Timber Harvesting (4/28/21) Flashcards

(50 cards)

1
Q

A national policy that programs for the control of non-point source pollution developed in pollution in expedious manners so as to enable the goals of the act to be met through the control of pointed and non-point source of the pollution.

A

Water Quality Act of 1987

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

The portion of the act that focuses on non-point source pollution.

A

Section 3-19

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Anyone causing the pollution or decredation of Mississippi’s _______ is in violation of state law ……

A

Waters

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

BMPs are _______ guidelines for silviculture practices aiming to control non-point sources of pollution. (Regulated or non-regulated)

A

Non-Regulated

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

A water course that flows in a well-defined channel throughout most of the year under normal climatic conditions.

A

Perennial Stream

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

A stream or draw that has a well defined channel that becomes connected to a stream in response to a storm flow.

A

Drain

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

A water force that flows in a well-defined channel during the wet seasons of the year, but not the entire year.

A

Intermittent Stream

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

The agency that monitors compliance and use of BMPs.

A

Forestry Commission

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

This agency reports its findings to _____.

A

DEQ

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

The loss of 1 in. of topsoil due to faulty site preparation techniques has been estimated to reduce the site index by ____.

A

5-10 feet

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Minimum width of an SMZ on each side of a perennial stream.

A

30 ft.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Minimum width of an SMZ on each side of a intermittent stream.

A

30 ft.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Minimum width of an SMZ on each side of a drain.

A

0

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

Mound of soil formed across a road or trail designed to divert runoff water away from a road.

A

Water Bar

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

Extension of a drainage ditch to a vegetative area provided for the dispersion and filtration of storm water runoff.

A

Water Turnout

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

Carefully constructed out slope section of a road that serves as both a water catchment and a drainage channel while allowing vehicles to maintain normal speeds.

A

Broadbase Drainage Ditch

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
17
Q

The angle or degree that waterbars should cross the road.

A

30

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
18
Q

A natural or paved stream crossing suitable for shallow streams with stable bottoms.

A

Fjords

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
19
Q

When conducting mechanical site prep, you should follow the _______ as close as possible except when chopping.

A

Contour

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
20
Q

Causes the most soil erosion problems arising from a prescribed burn.

A

Fire Lanes

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
21
Q

Is ultimately the responsibility of the _______ to ensure that pollution of state waters does not occur due to forestry activities.

22
Q

BMPs were mainly developed to help and maintain ______.

A

Water Quality

23
Q

Cutting all the trees on the side of the creek may cause a reduction in fish population due to _______.

A

Increase Water Temp.

Decrease oxygen content in the water

24
Q

The relatively undisturbed section of forest adjacent to an area requiring special attention or protection such as a stream, lake, or road.

A

SMZ / Buffer Strip

25
A layer or rock used to stabilize the soil that is subject to erosion.
Rip-Rap
26
Forestry activity runoff would be considered a ____ source of water pollution.
Non-Point Source
27
A sewage pipe draining into the Noxube river would be considered a ______ source of water pollution.
Point Source
28
As percent slope increases on roads or trails the number of drainage sources should do what?
Increase
29
As percent slope increases the width of your SMZs should do what?
Increase
30
What type of stream has guidelines that allow for a select harvest that leaves at least 50% of the ground cover in the SMZ?
Perennial
31
What type of stream has SMZ guidelines that allow a regeneration harvest provided other vegetation and/or ground cover remains to protect the forest floor or stream bank?
Intermittent
32
Culverts should be covered with a minimum of 12 in. of earth fill or the culvert diameter whichever is greater, or ________ the culvert diameter.
Half
33
What's the primary objective to any safety program?
Prevent Accidents
34
Most accidents are caused by unsafe _______.
Acts or Conditions
35
Two most important factors in an accident prevention program.
Training and Job Knowledge
36
In logging the primary reason for a poor safety record is lack of adequate supervision and ______.
Poor Management
37
Which is an indirect cost of an accident resulting in an injury?
Increased Insurance Premiums
38
What federal agency inspects logging jobs for safety violations?
OSHA
39
What's the most common method of training new loggers in the logging industry?
OJT (On the Job Training)
40
What does SFI stand for?
Sustainable Forestry Initiative
41
AF and PA members are required to comply with the SFI principles that include replanting of a clearcut within __ years of final harvesting.
2
42
AF and PA members are required to comply with the SFI principles that include limiting the maximum average size of a clear cut to ______.
120 acres
43
What is the green-up period?
3 years or 5 feet tall
44
Explain one method of crossing a stream used with a temporary stream crossing and what should be done to the crossing when logging is completed?
Culvert (Take it out when logging is complete.)
45
Explain one method of re-establishing vegetative cover on an erodible disturbed site in order to stabilize the soil.
Spread grass seed on it.
46
What type of soil problem might arise from skidding in a steep terrain with sandy soils, and what should be done to this trails when logging is completed?
Erosion (Spread slash on the road.)
47
When using a culvert, the outlet end of the culvert should drop at a rate of 1/4 inch per foot of culvert length to prevent ponding at the culvert inlet. How many inches of drop should a 20 foot culvert have?
5 in.
48
Mississippi's BMP booklet lists 9 general SMZ guidelines, be able to name 4.
1. Never use a stream channel as a skid trail or road. 2. Cross streams only at a right angle. 3. Avoid rutting through streams. 4. Minimize the number of stream crossing points.
49
The forest industry developed BMPs to maintain site quality and to avoid mandatory government regulations. Explain why.
You want to protect site quality because you are protecting your land and your water quality and you want to avoid government regulations because each state needs different regulations.
50
(T/F) Tree tops and logging debris that fall into a stream should be removed.
True. Because it would not be there naturally. It is bad for fish and blocks the flow of water.