Which time elements are relevant for lead time scheduling of a production order? (Choose 2)
Float after production.
Setup time.
What type of time element can be reduced by strategy settings while dispatching? (Choose 2)
Setup time.
Queue time.
Which times elements does MRP consider in backward scheduling to determine the order dates for components from dependent requirements? (Choose 2)
Planned delivery time.
In-house production time.
What is the purpose of a reporting point confirmation in repetitive manufacturing? (Choose 2)
To determine the work in progress along the production line.
To provide timely updates of inventory management for the staged components.
You want to insert an operation at a certain time on a work center. The planning direction is forward. The desired dispatching time coincides with an operation that has previously been dispatched. How does the insertion take place?
The new operation is inserted at the desired time
the previously dispatched operation is moved forward.
Which time elements are part of a routing operation? (Choose 3)
Wait time.
Queue time.
Move time.
You want to schedule an operation finitely, without moving other operations. Which scheduling strategy do you select?
Squeeze in.
How can you achieve a feasible production plan in case of capacity constraints? (Choose 3)
Select an alternative mode on a resource.
Adjust the available capacity.
Form optimum sequence to reduce setup times.