Q

In the event that both the Demineralized Water Pumps or the Demineralized Water Tank are unavailable:

A. Demineralized Water is unavailable for Condensate Storage Tank make-up, CST level must be monitored more closely
B. The Demineralized Water system can be supplied directly from the booster pump at WRF at a lower pressure
C. The Demineralized Water system can be supplied directly from the booster pump at WRF at a higher pressure
D. Condensate Storage Tank make-up is available, but the rest of the Demineralized Water system is unavailable

A

B. The Demineralized Water system can be supplied directly from the booster pump at WRF at a lower pressure

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Which of the following systems provide quench water for the blow down stack?

A. Domestic Service Water
B. Demineralized Water
C. Turbine Cooling Water
D. Condensate Service Header

A

A. Domestic Service Water

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Which of the following will result in a Liquid Nitrogen Pump TRIP?

A. Active nitrogen storage bank drops to 1400 psig
B. Active nitrogen storage bank rises to 2400 psig
C. Liquid storage tank level of 75”
D. High pressure nitrogen header pressure of 700 psig

A

B. Active nitrogen storage bank rises to 2400 psig

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Why is High Pressure Nitrogen supplied to containment?

A. Reactor Drain Tank cover gas
B. Steam Generator cover gas
C. Emergency operation of air operated valves
D. Safety Injection Tank pressurization

A

D. Safety Injection Tank Pressurization

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

How will the Hydrogen Supply system respond to a pipe break at the 140” of the turbine building?

A. Both the active and reserve banks will depressurization
B. Only the active hydrogen bank will depressurization
C. The excess flow valve would seat and hydrogen could not be restored to main turbine until the pressure across the valve is equalized
D. The hydrogen active and reserve regulators will sense a high flow condition and secure hydrogen supply

A

C. The excess flow would seat and hydrogen could not be restored to main turbine until the pressure across the valve is equalized