Section 3 Flashcards

1
Q

What does SOC stand for?

A

System operation center

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

The SOC is responsible for directing all switching on the transmission system

A

True 

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

The SOC is responsible for keeping records of transmission switching

A

True

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

The SOC is responsible for coordinating the scheduling of transmission switching 

A

True

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

The manager of transmission system operations is not responsible for the approval of all submitted request for the clearance forms

A

False

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

The manager of TSO trains, the operators on changes to the procedures that will be performed

A

True

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

What does DDC stand for?

A

Distribution dispatch center

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

The appropriate DDC is not responsible for any of the switching on the distribution system

A

False

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

The DDC shall notify the SOC if the switching on the distribution system might affect the transmission system

A

True

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

The DDC is responsible for keeping records of the distribution and transmission switching performed by them

A

True

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

All pre-arranged distribution outage request shall be made and coordinated through the appropriate DDC or local dispatcher

A

True

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Define request for distribution clearance forms are approved by the what manager

A

DDC

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

The what provides the training for any changes in the distribution switching procedures

A

DDC manager

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

Who the who is the person in whose name the clearances placed?

A

Held for

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

The who is the qualified person involved in the physical switching

A

Switch person

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

Who is accountable for the pre-coordination of the project and has overall responsibility for the project

A

Responsible person

17
Q

Which of the following is an example of a responsible person?

A

Project managers, substation, electricians and journeyman lineman

18
Q

It is not necessary for everybody involved in switching sequences to review the switching orders

A

False

19
Q

Changes from the written procedures should be kept to a minimum to avoid switching errors

A

True

20
Q

In a emergency situation switching is allowed without a pre-arrange switching sequence

A

True

21
Q

The telephone should be used when communicating switching orders

A

False

22
Q

All order should be repeated by the receiver to be sure the message is clear

A

True

23
Q

It is not necessary to notify anybody when remotely operating a device

A

False

24
Q

Hold cards should be easily removed from the device that you don’t want operated

A

False

25
Q

It is OK to work on equipment, even if you cannot see a visible opening

A

False

26
Q

A hold card is a physical card, placed for a visually open device to provide clearance for personnel

A

True

27
Q

A caution card is a physical card placed for a device indicating information instruction, or non-clearance warnings

A

True

28
Q

During hotline work, caution cards shall be used to let the lineman know it is OK to energize at any time

A

False

29
Q

The information tag is for the distribution dispatcher

A

True

30
Q

The inhibit tag is for SCADA Controlled devices

A

True