1
Q

205

A

DUCT AND CONCRETE INSTALLATION

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

206

A

TRACER WIRE INSTALLATION, 46KV UNDERGROUND

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

207

A

TRENCH, BACKFILL

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

208

A

SITE PREPERATION FOR EQUIPMENT PADS ON SLOPING GRADES

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

209

A

TRENCHING, UNDERGROUND RESIDENTIAL DISTRIBUTION (URD)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

210

A

SLEEVE INSTALLATION

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

212

A

TRENCH AND DUCT ENCASEMENT, DRAINAGEWAY CROSSING

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

215

A

TRENCHING 2.5-INCH, 4-INCH, AND 6-INC CONDUIT INSTALLATION

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

220

A

Underground Riser, Customer Installed

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

218

A

DUCT STUB DETAIL

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

225

A

Distribution Pullbox with Manhole

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

226

A

Pullbox 15 kV with Lid (Reference Only)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

230

A

Equipment Barrier, Protective

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

232

A

Excavation and Duct Placement for 3-Phase Fused Junction Cabinet (F2)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

233

A

Transformer Pad Underground 3-Phase

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

234

A

Excavation and Duct Placement for 3-Phase Junction Cabinet (J2)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

235

A

Excavation and Duct Plasement for 1-Phase Junction Cabinet (J1)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
17
Q

236

A

Excavation and Duct Plasement for 3-Phase Junction Cabinet (J6)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
18
Q

240

A

Excavation and Duct Placement for Switchgear Box Pad (PME)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
19
Q

241

A

Excavation and Duct Placement for Pad-Mounted Capacitor

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
20
Q

242

A

Excavation and Duct Placement for Gas Insulated Switchgear Box Pad (Vista)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
21
Q

243

A

Equipment at Grade in Open Air Alcove

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
22
Q

301

A

Entrance Facilities: Load Balancing, Typical Service Entrances, Socket Wiring
Electric Service Lines: Overhead Service Lines, Underground Service Lines, Service Trenches

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
23
Q

304

A

Overhead or Underground Service and Meter Location

24
305
Service Entrance with Conduit Riser Overhead
25
307
Service Entrance on a Pole
26
308
Three-Phase Underground Service from Overhead, 600A or Less
27
308A
Single-Phase Underground Service from Overhead, 400A
28
309
Three-Phase Underground Service from Pad-Mounted Transformer
29
310
Service Entrance Underground
30
312
Trenching, Service Single-Phase
31
314
Service Entrance Temporary, Underground
32
405
General Requirements Definitions Requirements for Residential Socket Interiors Meter Enclosures and Clear Working Space
33
408
Residential or Commercial (Restricted) Service 0-100A, 3W, 1Ø, Overhead and 0-30A, 2W, 1Ø Overhead or Underground Residential Overhead Service, 3W, 1Ø, 101-200A Residential Underground Service, 3W, 1Ø, 0-200A Residential Service, 3W, 1Ø, 0-200A Combination Meter Socket and Distribution Section Meter Post - Underground Service to Mobile Home
34
409
Service Pedestal for Use in Common Public Area & Right-of-Way, 0-200A, 0-600V
35
410
Commercial Service, 3W or 4W, 1Ø and 3Ø, 0-200A
36
412
Residential or Commercial Service, 3W, 1Ø, 201-400A
37
414
Socket Requirements - 1Ø w/Instrument Transformers Socket Requirements - 3Ø w/Instrument Transformers
38
418
Residential and Commercial Multi-Metering Installations
39
419
Residential, High-Rise Building, Individually Metered Units
40
420
Meter Protective Cabinets
41
422
Current Transformer Installations in Cabinets
42
423
Meter Socket and Conduit Installation Detail for Primary Metered Service
43
424
Remote Meter Cabinet for primary metered service, 201 - 800A
44
425
Terminating Box or Section
45
426
Combination Terminating Box and Main Disconnect
46
429
Commercial CT Power and Control Cabinet, 400-800A
47
430
Current Transformer Installations in Switchgear
48
431
Metering Remote
49
432
Low Profile Switchboards
50
433
CT Compartment, 401-800A, 1Ø
51
434
CT Compartment, 201-1000A, 3Ø
52
435
CT Compartment, 1001-3000A, 3Ø
53
436
CT Compartment, 3001A-4000A, 3Ø
54
437
Enclosed Meter Panel in Raintight Switchgear
55
438
Switchboard Meter Panels
56
439
Removable Bus Links and CT Supports
57
451
Primary Metering Overhead and Underground
58
452
Approved Metering and Service Equipment