Who Does It Flashcards

1
Q

Overall responsibility for complying with API 510 (4.1)

A

Owner/User

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

During Repairs and Alterations - Responsible for Quality Control (4.2.3)

A

Repair Organization

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Assure owner - testing, inspection & examination activities meet Code (4.2.4)

A

Inspector

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Evaluate and accept NDE examination results (4.2.4)

A

Inspector

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Develop the Inspection Plan for Vessels & Relief Devices (5.1.1.1)

A

Inspector OR Engineer

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Review the Inspection Plan for equipment operating at elevated temperature (5.1.1.1)

A

Corrosion Specialist

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Choose to conduct RBI assessments (5.2)

A

Owner/User

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Review prior vessel history prior to inspections (5.3.4)

A

Inspector

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Familiar with characteristics of potential damage mechanisms (5.4.2)

A

Inspector

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Perform Internal Inspection (5.5.2.1)

A

Inspector

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Determine whether it’s necessary to remove deposits or lining (5.5.2.3)

A

Inspector AND Corrosion Specialist

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Perform On-Stream Inspection (5.5.3.1)

A

Inspector OR Examiner

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Approve On-Stream Inspection work performed by Examiners (5.5.3.1)

A

Inspector

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

Perform External Inspection (5.5.4.1.1)

A

Inspector OR Qualified Others

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

Take Thickness Measurements (5.5.5.1)

A

Inspector OR Examiner

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

Review corrosion data if short-term corrosion rate varies significantly (5.5.5.3)

A

Inspector AND Corrosion Specialist

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
17
Q

Assure those taking thickness measurements are trained and qualified (5.5.5.4)

A

Owner/User

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
18
Q

Determine locations of CMLs for vessels with localized corrosion (5.6.3.1)

A

Corrosion Specialist

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
19
Q

Involve if the # of CML’s will be signigicantly reduced or eliminated (5.6.3.2)

A

Corrosion Specialist

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
20
Q

Determine type of expected damage and select NDE method (5.7.1)

A

Inspector AND Engineer or Corrosion Specialist

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
21
Q

Perform UT flaw detection for finding linear flaws (5.7.1.2)

A

QUTE - API Certified UT

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
22
Q

Determines when a pressure test is needed after a repair - “believes” (5.8.1.1)

A

Inspector

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
23
Q

Review use of a component pressure test in lieu of complete vessel hydro (5.8.1.2)

A

Engineer

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
24
Q

Determine the test pressure for non-code related pressure tests (5.8.2.2)

A

Owner/User

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
25
Hydro of 300 SS, verify water quality and that vessel is drained and dried (5.8.4.2)
Inspector
26
Approve substituting NDE for a pressure test (5.8.7.1)
Inspector AND Engineer
27
Verify new materials are consistent with those specified (5.9.1)
Inspector
28
When verifying new materials, determine the sampling percentage (5.9.1)
Inspector OR Owner/User
29
PMI new materials during repairs & alterations (5.9.1)
Inspector OR Examiner
30
If incorrect material found in existing vessel, determine amount of verification (5.9.2)
Inspector
31
Assess crack-like flaws attributed to environmental cracking (5.10.3)
Engineer OR Corrosion Specialist
32
Assess preferential corrosion in welds (5.10.3)
Inspector
33
Inspect new vessels at time of installation (6.2.1.1)
Inspector
34
Review and approve RBI assessments that extend intervals beyone 10 years (6.3.2)
Inspector AND Engineer
35
Determine the External & Internal Inspection Interval (6.4.1 & 6.5.1.1)
Inspector OR Engineer
36
Approve the use of On-Stream Inspection in lieu of Internal (6.5.2.1)
Inspector
37
Determine the Relief Device interval (6.6.2.1)
Inspector OR Engineer OR Qualified Others (PTV Tech)
38
Select which Corrosion Rate (short vs. long) reflects the current condition (8.1.1)
Inspector AND Corrosion Specialist
39
Maintain Vessel and Relief Device records (8.1.1)
Owner/User
40
Authorize all vessel repairs (8.1.1)
Inspector
41
Authorize all repairs to Div. 2 vessels 8.1.1)
Inspector AND Engineer
42
Authorize all alterations (8.1.1)
Inspecto AND Engineer
43
Designate hold point (fabrication approvals) (8.1.1)
Inspector
44
Repairs - Approve all methods of design, materials, WPSs, NDE & Testing (8.1.2.1)
Inspector
45
Alterations - Approve all methods of design, materials, WPSs, NDE & Testing (8.1.2.1)
Inspector AND Engineer
46
Approve all repair and alteration work at hold points (8.1.2.2)
Inspector
47
Approve all repair and alteration work at completion of work (8.1.2.2)
Inspector
48
Approve all nozzle installations (8.1.3)
Engineer
49
Allow temporary welded repairs to remain in place past "next opportunity" (8.1.5.1.1)
Inspector AND Engineer
50
Determine that a crack will not propagate from under a fillet weld patch (8.1.5.1.2.1)
Engineer
51
Approve the use of fillet-welded patch repairs (8.1.5.2.1)
Inspector AND Engineer
52
Approve use of lap band repair (8.1.5.1.3.a)
Inspector AND Engineer
53
Authorize the repair welding of cracks at stress concentrations (8.1.5.2.1)
Engineer
54
Review the repair procedures for SS Cladding (8.1.5.4.1)
Inspector AND Engineer
55
Monitor the repairs made to SS Cladding (8.1.5.4.3)
Inspector
56
Maintain record of qualified WPSs and WPQs (8.1.6.2.2)
Repair Organization
57
Allow exceptions to preheat temperatures (8.1.6.3)
Engineer
58
Monitor preheat temperatures (8.1.6.3)
Inspector
59
Review the use of a local PWHT in lieu of a full encirclement PWHT (8.1.6.4.1.a)
Engineer
60
Review the use of Preheat in lieu of PWHT (8.1.6.4.2.1.1)
Engineer
61
Review the use of controlled deposit welding in lieu of PWHT (8.1.6.4.2.1.1)
Engineer
62
Approve use of alternate NDE methods after repairs & alterations (8.1.7.3)
Inspector AND Engineer
63
Perform calculations for rerate (8.2.1.a)
Engineer OR Manufacturer
64
Oversee the attachment of a nameplate after rerating was performed (8.2.2)
Inspector