quality control personnel certification Flashcards

(41 cards)

1
Q

O.C.E.W

A

On center each way

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

ASTM

A

American Society for testing & materials

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

WWF

A

Welded wire fabric

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

K.S.I

A

Kips per square inch

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

PSI

A

Pounds per Square inch

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Invert

A

Bottom of slab

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Rim

A

Top of structure

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Catch

A

catch basin

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Type !/!! cement

A

FDOT approved mix

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Elev

A

Elevation

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

ID

A

inside diameter

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Dia

A

Diameter

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Grate

A

Type of grate

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

WWM

A

Welded wire mesh

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

boot

A

rubber gasket

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

Hole raise

A

verticle distance between the bottom of hole and the top of the floor

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
17
Q

pipe invert

A

elevation in the inside bottom of pipe known as flow line elevation

18
Q

pipe size

A

pipes may have diffewring wall thickness. hole openingmay be larger than the pipe OD plus6 inches

19
Q

hooked ends

A

Sheppard hooks on ends reinforcing steel

20
Q

EOP

A

Edge of pavement

21
Q

TPW

A

Top of poured wall

22
Q

sump

A

the design height defference between the lowest pipe and the floor

23
Q

ITB

A

inside top of base slab aka floor

24
Q

vert

25
horiz
Horizontal
26
Cyds
Cubic Yards
27
Eyebolt & Chain
security Method
28
Chamfer
softened trim piece at 45 degree angle common to catch basin
29
skimmer
a pollution control device that keeps floating debris awy from grate
30
RCP
Reinforced concrete pipe
31
reducer slab
a transition slab used to reduce box dimensions
32
riser
specific length of precast between structure and manhole
33
Bar Abbreviations
EX. #4, #6
34
base wall
Vertical wall off base slab
35
Elevation
Numeric value of a spot on the structure relative to sea level
36
Throat inlet
Curb inlet- receives water from the roadway through an opening in the curb.
37
Flat Top
top slab to close up manhole or deck
38
ring and cover
cast iron frame and cover placed on top of manhole
39
FDOT index 200/201
basics of stucture
40
concrete yardage
measurment of cubic yards
41
slot area
step down in a wall for water to enter a catch basin