Step 15
Order by: SCOOW - Action by: DSC
“DSC, Open all Main Ballast Tank Flood valves”
Step 16
Order by: SCOOW - Action by: DSC120
Open 5 + 6 MBT External vent valves (45 Seconds)
Open 4 MBT External Vent Valves (45 Seconds)
Open 1 + 2 + 3 MBT External vent valves
Report the status of these valves every 5 minutes to SCOOW
Step 17
Order by: XO/WL - Action by: MCC
“MCC, 30 metres back to 17.5 metres”
Step 18
At 12 metres pipe on Main IC
“Report all Hatches from forward”.
Ideally 10 minutes after dive.
Step 19
Once all hatches have been reported as Dry and safe
report to Command. DMEO: “Submarine is dry and ready to dive”
Step 20
Order by: DSC - Action by: TMA1
At 12 metres “Report the Tundish”
Step 21
Shut External Vent and flood valves as required
Set cavitation switch to position 2 (If propulsion is in Auto Control)
Step 22
Action by: TMA1
Announce Loudly in the CR:
“FULL BORE IN THE TUNDISH”
Step 23
Action by: DSC
Shut the Induction mast vent valve and report: “Induction mast
flooded; vent valve shut”