Who does it? Flashcards

1
Q

Overall responsibility for compliance with API 653

A

1.2
O

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Perform FFS evaluations on corroded tank shells

A

4.3.1.2
E

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

In a shell LTA, find t2 (thinnest area exclusive of pit)

A

4.3.2.1.a
I

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

In shell LTA, determine placement of vertical lines (L) for Corr Ave.

A

4.3.2.1.c
I

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Determine MFL Threshold

A

4.4.5.1 Note 1
O

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Perform the Routine In-Service Inspection

A

6.3.1.1
Ops

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Perform the External Inspection

A

6.3.2.1
I

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Determine the extent of UT measurements on the shell

A

6.3.3.1
O

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Review the results of CP surveys

A

6.3.4.1
O

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Assure competency of personnel performing CP surveys

A

6.3.4.2
O

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Choose to use RBI to set Internal Interval

A

6.4.2.2.2
O

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Perform the Internal Inspection

A

6.4.1.2
I

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Conduct an RBI assessment

A

6.4.2.2.2
RBI Team

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

Review and approve RBI reassessments every 10 years

A

6.4.2.2.2
RBI Team

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

Approve Standard Deferral for Internal Inspection

A

6.4.3.1
O

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

Written request for a Std Deferral of Internal Inspection

A

6.4.3.1.e
I & O

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
17
Q

Provide written reasons for a Standard Deferral for Internal Insp

A

6.4.3.1.i
O

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
18
Q

Determine if Risk is okay for a Risk-based Deferral for Internal Insp

A

6.4.3.2
O

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
19
Q

Maintain tank records

A

6.8.1
O

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
20
Q

Prepare report after each External & Internal Inspection

A

6.9.1
I

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
21
Q

Maintain inspection reports & recommendations for life of tank

A

6.9.1
O

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
22
Q

Review inspection findings and recommendations

A

6.9.3.2
O

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
23
Q

Written approval to delay/delete recommended repairs or monitoring

A

6.9.3.2
O

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
24
Q

Evaluate and accept NDE examination results

25
Authorize all alterations
9.1.4.a.1 E
26
Authorize all repairs that require a hydrotest
9.1.4.a.2 E
27
Authorize repairs that do not require a hydrotest
9.1.4.b I Or E
28
Designate inspection hold points for repairs & alterations
9.1.5.a I Or E
29
Specify min documentation to be submitted after repairs & alterations
9.1.5.b I Or E
30
During repairs & alteration, Approve proposed design, mtls, WPSs, etc
9.1.6 I Or E
31
Approve all repair, alteration and reconstruction work at hold points
9.1.6 & 10.1.4 I Or E
32
Approve all repair, alteration & reconstruction work at completion
9.1.6 & 10.1.4 I Or E
33
Design door sheets that differ from API 653 designs
9.2.4 E
34
Approves in-writing, door sheet designs that differ from API 653
9.2.4 O
35
Allow lap-patch repairs to used on tank shells
9.3.1 O
36
Determine life of nonmetallic repairs
9.4 E
37
Evaluated whether nonmetallic repair restores needed hoop strength
9.4 E & O & Composite Manufacturer
38
Review & approve the use of non-code specified lap patches on bottom
9.11.1.3 E
39
Approve lap patch in critical zone if bottom thickness is < 0.100”
9.11.1.6.b E
40
Run the hot tap machine
9.15.5.4 Qualified Operator
41
Authorize all reconstruction work
10.1.3 I or E
42
Designate inspection hold points for reconstruction
10.1.3 I
43
Specify min documentation to be submitted after reconstruction
10.1.3 I
44
Access to Repair Org’s welding records
11.2.1 I or O
45
Review the use of Preheat or Controlled Deposition welding in lieu of PWHT
11.3 E
46
Concur in writing use PWHT alternative for matl’s of unknown toughness
11.3 E & O
47
Approve the use of friction stud welding
11.5 O & Repair Org
48
Review & approve exempting a hydro after a major repair or alteration
12.3.3.2 E & O
49
Authorize FFS evaluation to exempt a hydro after repair
12.3.3.7 O
50
Perform FFS evaluation to exempt a hydro after repair
12.3.3.7 E
51
Request nameplate for existing tank without a nameplate
13.1.2.1 O
52
Tank w/o nameplate, oversee attachment of new nameplate
13.1.2.2/3 I
53
Perform tank settlement survey
B.2.1 Experienced Person
54
Do rigorous stress analysis for floor settlement exceeding 653 limits
B.3.2/3.2.4 E
55
Floor scan qualifications – Decide to use Annex G or modify Annex G
G.1.1 O
56
Verify if floor scans are following the examination procedure
G.3.1 I or O
57
Perform qualification tests for floor scanning examiners
G.4.6 O or 3rd Party
58
Perform Similar Service assessments
H.1 I or E or Knowledgeable One
59
Authorize use of non-metallic repairs
J.1 O