Steps 15 - 23 Diving Initiatiates Flashcards

(9 cards)

1
Q

Step 15

A

Order by: SCOOW - Action by: DSC
“DSC, Open all Main Ballast Tank Flood valves”

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Step 16

A

Order by: SCOOW - Action by: DSC120
Open 5 + 6 MBT External vent valves (45 Seconds)
Open 4 MBT External Vent Valves (45 Seconds)
Open 1 + 2 + 3 MBT External vent valves
Report the status of these valves every 5 minutes to SCOOW

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Step 17

A

Order by: XO/WL - Action by: MCC
“MCC, 30 metres back to 17.5 metres”

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Step 18

A

At 12 metres pipe on Main IC
“Report all Hatches from forward”.

Ideally 10 minutes after dive.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Step 19

A

Once all hatches have been reported as Dry and safe
report to Command. DMEO: “Submarine is dry and ready to dive”

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Step 20

A

Order by: DSC - Action by: TMA1
At 12 metres “Report the Tundish”

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Step 21

A

Shut External Vent and flood valves as required
Set cavitation switch to position 2 (If propulsion is in Auto Control)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Step 22

A

Action by: TMA1
Announce Loudly in the CR:

“FULL BORE IN THE TUNDISH”

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Step 23

A

Action by: DSC
Shut the Induction mast vent valve and report: “Induction mast
flooded; vent valve shut”

How well did you know this?
1
Not at all
2
3
4
5
Perfectly