SCHEDULED INSPECTIONS Flashcards
(6 cards)
WHAT IS REQUIRED FOR SCHEDULED INSPECTION REBASE? (ADB)
MAF IDENTIFIED WITH WORD “REBASE” IN DISCREPANCY/SYSTEM REASON BLOCKS.
MAF INCLUDES NEXT INSPECTION DUE DATE/TIME.
WHAT IS THE EOC CODE FOR REBASED INSPECTION AND WHY?
Z
NON-MISSION CAPABLE UNTIL INSPECTION IS COMPLETE.
IF A/C IS DEPLOYING WHAT SHOULD BE BRIEFED TO AIRCREW IN REGARDS TO SCHEDULED INSPECTIONS?
ANY INSPECTIONS COMING UP DURING THEIR DEPLOYMENT.
ENSURE ANY NEED OF HAZMAT, SE AND IMRL HAS BEEN IDENTIFIED/DISCUSSED/GATHERED.
SCHEDULED INSPECTIONS (ADB VER)
VERIFY IF ANY ARE IN THE WINDOW / OVERDU
WHAT ARE DEVIATION LIMITS FOR SCHEDULED INSPECTIONS?
PHASE/HOURLY: + / - 10%
SPECIAL: + / - 3 DAYS
STRUCTURAL LIFE LIMITED COMP: 10% IAW PMIC (EXCEPT RETIRE ITEMS)
WHAT IS REQUIRED FOR SCHEDULED INSPECTION REBASE? (ADB)
MAF IDENTIFIED WITH WORD “REBASE” IN DISCREPANCY/SYSTEM REASON BLOCKS.
MAF INCLUDES NEXT INSPECTION DUE DATE/TIME.