Volume 4 PTQ 1 Flashcards

(34 cards)

1
Q

Departmental training committee: all________ of the department

A

Assistant fire chief’s

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Captains shall: if assigned to a fire station conduct a______ hour drill each shift and______ wet apparatus drills each month

A

TWO

TWO

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Scope of training: there are five general areas of training which comprises the department training plan

A

1) chief/Company officer
2) tower/In-service
3) firestation
4) recruit
5) technical

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Tower/In-service training is mandatory and each company shall drill as a unit at a departmental approved training site a minimum of_____hours per year______ three hour sessions (I SO requirement)

A

18

6

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

At least one safety drill shall be conducted each month and last a minimum of_____hour

A

1

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

_________ Shall maintain a stock of library material published by other organizations or agencies for distribution

A

Training services section

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Arial supply line:___Inch hose with____ inch couplings. 100 foot length

A

3

2 1/2

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Water shall be run through all hose once every____ unless the hose has been otherwise wet in-service

A

Three months

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

All rubber hose must be reloaded following the annual hose test and then__________ thereafter

A

Quarterly

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

_______ shall assign new hose numbers

A

The property inventory unit of the administrative bureau located at Pacoima warehouse

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Hard suction hose shall be marked with the______ number, And engine______ number

A

Vehicle identification

Company

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Standard loads of 4 inch hose and compliment for standard engine

A

800 load and 900, complement

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Standard load of 2 1/2 inch hose and complement for a standard engine

A

800 and 900

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

Standard load of 1 3/4 inch hose and compliment for a standard engine

A

750 and 1000

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

Standard load of 2 1/2 inch hose and complement for a quint

A

400 and 600

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

The total length of any holes line in the test layout shall not exceed______

17
Q

When testing hose all personnel so clear the area at minimum distance of______ feet, other than those required to perform the remainder of the procedure. The pressure shall be increased slowly to the service test pressure and held within plus or minus_____ PSI

A

15 feet

5 PSI

18
Q

Annual test pressure: The standard hose test pressure is_____ PSI for all hose except otherwise specified

19
Q

All bypass and soft suction and rubber nitrile hose shall be tested a_______

20
Q

All hard suction hose shall be tested at_____ PSI

21
Q

For 50’ sections,_____ is the minimum allowable length for use in the field

22
Q

For 100 foot sections_______ is the minimal allowable late for use in the field

23
Q

For 20 foot bypass and soft suctions______ feat is the minimum allowable length

24
Q

Whenever the hose length falls below the minimum allowable length, initiate a

A

Survey request form 41

25
Use_______ around the hose one inch from the damage and then with a grease pencil or felt that pen to circle the damaged area. Do not use rags or springs to indicate these areas
Duct tape
26
Connecting to sprinkler or stamp pipe systems on systems with inlet in a vertical position, connect to the______ first
Lower
27
The load limit for roof ladders, supported is______
One person every other wrong
28
The load limit for extension ladder 35 foot is
Four personnel
29
Lifeline specifications:
1/2 inch static Kernmantle 100% nylon Elongation 2% to 200 lbs, 17% at 75% of min. Breaking strength less than 20% at failure Melts at 480– 500, becomes sticky at 445, yellows at 300 after five hours of exposure Braid: One over and one under Core: continuous, Block creel construction
30
Lifelines shall be inspected and inventoried______ and noted on form_____
Monthly | Form 248, rope system inventory
31
Lifelines shall be washed_____
As needed
32
When cleaning the facepiece make a hypochlorite disinfecting solution of 2 tablespoons of chlorine bleach per gallon of warm water, 100°F. Immersed the facepiece top first in the solution until the exhalation file is covered. Soak the face peace for 2 to 3 minutes
Answer in statement
33
Standard load of 1 3/4" inch hose and compliment for a quint
400 | 600
34
Standard load of 4" inch hose and compliment for A Quint
600 | 700