ROUTE KNOWLEDGE - BURNLEY Flashcards

(76 cards)

1
Q

What Safeworking System is the Glen Waverley Line?

A

ABS Double Line

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What is the speed between Burnley and Kooyong?

A

65km

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

What is the speed when going through the Tramway Crossing at Kooyong?

A

30km

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

What is the speed between Kooyong and East Malvern?

A

80km

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

What is the speed between East Malvern and Glen Waverley?

A

95km

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

What are the Terminating locations on the Glen Waverley line?

A
  • Burnley
  • Darling
  • Glen Waverley
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

What are the Stabling locations on the Glen Waverley line?

A
  • Burnley A Siding
  • Burnley Sidings
  • Glen Waverley
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Who are the Controlling Signallers on the Glen Waverley line?

A
  • Burnley SCP (Burnley and Darling)
  • Kooyong
  • Glen Waverley
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Where can drivers manually operate the points on the Glen Waverley line?

A

Darling

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

What Signal Boxes are Unrecorded on the Glen Waverley line?

A
  • Kooyong (Handed Caution Orders)
  • Glen Waverley (Handed Caution Orders)
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

What infrastructure is after Kooyong?

A

A Viaduct controlled by Home Signals (Burnley SCP)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

What is the Safeworking System and Speed for “Y” Track?

A
  • ABS
  • 55km
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

What is the Safeworking System and Speed for “X” Track?

A
  • ATC
  • 65km
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

What is the Safeworking System and Speed between Riversdale and Ashburton?

A
  • ABS Double Line
  • 65km
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

What is the Safeworking System and Speed between Ashburton and Alamein?

A
  • Station Limits of Ashburton
  • 40km
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

What are the Stabling locations on the Alamein Line?

A
  • Ashburton
  • Burnley A Siding
  • Camberwell
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
17
Q

What are the Terminating locations on the Alamein Line?

A
  • Burnley
  • Camberwell
  • Riversdale (DOWN)
  • Ashburton
  • Alamein
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
18
Q

What are the 4 Controlling Signallers on the Alamein Line?

A
  • Burnley SCP
  • Camberwell Signal Box
  • Riversdale Signal Box
  • Ashburton Signal Box
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
19
Q

What Signal Boxes on the Alamein Line are Unrecorded?

A
  • Riversdale (Handed Caution Orders)
  • Ashburton (Handed Caution Orders)
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
20
Q

Where can drivers operate the points manually on the Alamein Line?

A

Ashburton

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
21
Q

If Home Signals are defective at Ashburton, what Authority is need to pass it?

A
  • Switched In = Handed Signallers Caution Order
  • Switched Out = Verbal instructions from Train Control
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
22
Q

What is the speed when going through the Tramway Crossing at Riversdale?

A

30km

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
23
Q

What are the terminating locations on the Belgrave line?

A
  • Burnley
  • Camberwell
  • East Camberwell (DOWN)
  • Chatham (UP)
  • Union
  • Box Hill
  • Blackburn (DOWN)
  • Ringwood
  • Bayswater
  • Ferntree Gully
  • Upper Ferntree Gully
  • Upwey
  • Belgrave
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
24
Q

What are the terminating locations on the Lilydale line?

