How many major functions the National Incident Management System (NIMS) defined for the Incident Command System (ICS)?

A

5

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

PHF range for most urban roads

A

0.85 to 0.95

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Which report document decision-making process and describe how performance system will be measured?

A

Validation plan

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

First step in roundabout capacity analysis in automobile mode?

A

Convert movement demand volumes to flow rates

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Purpose of main street from a community’s perspective

A

Leverage a community’s visibility to pass-by traffic facilitate commerce

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Increasing driveways from 10 to 30 driveways per mile would increase crash rates by

A

70%

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Flow rate used for basic freeway segments with free-flow speeds of 70 to 75 mph?

A

2400 pcphpl

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Input for bike compatibility index

A

Lateral distance
Travel speeds
Vehicle types

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Key factors in supporting pedestrian realm in shared street settings.

A

Context sensitivity and legibility

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Factors influencing pedestrian satisfaction with sidewalk or crossing

A

Delay and proximity to other modes of transportation

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Used as a proxy to measure connectivity in multimodal environments

A

Intersection density

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Roundabout capacity analysis in automobile mode

A

Convert movement demand volumes to flow rates
Determine entry flow rates
Select analysis method
Calculate entry capacity
Analyze performance measures
Consider adjustments
Evaluate alternatives

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Characteristic related to traffic flow often difficult to measure accurately

A

Density

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

Factor used as surrogate for density in traffic flow analysis

A

Occupancy

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

Mitigation strategies considered for problematic weaving segments

A

Constructing collector-distributor road where weaving occurs
Reconfiguring location of ramp terminals to lengthen weave section
Continuing auxiliary lane beyond exit point

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

Increasing driveways from 10 to 30 driveways per mile would increase rates by

17
Q

Parking duration

A

Short term: 0-4 hours
Medium term: 4-8 hours
Long term: More than 8 hours

18
Q

Fundamental element in design of parking facilities for user acceptance.

19
Q

Elements included in Transportation Management Plan (TMP) for significant projects

A

Temporary Traffic Control plan (TTC)
Transportation Operation (TO)
Public Involvement (PI)

20
Q

Elements that must be included in Transportation Management Plan (TMP) for insignificant project

A

Temporary Traffic Control Plan (TTC)

21
Q

System that includes emergency incidents of all types and scales accompanying ICS

A

The National Incident Management System and Incident Command System (NIMS)

22
Q

Measuring width of weaving segment

A

of freeway lanes beyond merging/diverging points
# of continuous lanes between entry and exit gore areas including acceleration/deceleration lanes

23
Q

When designing and implementing a new system, which report documents the decision making process and describes the system used?

A

Concept of Operations (ConOps)

24
Q

When designing and implementing a new system, which report documents the decision making process and describes the system will be tested?

A

Verification plan