Which of the following post-construction services includes evaluation of initial program versus actual use of facility?
a. Building / ground administration
b. Owner’s association organization
c. Building / equipment maintenance
d. Post-construction evaluation
d. Post-construction evaluation
An architect has done the renovation / addition of a clinic / residence in Manila. Project construction cost is three million pesos. Using UAP standards, how much does the architect expect to receive as minimum basic fee from his client?
a. 400,000 pesos
b. 150,000 pesos
c. 300,000 pesos
d. 450,000 pesos
d. 450,000 pesos
- What is generally the basis of the architect’s minimum basic fee?
a. Owner’s offer
b. Type of structure
c. Architect’s professional community standing
d. Project construction cost
d. Project construction cost
- In the architect’s post-construction services, under which services does the architect evaluate the initial program versus the actual use of facility.
a. Building / equipment maintenance
b. Design-build services
c. Building grounds administration
d. Post-construction evaluation
d. Post-construction evaluation
- Which of the following is NOT included in the Architect’s Code, “May I Always Build”?
a. Humility
b. Haste of mind
c. Patience
d. Artistry
b. Haste of mind
- In the architect’s design services, under which phase does preparation of forms for contract letting, invitation / instruction to bidders, and bidders’ proposal fall?
a. Construction
b. Design development
c. Schematic design
d. Contract documents
a. Construction
- Under the percentage fee methods, what would be the fee of the architect if he acts as full-time supervisor of a project he designed and which costs 300 million pesos?
a. 500,000 pesos
b. 1.5 million pesos
c. 1 million pesos
d. 3 million pesos
d. 3 million pesos
- Which of the following does NOT describe the multiple of direct personnel expenses method of architect’s compensation?
a. Based on value of creative design
b. Multiplier depends on project complexity
c. Applicable to supervision work
d. Applicable to pre-design services
a. Based on value of creative design
- In the architect’s specialized allied services, under which services does the architect check / approve samples of planting materials / landscaping elements?
a. Physical planning
b. Environmental planning
c. Landscape design
d. Interior design
c. Landscape design
- Which of the following conditions is NOT TRUE in design-build services on guaranteed maximum cost?
a. Architect’s fee is 10 percent of project construction cost in addition to fee for regular design services
b. More than 10 percent excess of guaranteed maximum cost paid by architect
c. Architect’s fee is built-in in guaranteed maximum cost, including fee for regular design services
d. 10 percent excess of guaranteed maximum cost divided between architect and client
c. Architect’s fee is built-in in guaranteed maximum cost, including fee for regular design services
- Architect DEF did a high-rise condominium project on a design-build arrangement with a client with guaranteed project cost of 850 million pesos. However, the actual cost exceeded the contract amount by 150 million. Under such situation, which of the following conditions should be observed?
a. Architect pays 107.5 million of excess amount
b. Architect and client pays one-half each of excess amount
c. Client pays 50 million pesos and Architect pays 100 million pesos of excess amount
d. Architect pays 150 million excess amount
a. Architect pays 107.5 million of excess amount
- Who is responsible for insurance for liabilities on materials, workmanship, labor, and property?
a. Architect
b. Construction manager
c. Contractor
d. Owner
c. Contractor
- Under what condition may owner exercise the right to terminate a contract?
a. After 10 days’ notice
b. Bankruptcy insolvency of contractor
c. After 5 days’ notice
d. Provide substitute materials
b. Bankruptcy insolvency of contractor
- Which method of compensation for architect’s services is flexible and any change will not affect owner-architect agreement?
a. Professional fee plus expenses
b. Multiple of direct personnel expenses
c. Per diem plus reimbursable expense
d. Percentage of construction cost
d. Percentage of construction cost
- Under the Architect’s Code of Ethics, which of the following is unethical for the Architect to do?
a. Seeks success through solicited personal publicity
b. Asks fair remuneration for services rendered
c. Confines criticisms / praises within constructive / inspirational limits
d. Holds client’s interest over and above self-interest for financial returns
a. Seeks success through solicited personal publicity
- In master development plan formulation, which component is concerned with movement of people / goods from one place to another?
a. Economic
b. Sociocultural
c. Physical
d. Transport
d. Transport
In a typical owner-architect agreement, which of the following is chargeable to the owner?
a. Structural / electrical / sanitary engineering
b. Income taxes on professional fees
c. Miniature models
d. Five sets of contract documents
c. Miniature models
- If the architect’s fee is one million pesos, how much is he expected to receive upon completion of the project, assuming that he has been compensated fully for the first three phases of his services?
a. 300,000 pesos
b. 100,000 pesos
c. 150,000 pesos
d. 200,000 pesos
c. 150,000 pesos
- For every day of delay in construction time, contractor is obligated to pay the owner. What do you call this payment?
a. Performance payment
b. Retention fee
c. Liquidated damages
d. Security
c. Liquidated damages
- Under PD 1096, which of the following is NOT a basis for assessment of building permit fees?
a. Construction cost
b. Geology of land
c. Floor area
d. Building height
b. Geology of land
- Under PD 1096, which of the following is NOT a basis for assessment of building permit fee?
a. Building occupancy / use
b. Building height
c. Floor area
d. Land area
d. Land area
- In a typical owner-architect agreement, which of the following is NOT part of architect’s professional fees?
a. Structural / electrical engineering
b. Special interior design / movable furniture
c. Income taxes on professional fees
d. Five sets of plans / contract documents
b. Special interior design / movable furniture
- Under BP 220, what is the difference between underdeveloped area and developed area in terms of circulation system requirements?
a. Type of pavement
b. Hierarchy of roads
c. Location
d. Width of roads
a. Type of pavement
- What act amended Sec. 34 of RA 545 allowing the use of the terminology “Architects and Engineers” provided that individual members of such firms in partnership are architects and engineers? (No answer)
a. RA 1281
b. RA 1581
c. RA 1275
d. RA 1181
b. RA 1581 (bonus)