Quiz 1 Flashcards

(50 cards)

1
Q

Which of the following post-construction services includes evaluation of initial program versus actual use of facility?

a. Building / ground administration
b. Owner’s association organization
c. Building / equipment maintenance
d. Post-construction evaluation

A

d. Post-construction evaluation

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

An architect has done the renovation / addition of a clinic / residence in Manila. Project construction cost is three million pesos. Using UAP standards, how much does the architect expect to receive as minimum basic fee from his client?

a. 400,000 pesos
b. 150,000 pesos
c. 300,000 pesos
d. 450,000 pesos

A

d. 450,000 pesos

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q
  1. What is generally the basis of the architect’s minimum basic fee?
    a. Owner’s offer
    b. Type of structure
    c. Architect’s professional community standing
    d. Project construction cost
A

d. Project construction cost

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q
  1. In the architect’s post-construction services, under which services does the architect evaluate the initial program versus the actual use of facility.
    a. Building / equipment maintenance
    b. Design-build services
    c. Building grounds administration
    d. Post-construction evaluation
A

d. Post-construction evaluation

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q
  1. Which of the following is NOT included in the Architect’s Code, “May I Always Build”?
    a. Humility
    b. Haste of mind
    c. Patience
    d. Artistry
A

b. Haste of mind

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q
  1. In the architect’s design services, under which phase does preparation of forms for contract letting, invitation / instruction to bidders, and bidders’ proposal fall?
    a. Construction
    b. Design development
    c. Schematic design
    d. Contract documents
A

a. Construction

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q
  1. Under the percentage fee methods, what would be the fee of the architect if he acts as full-time supervisor of a project he designed and which costs 300 million pesos?
    a. 500,000 pesos
    b. 1.5 million pesos
    c. 1 million pesos
    d. 3 million pesos
A

d. 3 million pesos

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q
  1. Which of the following does NOT describe the multiple of direct personnel expenses method of architect’s compensation?
    a. Based on value of creative design
    b. Multiplier depends on project complexity
    c. Applicable to supervision work
    d. Applicable to pre-design services
A

a. Based on value of creative design

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q
  1. In the architect’s specialized allied services, under which services does the architect check / approve samples of planting materials / landscaping elements?
    a. Physical planning
    b. Environmental planning
    c. Landscape design
    d. Interior design
A

c. Landscape design

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q
  1. Which of the following conditions is NOT TRUE in design-build services on guaranteed maximum cost?
    a. Architect’s fee is 10 percent of project construction cost in addition to fee for regular design services
    b. More than 10 percent excess of guaranteed maximum cost paid by architect
    c. Architect’s fee is built-in in guaranteed maximum cost, including fee for regular design services
    d. 10 percent excess of guaranteed maximum cost divided between architect and client
A

c. Architect’s fee is built-in in guaranteed maximum cost, including fee for regular design services

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q
  1. Architect DEF did a high-rise condominium project on a design-build arrangement with a client with guaranteed project cost of 850 million pesos. However, the actual cost exceeded the contract amount by 150 million. Under such situation, which of the following conditions should be observed?
    a. Architect pays 107.5 million of excess amount
    b. Architect and client pays one-half each of excess amount
    c. Client pays 50 million pesos and Architect pays 100 million pesos of excess amount
    d. Architect pays 150 million excess amount
A

a. Architect pays 107.5 million of excess amount

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q
  1. Who is responsible for insurance for liabilities on materials, workmanship, labor, and property?
    a. Architect
    b. Construction manager
    c. Contractor
    d. Owner
A

c. Contractor

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q
  1. Under what condition may owner exercise the right to terminate a contract?
    a. After 10 days’ notice
    b. Bankruptcy insolvency of contractor
    c. After 5 days’ notice
    d. Provide substitute materials
A

b. Bankruptcy insolvency of contractor

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q
  1. Which method of compensation for architect’s services is flexible and any change will not affect owner-architect agreement?
    a. Professional fee plus expenses
    b. Multiple of direct personnel expenses
    c. Per diem plus reimbursable expense
    d. Percentage of construction cost
A

d. Percentage of construction cost

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q
  1. Under the Architect’s Code of Ethics, which of the following is unethical for the Architect to do?
    a. Seeks success through solicited personal publicity
    b. Asks fair remuneration for services rendered
    c. Confines criticisms / praises within constructive / inspirational limits
    d. Holds client’s interest over and above self-interest for financial returns
A

a. Seeks success through solicited personal publicity

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q
  1. In master development plan formulation, which component is concerned with movement of people / goods from one place to another?
    a. Economic
    b. Sociocultural
    c. Physical
    d. Transport
A

d. Transport

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
17
Q

In a typical owner-architect agreement, which of the following is chargeable to the owner?

