API-570 who does it (in order of code) Flashcards
Overall responsibility for complying with API-570
4.1
O
Overall responsibility for complying with API-570
4.1
O
Responsible for developing & implementing QA insp./repair management system
4.3.1.1
O
Responsible for QC during repairs or alterations
4.3.3
Repair Org
Responsible for implementing an effective MOC process
4.3.1.2
I
Assure owner - Testing, inspection and examination activities meet code
4.3.4
I
Evaluate And accept NDE examination results
4.3.4
I
Maintain certification records of NDE examiner’s
4.3.5.3
Exam Employer
Develop an inspection plan for a piping system
5.1.11
And/ Or
I or E
Also involved in making Inspection plan for pipes that operates greater (<) than 750° F
5.1.1.1
CS
Choose to conduct RBI assessments
5.2
O
Get familiar with prior inspection data and repairs prior to inspections
5.3.5
I
Get familiar with operating conditions and potential damage mechanism for pipe system
5.4.1.2
I
Perform onstream inspections
5.5.2
Or
I or tech
Perform thickness inspections
5.5.3
Or
I or tech
Assure individuals taking thickness measurements are trained and qualified
5.5.3
O
Determine cause if short-term corrosion great very significantly
5.5.3
And
I & CS
Perform external inspections
5.5.4
Or
I or qualified other
Involved if the number of CML’ s will significantly reduced or eliminated
5.6.2
CS
Select or adjust the number of CML’ s
5.6.3
CS
Select CML’S for pipe systems subject to localized corrosion or cracking
5.6.3
CS
Determine need for non-thickness NDE techniques Inspector consults with
5.7.2
OR
E, CS
Determine surface prep for the NDE exam Inspector made need to consult with
5.7.3
GURU
Perform UT flaws detection for finding linear flaws
5.7.4
QUTE
Determine pressure for leak tests (non-code tests)
5.8
O
Prior to Hydrotest determine if structure will support weight
5.8
E
Determine risk of brittle fracture prior to performing a pressure test
5.8.3
E
Approve substituting NDE FOR a pressure test
5.8.5
AND
I & E
Perform UT as a substitute for a pressure test
5.8.5
QUTE
Verify that new alloy material during repairs & alteration meet specifications
5.9
I