SET 2 FOCUS Flashcards

(57 cards)

1
Q

T/F

A building permit issued under the
provisions of the Code shall expire and
become null and void if the building or
work authorized therein is not
commenced within a period of 120 days
after the issuance of the building permit.

A

FALSE (Originally its
1 year, 120 days is for
special)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

The administration and enforcement of
the provisions of the NBC( also known as
the ‘Code’) and its IRR, including the
imposition of penalties for administrative
violations thereof, is vested upon?

A

Secretary of DPWH

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

A kind of public open space that must be
absolutely free of all forms of
physical obstructions that can negatively
affect natural light and ventilation within
such space or that can impede access to
or the full recreational use of such space
by the general public.

A

Easement

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Signage or Antenna of Telecom tower
shall be permitted to construct on the
roof as it comply with the duly approved
by city / municipal zoning ordinances.

A

TRUE

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

ATO required unobstructed airspace in
any construction of buildings with the ___
radius with non or turbo jet aircraft
operate.

A

24km

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

T/F

Residential 4 Townhouse is allowed to
established up to 3 storey high

A

TRUE

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Which one does not conform with the
code in terms of Location on Property

A

Buildings can be
constructed without
a yard

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

A paint defect which results to bubbles
due to localized loss of adhesion and
lifting of the paint film from the
underlying surface and may be due to
moisture seeping into the walls.

A

Blistering

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

A 0.2 × 0.4 meter beam has a clear span of
6 meters resting on 0.3 x 0.3 meter
columns. If the beam has 2 pieces
continuous bars for the top and bottom
each and 1 extra bar on the tension
portions of the beam, how many 6-meter
long steel bars are needed to reinforce
the beam?

A

8 pieces

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

What measurement varies and needs to
be considered in the computation for the
volume of grout/mortar filler.

A

Thickness of CHB

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

A layer of gravel placed on undisturbed
soil to prevent the capillarity rise of
moisture to a ground slab.

A

Base Course

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Parking requirements for public market

A

one (1) car slot for
every 30 sqm of
customer area

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

_________ stands for an innovative,
sustainable building concept, which is
directly intended for architects, property
developers and project developers. In
addition, it is also a licence system for
precast concrete element manufacturers.

A

Green Code

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

Firewall for R1 and Medium Density Residential

A

MAXIMUM OF 80% OF
THE TOTAL LENGTH
OF A SIDE PROPERTY
LINE; provided that
ONLY ONE (1) SIDE
PROPERTY LINE IS
USED FOR A
FIREWALL in the case
of a R-2 structure

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

PWD Act, Magna Carta for Disabled
Persons

A

Republic Act No.
7277

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

An Act Expanding the Positions Reserved
for Persons with Disability

A

Republic Act No.
10524

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
17
Q

PWD seats domestic airplane

A

2 seats

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
18
Q

PWD seats LRT

A
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
19
Q

A window above a door for additional
light

A

Clerestory

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
20
Q

T/F: Should you attach the extinguisher
even if everything else is already
installed?

A

TRUE

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
21
Q

No person shall be appointed as a
Building Official unless he possesses the
following qualifications:

A

A Filipino citizen
and of good moral
character.

A duly registered
architect or civil
engineer.

A member of good
standing of a duly
accredited
organization of his
profession for not
less than two years.

Has at least five
years of diversified
and professional
experience in
building design and
construction.

All of the choices

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
22
Q

Length of an automobile parking slot for
perpendicular parking (2.50m X ______).

A

5.00 meters

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
23
Q

Length of an automobile parking slot for
diagonal parking (2.50m X ______).

24
Q

A jeepney parking / loading / unloading
slot must be computed at minimum of
3.00 meters by ________ meters.

25
Length of an articulate truck parking slot (_______ X ______).
3.60 meters x 18 meters
26
Slope for PWD Ramp
1:12 or 12%
27
Repetitive Design
40%
28
In which group of occupancy does an agricultural building belong?
Group J
29
Division C Occupancy
Education
30
Division H; more than 300 without stage
H-2
31
Special Personnel (Design Competition) called
Technical Professionals
32
Code for Housing
BP220 OR BATAS PAMBANSA BLG. 220 (ECONOMIC AND SOCIALIZED HOUSING PROJECTS)
33
Turning radius for wheelchair
1.50 meters
34
Turning radius and stop for wheelchair
1.50 meters
35
SPP Document 203
Specialized Allied Services (or Specialized)
36
SPP Document 205
Post-Construction Services (Post-Construction)
37
Code that pertains to copyright
Intellectual Property Code
38
Philhealth benefits for terminal patients
Z Benefits
39
Benefits from PAG-IBIG Fund
Construction and Improvement
40
Total property measured between exterior walls
GFA or Gross Floor Area
41
Measured to outside face of external walls
CFA or Construction Floor Area
42
Stops overbuilding Reduces the TGFA
Incremental setback
43
Fire Code
RA 9514 (Fire Code of the Philippines
44
Space left after easements
Yard
45
Minimum setback for R-1
4.50 meters
46
Minimum setback for commercial; 15 meters RROW (Road Right Of Way)
5.00 meters
47
Order issued by owner AFTER completion of contract. Changes during Construction Phase
Change Order
48
Change Orders are in what stage
Construction
49
Final payment less retention fee
Final Payment
50
Documents with information needed during bidding
Bid Bulletin
51
Has a licence from PRC (Professional Regulation Commission); passed architectural boards
Architect
52
Approved form of security by contractor; guarantee to excecute work in accordance to contract
Performance Bond
53
Ensures completion and quality of materials
Quality Control
54
What does “SSS” mean?
Social Security System
55
Height of light switch
1.20 meters
56
Height of handrails
0.70 meters or 0.90 meters
57
When does the architect visit the site to check the quality of work?
Construction Phase