Week 7 (Industry Presentation From Emmanuel Yala) Flashcards
(15 cards)
What is a key consideration for method selection in Queensland?
Site-specific conditions
e.g. climate, terrain
What is temporary works in construction?
Structures like scaffolding or formwork to support construction
Name a risk of poor temporary works design
Cost overruns or structure failure
What is a common cause of project delays?
Design modifications or poor constructibility
How can erosion be controlled on a construction site?
Use silt fences or drainage systems
Why is early planning for temporary works critical?
Prevents budget overruns and safety risks
What is constructibility in construction?
Ease of building a design safely and efficiently
Name a piece of equipment for temporary works
Scaffolding
What is a challenge of managing temporary works cost?
Underestimating design complexity
How does a construction engineer address environmental risks?
Implement controls like erosion or waste management
What is a stakeholder discussion point for temporary works?
Costs vs. safety trade-offs
Why is WHS critical in temporary works?
Prevents worker injuries from collapses or falls
What is a practical challenge in civil projects?
Budget overruns due to unforeseen conditions
What is a benefit of site-specific method selection?
Improves efficiency and reduces risks
What is a key deliverable for temporary works planning?
Risk assessment and design calculations