A
  • Burnley
  • Camberwell
  • East Camberwell (DOWN)
  • Chatham (UP)
  • Union
  • Box Hill
  • Blackburn (DOWN)
  • Ringwood
  • Mooroolbark
  • Lilydale
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
25
What are the stabling locations on the Lilydale line?
- Burnley A Siding - Camberwell - Ringwood - Lilydale
26
What are the stabling locations on the Belgrave line?
- Burnley A Siding - Camberwell - Ringwood - Bayswater - Upper Ferntree Gully - Belgrave
27
How are Caution Orders given at Upper Ferntree Gully?
Handed (Local and Unrecorded)
28
How are Caution Orders given at Ferntree Gully, Upwey and Belgrave?
Dictated or Handed (Remote and Unrecorded)
29
Where can driver be asked to operate the points?
- At unattended ATC crossing loops (Mooroolbark, Lilydale, Ferntree Gully, Upwey and Belgrave) - On ABS at Metro Freight Bypass, Darling and Ashburton
30
How can you Terminate at Burnley on the down?
1. Arrive platform 3 or 4 and detrain passengers 2. Shunt to Burnley Sidings (with GW route indicator) 3. Redock to Platform 1 Or if sidings are full 1. Arrive platform 3 or 4 2. Change ends, push with Competent Worker past 337 3. Drive to platform 2
31
What is the speed between FSS and Swanston Street Bridge?
25km
32
What is the speed between Swanston Street Bridge and Federation Square?
40km
33
What is the speed between Federation Square and Richmond?
65km
34
What is the speed between Richmond and Burnley?
55km
35
What is the speed between Burnley and Hawthorn on the Outer ABS Tracks?
55km
36
What is the speed between Hawthorn and Box Hill on the Outer ABS Tracks?
65km
37
What is the speed between Burnley and Camberwell on the ATC Track?
70km
38
What is the speed between Camberwell and Box Hill on the Bi-ABS Track?
80km
39
What is the speed between Box Hill and Blackburn?
65km
40
What is the speed between Blackburn and Lilydale?
80km
41
What is the speed between Blackburn and Belgrave?
80km
42
What is the Safeworking System between FSS and Burnley?
ABS Double Line
43
What is the Safeworking System between Burnley and Camberwell?
- ABS Double Line - ATC (Centre Track)
44
What is the Safeworking System between Camberwell and Box Hill?
- ABS Double Line - Bi-directional ABS (Centre Track)
45
What is the Safeworking System between Box Hill and Mooroolbark?
ABS Double Line
46
What is the Safeworking System between Box Hill and Ferntree Gully?
ABS Double Line
47
What is the Safeworking System between Mooroolbark and Lilydale?
ATC
48
What is the Safeworking System between Ferntree Gully and Belgrave?
ATC
49
What locations does Burnley Signal Control Panel Control after Burnley Station?
- Burnley - Darling - Burnley A Siding - Burnley Sidings
50
What locations does Camberwell Signal Box control?
- Camberwell - East Camberwell
51
What locations does Box Hill at Camberwell Signal Box control?
- Box Hill - Union - Chatham
52
What locations does Ringwood Signal Box control?
- Ringwood - Blackburn - Bayswater
53
What locations does Lilydale at Ringwood Signal Box control?
- Lilydale - Mooroolbark
54
What locations does Upper Ferntree Gully Signal Box control?
- Upper Ferntree Gully - Ferntree Gully - Upwey - Belgrave
55
Which Signal Boxes are Unrecorded on the Burnley Group lines?
- Upper Ferntree Gully - Riversdale - Ashburton - Kooyong - Glen Waverley
56
What Authority do you need to Setback between Burnley and East Richmond?
Verbal Authority from the Burnley Signal Control panel, Supervised by the Senior Network Controller
57
What Authority is needed to pass Dwarf Signal CAM336 at Camberwell if it is defective?
- Verbal Instructions (Down ABS Line) - Signallers Caution Order (Bi-directional ABS Line) - ATC Systems Caution Order (ATC Line)(X Track to Alamein)
58
What is the Safeworking System and Speed for “Y” Track?
- ABS - 55km
59
What is the Safeworking System and Speed for “X” Track?
- ATC - 65 km
60
If Signal UNN351 is defective, what Authority is need to pass it?
Signallers Caution Order because it’s Bi-ABS (Requires Box Hill at Camberwell Signal Box and Camberwell Signal box to talk to each other)
61
If Signal LIL336 is defective, what Authority is need to pass it?
Verbal instructions from Controlling Signaller (It is the Home Signal before the Home Arrival Signal at Lilydale)
62
If Home Signals are defective at Ashburton, what Authority is need to pass it?
- Switched In = Handed Signallers Caution Order - Switched Out = Verbal instructions from Train Control
63
From which direction can you Terminate at East Camberwell?
DOWN direction
64
From which direction can you Terminate at Chatham?
UP direction
65
From which direction can you Terminate at Blackburn?
DOWN direction
66
What Route Indicators are at Burnley?
- GW (Glen Waverley) - BH (Box Hill)
67
What Route Indicators are at Camberwell?
- AL (Alamein) - BH (Box Hill)
68
What Route Indicators are at Camberwell Sidings?
B, C, D and E
69
What Route Indicators are at Blackburn?
Right and Left illuminated Arrows (For different platforms and high speed points) (To terminate at Blackburn you need at right arrow to platform 2)
70
What Route Indicators are at Ringwood?
- C (Croydon) - B (Bayswater)
71
What Route Indicators are at Bayswater?
- Y (Yard) - D (Down)
72
What Route Indicators are at Lilydale Platform 2?
- S (Sidings) - U (Unwired)
73
What is the speed when approaching the platforms at Ringwood?
30km
74
What is the speed when approaching the platforms at Lilydale?
50km
75
Where can Drivers operate the points on ABS?
- Metro Freight Bypass - Darling - Ashburton
76
Where can B, C, D, and E Sidings at Camberwell be accessed from?
Can only be accessed on the UP (East end) (Dwarf Signal with Illuminated Letter Route Indicators governs entry)