True or False:
A work center can take credit for a PMS check if 80% of the check can be completed?
False
Who reviews, and approves via signature, the 13-week report?
DIVO, WCS, and LCPO
The LOEP contains all of the following information except?
The periodicity code for each maintenance requirement
True or False:
An OPNAV 4790/CK is used to report discrepancies/deficiencies in the PMS system?
False
If more than one piece of equipment will be maintained by an MRC, the location Block will read?
See Location Guide List Below
Who is the functional manager of 3M on the ship?
3MC (3M System Coordinator)
To request a replacement for a lost or damaged MRC that is classified, the WCS should fill out a?
OPNAV 4790/7B (Category A)
*PMS FBR Non-Technical
An MRC card with a SYSCOM MRC Control Number A7 4ABG N has a production (birth) date of?
October 2017
Which of the following is NOT an example of an IEM MRC?
U-1
Equipment is placed in IEM Status I whenever?
The equipment will not be operated for 30 days or more, but is NOT scheduled for corrective maintenance or overhaul.
Which document provides instructions and references required for use in the 3M System?
OPNAVINST 4790.4 (series)
Which form is used to document installation of new equipment?
OPNAV form 4790/CK
Equipment should be placed in IEM Status II when?
Is inactive for 30 days or more AND is scheduled for corrective maintenance, overhaul, or removal for safe storage/placement.
*Refers to equipment that is repaired off ship.
Danger and Caution Tagout Audits are conducted how often?
Weekly
What does an “C” beside a MIP number on the LOEP mean?
A Change to the MIP
In SKED or on the 13-week report, M-1(#R-1) signifies what?
Monthly one has Mandatory Related Maintenance of R-1
The ships underway schedule can be viewed on which of the following tabs in SKED 3.2?
Events tab
How many weeks are in a quarter?
13 mostly, but sometimes 14
A semi-annual MR can be scheduled at what interval?
4-8 months
An annual MR can be scheduled at what interval?
3-5 Quarters
When a maintenance action cannot be fully accomplished, what must be submitted with your weekly 3M report, reflecting the non-accomplished maintenance?
A check note
The acronym PAR stands for what?
Periodic Accomplishment Rating
In SKED 3.2, hat will happen when attempting to mark a check complete, if no MP is assigned?
A pop-up window will appear, forcing you to assign at least one crew member, prior to marking the check complete.
SNAP II was replaced by?
OMMS-NG