a. Structural / electrical / sanitary engineering
b. Income taxes on professional fees
c. Miniature models
d. Five sets of contract documents

A

c. Miniature models

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
18
Q
  1. If the architect’s fee is one million pesos, how much is he expected to receive upon completion of the project, assuming that he has been compensated fully for the first three phases of his services?
    a. 300,000 pesos
    b. 100,000 pesos
    c. 150,000 pesos
    d. 200,000 pesos
A

c. 150,000 pesos

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
19
Q
  1. For every day of delay in construction time, contractor is obligated to pay the owner. What do you call this payment?
    a. Performance payment
    b. Retention fee
    c. Liquidated damages
    d. Security
A

c. Liquidated damages

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
20
Q
  1. Under PD 1096, which of the following is NOT a basis for assessment of building permit fees?
    a. Construction cost
    b. Geology of land
    c. Floor area
    d. Building height
A

b. Geology of land

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
21
Q
  1. Under PD 1096, which of the following is NOT a basis for assessment of building permit fee?
    a. Building occupancy / use
    b. Building height
    c. Floor area
    d. Land area
22
Q
  1. In a typical owner-architect agreement, which of the following is NOT part of architect’s professional fees?
    a. Structural / electrical engineering
    b. Special interior design / movable furniture
    c. Income taxes on professional fees
    d. Five sets of plans / contract documents
A

b. Special interior design / movable furniture

23
Q
  1. Under BP 220, what is the difference between underdeveloped area and developed area in terms of circulation system requirements?
    a. Type of pavement
    b. Hierarchy of roads
    c. Location
    d. Width of roads
A

a. Type of pavement

24
Q
  1. What act amended Sec. 34 of RA 545 allowing the use of the terminology “Architects and Engineers” provided that individual members of such firms in partnership are architects and engineers? (No answer)
    a. RA 1281
    b. RA 1581
    c. RA 1275
    d. RA 1181
A

b. RA 1581 (bonus)

