test mgr work with to coordinate delivery processes and mechanism , BUILD VERSION
Config Mgmt Release Mgmt Chg Mgmt
30
After developing a custom-tool, what should be done next?
Test the tool
31
Before releasing the tool for other project,
impt to review its purpose, aim, ROI / benefits, possible downsides
32
Risk analysis is done when?
Major milestones of project
33
If serious defects were found in production 3 months after release, what lesson should had been done?
Cross-section of user representatives should participate in the ridk analysis sessions
34
Defects logged against the test conditions but lots of test cases are still not yet executed? What is not done:
test tool is not updated after completion of test case and status do not reflect the report,
35
35. When larger defects in the code module were found after review, what should be done?
Static Analysis Inspections - discovery and removal of defects
36
Requirements passed/failed”, what test type?
Reactive Testing/Exploratory Testing
37
Model-based
Operational profiling
38
37. Lots of testing completion/cycle: (spiral, incremental/iterative, agil, v, waterfall)
Sequential: V-Model
39
defect mngt or committee meet to determine if valid defect, to be fixed ir deferred.
Defect Triage
40
Test then code
STEP REQUIREMENTS-BASED