Responsibility Flashcards

Who is Responsible for what

1
Q

Overall responsibility for complying with API 510 (4.1)

A

Owner / User

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

During repairs and alterations who is responsible for Quality Control (4.3)

A

Repair Organization

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Assure owner that inspection, NDE, repairs, and pressure testing activities meet code (4.4)

A

Inspector

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Evaluate and accept NDE results (4.4)

A

Inspector

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Develop the inspection plan for vessels and pressure relief devices. (5.1.2.1)

A

Inspector or Engineer

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Designate potential damage mechanisms and where they may occur (5.1.2.1)

A

Corrosion Specialist

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Chooses to conduct RBI assessment (5.2.1)

A

Owner / User

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Review prior vessel history prior to inspections (5.3.5)

A

Inspector

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Familiar with conditions, causes, and characteristics of potential damage mechanisms (5.4.2)

A

Inspector

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Perform Internal Inspection (5.5.2.1)

A

Inspector

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Determine whether it’s necessary to remove deposits or lining (5.5.2.3)

A

Inspector and Corrosion Specialist

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Perform On-Stream Inspection (5.5.3.1)

A

Inspector or Examiner

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Approve On-Stream inspection work performed by Examiners (5.5.3.1)

A

Inspector

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

Perform External Inspection (5.5.4.1.1)

A

Inspector or Qualified Others

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

Take thickness measurements (5.5.5.1)

A

Inspector or Examiner

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

Review thickness data to look for anomalies and if short-term corrosion rate changes significantly (5.5.5.3)

A

Inspector and Corrosion Specialist

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
17
Q

Assure those taking thickness measurements are trained and qualified (5.5.5.4)

A

Owner / User

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
18
Q

Determine locations of CML’s for vessels with localized corrosion (5.6.3.1)

A

Corrosion Specialist

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
19
Q

Involve if the # of CML’s will be significantly reduced or eliminated (5.6.3.2)

A

Corrosion Specialist

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
20
Q

Define the type of damage, the NDE technique, and extent of examination (5.7.1.1)

A

Inspector and Engineer or Corrosion Specialist

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
21
Q

Perform UT flaw detection for finding linear flaws (5.7.1.3)

A

Industry-Qualified UT Angle Beam Examiners

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
22
Q

After a repair a pressure test shall be applied if _______ believes that one is necessary and specifies it in the repair plan (5.8.2.1)

A

Inspector

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
23
Q

Review use of a component pressure test in lieu of complete vessel hydro (5.8.2.2)

A

Engineer

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
24
Q

Determine the test pressure for non-code related pressure tests (5.8.3.2)

A

Owner / User

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
25
Hydro static pressure test of 300 series stainless steel, verify water quality and the vessel is drained and dried (5.8.5.2)
Inspector
26
Approved substituting NDE for a pressure test (5.8.8.1)
Inspector and Engineer
27
Verify new materials are consistent with those specified (5.9.1)
Inspector
28
When verifying new materials, determine the sampling percentage (5.9.1)
Inspector or Owner / User
29
PMI new materials during repairs and alterations (5.9.1)
Inspector or Examiner
30
If incorrect material found in existing vessel, determine amount of verification (5.9.2)
Inspector
31
Asses crack-like flaws attributed to environmental cracking (5.10.3)
Engineer or Corrosion Specialist
32
Assess preferential corrosion in welds (5.10.3)
Inspector
33
Inspect new vessels at time of installation (6.2.1.1)
Inspector
34
Review and approve RBI assessments that extend intervals beyond 10 years (6.3.2)
Inspector and Engineer
35
Determine the External and Internal inspection interval (6.4.1 & 6.5.1.1)
Inspector or Engineer
36
Approve the use of On-Stream inspection in lieu of Internal (6.5.2.1)
Inspector
37
Determine the pressure relief device interval (6.6.3.1)
Inspector or Engineer or Qualified Others (PTV-Tech)
38
Inspector recommendations can be changed or deleted after review (6.9)
Engineer or Inspection Supervision
39
Select which corrosion rate (Short v.s Long) reflects the current condition (7.1.1.2)
Inspector and Corrosion Specialist
40
Maintain vessel and relief device records (7.8.1)
Owner / User
41
Authorize all vessel repairs (8.1.2)
Inspector
42
Authorize all repairs to Div. 1 & 2 (8.1.2)
Inspector and Engineer
43
Authorize all alterations (8.1.2)
Inspector and Engineer
44
Designate hold point [Fabrication Approvals] (8.1.2)
Inspector
45
Repairs - Approve all methods of design, materials, WPS's, NDE, and testing (8.1.3.1)
Inspector or Engineer
46
Alterations - Approve all methods of design, materials, WPS's, NDE, and testing (8.1.3.1)
Inspector and Engineer
47
Approve all repair and alteration work at hold points (8.1.3.2)
Inspector
48
Approve all repair and alteration work at completion of work (8.1.3.2)
Inspector
49
Approve all nozzle instillations (8.1.4)
Engineer
50
Allow temporary weld repairs to remain in place past ''Next Opportunity'' (8.1.6.1.1)
Inspector and Engineer
51
Determine that a crack will not propagate from under a fillet weld patch (8.1.6.1.2.1)
Engineer
52
Approve the use of fillet-welded patch repairs (8.1.6.1.2.1)
Inspector and Engineer
53
Approve use of lap band repair (8.1.6.1.3.a)
Inspector and Engineer
54
Authorize the repair welding of cracks at stress concentrations (8.1.6.2.1)
Engineer
55
Review the repair procedures for stainless steel cladding (8.1.6.4.1)
Inspector and Engineer
56
Monitor the repairs made to stainless steel cladding (8.1.6.4.3)
Inspector
57
Allow exceptions to preheat temperatures (8.1.7.3)
Engineer
58
Maintain record of qualified WPS's and WPQ's (8.1.7.2.2)
Repair Organization
59
Monitor preheat temperatures (8.1.7.3)
Inspector
60
Review the use of a local PWHT in lieu of a full encirclement PWHT (8.1.7.4.2.a)
Engineer
61
Review the use of preheat in lieu of PWHT (8.1.7.4.3.1.2)
Engineer
62
Review the use of controlled deposit welding in lieu of PWHT (8.7.1.4.3.1.2)
Engineer
63
Approve use of alternate NDE methods after repairs and alterations (8.1.8.3)
Inspector and Engineer
64
Perform calculations for rerate (8.2.1.a)
Engineer or Manufacture
65
Oversee the attachment of a name plate after rerating was performed (8.2.2)
Inspector
66
An On-Stream inspection may be substituted for the internal inspection provided this substitution is approved by _________?
Inspector Only!
67
Companies that use API 510 must?
Either employ or have access to an authorized inspection agency
68
During vessel repairs or alterations, who is required to maintain welding records?
Repair Organization
69
``` A vessel service has changed. Inspector must obtain probable corrosion rate for new operation. Which of the following is preferred way to establish the corrosion rate for the new service? A - Similar Service B - Owner Experience C - published data D - inspect after 1000 hours ```
A - Similar service