25
75. Which of the following is NOT considered in assessment of building permit fees? a. Occupancy / building use b. Land area c. Floor area d. Height
b. Land area
26
76. Which of the following determines the value of extra work or change in construction plans by owner? a. By estimate and acceptance in lump sum b. Value included in contingencies c. By actual direct cost plus 10 percent for profit, overhead, and tax d. By unit prices provided credit does not exceed 10 percent or original contract
c. By actual direct cost plus 10 percent for profit, overhead, and tax
27
77. While the architect is not expected to provide the whole range of comprehensive architectural services, what role does he perform for the client? a. Building administrator b. Agent c. Manager d. Architect
b. Agent
28
78. Which of the following standards / requirements for buildings / structures is / are regulated / controlled by PD 1096? a. Quality of materials b. Use c. Construction d. All listed items
d. All listed items
29
79. Under the architect’s design-build services on a guaranteed maximum cost, which of the following conditions should be observed? a. Architect’s services basically the same as design-build by administration b. All listed items c. Revolving capital provided to architect by client d. Client given a guaranteed maximum cost for project construction
b. All listed items
30
80. An architect has designed a nursing home which is of moderately complex design. Project construction cost is about 20 million pesos. Using UAP standards, how much fee does the architect expect to receive as basic minimum fee from his client? a. 200,000 pesos b. 1.4 million pesos c. 140,000 pesos d. 2.0 million pesos
b. 1.4 million pesos
31
81. Under general conditions, who is generally responsible for payment of permits, taxes, and licenses? a. Architect b. Building supervisor c. Owner d. Contractor
d. Contractor
32
82. Which compensation method for architect’s services usually applies to government projects in a form of contract indicating a certain amount as professional fee? a. Percentage of construction cost b. Multiple of direct personnel expenses c. Lump sum or fixed fee d. Professional fee plus expenses
c. Lump sum or fixed fee
33
83. What legal mandate obligates owners to repair / demolish dangerous or ruinous buildings? (No answer) a. Civil code b. Zoning code c. Housing and Subdivision code d. Philippine Constitution
a. Civil code
34
84. Within what period is the effectivity of a contractor guarantee bond ensuing all materials / workmanship installed are of good quality? a. Three years b. Four years c. Two years d. One year
d. One year
35
85. What legal mandate obligates owners to fell / remove large trees which could cause damage to travelers over a public or private road? a. National building code b. Zoning code c. Housing and Subdivision code d. Civil code
d. Civil code
36
86. Which of the following is / are unethical practice(s) of the architect? a. Misleads the public through advertisements / signs b. Endorses construction materials in paid advertisements c. Solicits advertisement / support for publication of his works d. All listed items
d. All listed items
37
87. Under PD 1096, which of the following constructions are NOT exempt from permit fees? a. Reconstructions of structures damaged / destroyed by typhoons / other calamities for 20 percent of original construction cost b. Government buildings c. Private housing built by National Housing Authority d. Buildings constructed by charitable institutions
d. Buildings constructed by charitable institutions
38
88. With regards to responsibilities to contractor, which of the following is/are expected of the architect? a. Rejects materials not conforming to contract documents b. All listed items c. Refrains from accepting gifts in exchange of favors d. Avoids financial disadvantages for architects errors
b. All listed items
39
89. Under the owner-architect agreement, which of the following include(s) the contract documents phase of architect’s basic services? a. Assistance in securing necessary government approvals b. All listed items c. Preparation of general conditions of project construction d. Preparation of construction drawings / specifications
c. Preparation of general conditions of project construction | d. Preparation of construction drawings / specifications
40
90. The scope of comprehensive architectural services of the architect includes which of the following? a. Pre-design to comprehensive planning b. Design to post-construction c. Design to construction d. Pre-design to post construction evaluation
d. Pre-design to post construction evaluation
41
91. In a typical owner-architect agreement, who is responsible for payment of miniature models? a. Architect b. Project manager c. Contractor d. Owner
d. Owner
42
92. Under PD 1096, what factor based on total customer area should be used to determine the number of parking slots for office buildings? (wrong question) a. 100 b. 150 c. 200 d. 125
d. 125
43
93. What do you call the outline set of specifications enumerating the type / trade names of materials? a. Closed specifications b. Schedule of materials and finishes c. Breakdown of work d. Supplementary specifications
b. Schedule of materials and finishes
44
94. Who is responsible for payment of professional services required by architect – such as normal, structural, electrical, plumbing / sanitary, and mechanical engineering services? a. Architect b. Project manager c. Owner d. Contractor
a. Architect
45
95. In the architect’s range of services, under which services does cost effectiveness study fall? a. Construction b. Design c. Specialized allied d. Pre-design
a. Construction
46
96. In the Architect’s Code of Ethics, to whom does the architect have responsibility to refrain from taking part in paid advertisement endorsing any building material or equipment? a. Public b. Client c. Contractor d. Manufacturers / dealers
a. Public
47
97. Under the owner-contractor agreement, who pays for taxes, licenses, permits, and fees? a. Project manager b. Contractor c. Architect d. Owner
b. Contractor
48
98. Under the architect’s design-build services, which of the following is/are included in design-built by administration? a. Materials / equipment procurement b. All listed items c. Construction personnel hiring d. Schedule of work / bill of materials
b. All listed items
49
99. Under the design-build services by administration, what would be the architect’s fee is the project cost of 700 million pesos? a. 42 million pesos b. 35 million pesos c. 10 million pesos d. 49 million pesos
d. 49 million pesos
50
100. An architect has designed a medical center with a large hospital and medical buildings. Project construction is 78 million pesos. Using UAP standards, how much does the architect expect to receive as minimum basic free from his client? a. 5.00 million pesos b. 5.96 million pesos c. 7.80 million pesos d. 6.24 million pesos
d. 6.24 million pesos