Quiz No. 1 Flashcards

1
Q

Contract agreement where clients agree to pay the cost of labor and materials. “PLUS”

A

Cost Plus Contract

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Compensation is based on the engineering performance according to an agreed target budget.

A

Incentive Contract

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Work meets the required quality standards and for providing regular progress updates to client

A

Quality Control and Inspection

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

What are the common types of contracts?

A

Lump Sum Contract
Unit Price Contact
Incentive Contract
Cost Plus Contract
Percentage of Construction Fee Contract

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Electric Power Industry Reform Act, aka R.A 9163 was passed in ________ under the administration of President ___________________.

A

June 8, 2001 ; Gloria M. Arroyo

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Under section 5, what are the four sectors of an organization?

A

Generation
Transmission
Distribution
Supply Sector

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

_______________ company in the PH which operates and maintains the High-Voltage Transmission Network.

A

TRANSCO or National Transmission Corporation

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

NPC stands for__________.

A

National Power Corporation

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Responsible for privatization of NPC generation of assets, real estate.

A

Power Sector Assets and Liabilities Management Corporation

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Practice of charging higher prices to artificially lower prices for another group

A

Cross Subsidization

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

PSALM Corp is responsible ___________ of NPC stranded contract costs.

A

Liquidation

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Mandated Rate Reduction ( EPIRA Section 72, how much discount given by NPC?

A

30 centavos/kWhr or 0.30 pesos/kWhr

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Congressional commission w/c DOE submits their semi-annual report.

A

Power Commission

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

Difference of PH Electrical Code 1 and 2

A

PEC 1 - Elec’l Installation Inside Building
PEC 2 - Elec’l Installation Outside Building

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

_______&_________ are req’d before undertaking Elec’l Installation and after which the certificate of electrical installation is issued by the authority

A

Permit, inspection

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

Two types of Service Entrances

A

Overhead
Underground

17
Q

Part of Electrical Plan that’s required in order to show the statement and specifications of an Electrical plan

A

General Notes/Specifications

18
Q

Part of Electrical Plan that consists of Schematic Diagram of the Service Entrance, feeders, and Branch Ckt.

A

Riser Diagram

19
Q

Electrical connection w/c may either intentional or accidental between an electrical clt or equipment and the earth

20
Q

Overcurrent protective device designed to function as switch. Equipped with automatic tripping device to protect the branch ckt from overload and ground fault.

A

Circuit breaker

21
Q

A common household outlet is an example of what receptacle?

A

Convenience receptacle/ outlet

22
Q

Difference of insulator and conductor

A

Insulator has big resistance so it resists current flow.

Conductor has lesser resistance which makes the current easier to flow

23
Q

Current -carrying capacity of an electric conductor.

24
Q

New Electrical Engineering Law- An act providing for a more responsive and comprehensive. Regulation for the Practice, Licensing, and Registration of Electrical Engineers and Electricians.

A

R.A. no 7920