Untitled Deck Flashcards

(26 cards)

1
Q

1 Phases of Exploration in Ghana

A
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

The synopsis of the history of Ghana’s hydrocarbon exploration under each of the country’s constitutional milestones (period) is as follows:

A
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

• Initial Exploration Phase: 1896 –1967

A
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

• Second Exploration Phase: 1968 –1980

A
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

 Intense exploration activity in the offshore

A
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

 31 wells drilled

A

3 discoveries (Cape Three Points

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

• Third Exploration Phase: 1981- 2000

A
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

 New regulatory and legal framework established

A
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

 Exploration Program intensified further

A
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

 Comprehensive Exploration Promotion Program

A
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

• Current Exploration Phase: 2001 –To Date

A
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

 Focus on Deepwater

A
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

1.2 Upstream Development in Ghana

A
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

Ghana has four (4) distinct sedimentary basins. These sedimentary basins are

A
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q
  1. Western (Tano-Cape Three Points) Basin
A
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q
  1. Central (Saltpond) Basin
17
Q
  1. Eastern (Accra-Keta) Basin
18
Q
  1. Inland Voltaian Basin (onshore)
19
Q

21 Figure 1 Sedimentary Basins in Ghana

20
Q

The first three (3) are offshore basins

A

and these are fairly well explored with Saltpond as the country’s first commercial oil production field commencing in 1978. The Voltaian Basin however

21
Q

The Voltaian Basin Project is currently being undertaken by GNPC with objectives including:

22
Q

• Enhancing the knowledge base of the relatively unexplored basin which would inform the effective development of exploration programmes in the near future

23
Q

• De-risking the basin to justify further investment

24
Q

• Building capacity of GNPC for operatorship Figure 3 Voltaian Basin Project- Seismic lines superimposed on Geological Map 1.2.1 Seismic Line Statistics of the Voltain Basin Total estimated line length = 2520.15 km

25
• Phase 1 = 1871.15 km (13 lines)
26
• Phase 2 = 649 km (7lines) 23 Natural gas utilization in Ghana started with