Responsibilities Flashcards

1
Q

Overall responsibility for complying with API 570 4.1

A

O

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Responsible for developing &implementing a QA insp/repair mgmt system 4.3.1.1

A

O

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Responsible for implementing an effective MOC process 4.3.1.2

A

O

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Responsible for QC during repairs or alterations 4.3.3

A

Repair Organization

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Assure owner - testing, inspection & examination activities meet Code 4.3.4

A

I

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Evaluate and accept NDE examination results 4.3.4

A

I

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Maintain certification records of NDE examiners 4.3.5.3

A

Exam Employer

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Develop an inspection plan for a piping system 5.1.1.1

A

And / Or I E

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Also involved in making inspection plans for pipe that operates >750 oF 5.1.1.1

A

CS

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Choose to conduct RBI assessments 5.2

A

0

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Get familiar with prior inspection data & repairs prior to inspections 5.3.5

A

I

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Get familiar w/ operating conditions & potential damage mech of pipe system 5.4.1.2

A

I

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Perform On-stream inspections 5.5.2

A

Or I Tech

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

Perform Thickness Inspection 5.5.3

A

Or I Tech

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

Assure individuals taking thickness measurements are trained and qualified 5.5.3

A

O

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

Determine cause if short-term corrosion rate varies significantly 5.5.3

A

And I CS

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
17
Q

Perform External Inspection 5.5.4

A

Or I Qualified Other

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
18
Q

Involved if the # of CML’s will be significantly reduced or eliminated 5.6.2

A

CS

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
19
Q

Select or adjust the # of CMLs 5.6.3

A

I

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
20
Q

Select CMLs for pipe systems subject to localized corrosion or cracking 5.6.3

A

CS

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
21
Q

Determine need for non-thickness NDE techniques. Inspector consults w/: 5.7.2

A

Or E CS

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
22
Q

Determine surface prep for NDE exam. Inspector made need to consult with: 5.7.3

A

GURU

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
23
Q

Perform UT flaw detection for finding linear flaws 5.7.4

A

QUTE

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
24
Q

Determine pressure for leak tests (non-code tests) 5.8

A

O

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
25
Prior to hydrotest determine if structure will support weight 5.8
E
26
Determine risk of brittle fracture prior to performing a pressure test 5.8.3
E
27
Approve substituting NDE for a pressure test 5.8.5
And I E
28
Perform UT as a substitute for a pressure test 5.8.5
QUTE
29
Verify that new alloy material during repairs & alteration meet specifications 5.9
I
30
When verifying new materials, determine the sampling percentage 5.9
O
31
PMI new materials during repairs & alterations 5.9
Or I Tech
32
If incorrect mat’l found in existing pipe, determine amount of further verification 5.9
I
33
Determine if PMI program is needed for existing facilities 5.9
O
34
Determine date to replace incorrect mat’ls found during PMI survey 5.9
And I O CS
35
Periodically inspect components found during PMI survey that are wrong mat’ls 5.9
I
36
Determine if crack-like weld flaws are the result of original weld fabrication 5.11
I
37
Assess crack-like flaws and environmental cracking 5.11
Or E CS
38
Assess preferential weld corrosion 5.11
I
39
Perform audit of owner/users to assure compliance with 570 5.13
Competent
40
Make corrections based on the audit of owner/users piping program 5.13
Owner’s AIA
41
Review and approve RBI assessments 6.3.2
And I E
42
Determine the inspection intervals 6.3.3
Or I O
43
Maintain a record of process fluid classification 6.3.4.1
O
44
PRD’s tested and repaired 6.7.1
Exp. Repair Org
45
Determine the inspection intervals for PRDs 6.7.3.1
Or I E Qualified Other
46
Select corrosion rate that best reflects conditions 7.1.1
And I CS
47
Maintain piping records 7.6.1
O
48
Review and approval an interval deferral 7.10
I
49
Revise an existing interval and document basis for change 7.10
I
50
Revise an existing interval that has unusual degradation issues. Inspector and: 7.10
Or E CS
51
Perform piping repairs 8.1.2
Repair Org
52
Authorize all repairs 8.1.2
I
53
Authorize all alterations 8.1.2
And I E
54
Designate hold points for repairs and alterations 8.1.2
I
55
Provide general authorization for limited or routine repairs 8.1.2
I
56
Approve all proposed methods of design, materials, WPSs, NDE & testing 8.1.3
Or I E
57
Approve use of on-stream welding 8.1.3
O
58
Approve repair welding of cracks 8.1.3
E
59
Approve all repair and alteration work at hold points 8.1.3
I
60
Approve all repair and alteration work at completion of work 8.1.3
I
61
Design temporary repairs 8.1.4.1
E
62
Determine longitudinal cracks won’t grow beyond a FW patch 8.1.4.1
E
63
Approve using lap patches with a material different than the pipe 8.1.4.1
E
64
Determine that wall thickness is adequate for on-stream welding 8.1.4.1
I
65
Allow temporary welded repairs to remain in place past “next opportunity” 8.1.4.1
E
66
Allow temp leak sealing devices to remain in place past “next opportunity” 8.1.5
E
67
Review leak sealing procedures 8.1.5
Or I E
68
Maintain record of qualified WPS’s and WPQ’s 8.2.2
Repair Org
69
Allow exceptions to required preheat temperature for temporary repairs 8.2.3.2
E
70
Check preheat temperature when using Preheat in lieu of PWHT 8.2.3.2
I
71
Review the use of Preheat in lieu of PWHT 8.2.3.2
E
72
Exceptions to PWHT on temporary repairs 8.2.3.3
E
73
Review the use of a local PWHT in lieu of a full encirclement PWHT 8.2.3.3
E
74
Determine whether a pressure test is needed after repairs 8.2.7
I
75
Approve substituting NDE in lieu of a pressure test 8.2.7
And I E
76
Perform rerating calcs 8.3
Or I E