What is a stack or vent terminal?
The outlet of a pipe which equalizes the atmospheric pressure within the plumbing system
Why do we install roof flashing?
To prevent water from leaking into the building
What is flashing?
A piece of sheet material, which is secured to both the pipe and the roof in such a way as to deflect any water flowing onto it
Name three OBC permissible materials for roof flashing
Copper sheet aluminum sheet lead sheet
In the case of a shingled pitched roof, the flashing must be located where
Under the shingles on the upper side and on top of the shingles on the downward side
What is used to secure the flashing to the roof under the shingles?
Roofing nails
If the vent terminal extends a distance of ____ meters above the roof level, _____ must be installed to secure the terminal against high winds
2 meters
Tie down wires
What is the size minimum size for a shingle roof flashing?
500 mm x 500 mm
What are the ways to protect against frost
The OBC code recommends that the vent terminal be increased by one pipe diameter above 150 mm or by insulating the pipe
Also a heat tracing cable can be installed
The vent terminal shall be installed higher than the top level of the snow
Roof flashing is installed to ____ water from_____ into the building
Prevent
Leaking
The flashing used must be approved by the
OBC
The minimum height of any stack terminal is
6 inches high
The flashing is to be installed by the
Plumbing contractor, but really roofer
The installation of a flashing must not_______ the stack terminal in anyway
Obstruct
If the roof is flat, the flashing should be______ layers of roofing material, which will then _____ to the flashing
Between
Seal
If the vent terminal extends a distance of 2 m above roof level _______ must be installed to secure the vent terminal against
Tie down wires
High winds
If the stack and vent is installed during temperatures of 80°F, the dome should be compressed approximately ______ before waterproofing joint is completed to the pipe in order to allow for movement
1/2”