Admin Flashcards
(13 cards)
The plant has experienced a Loss of All Offsite AC and only the 2AB EDG is operating. Due to the Loss of Power, the PPC is not available.
What contingency action is taken to compensate for the unavailability of the PPC?
a. Emergency Response Data System (ERDS) is activated.
b. Safety Parameter Display System (SPDS) is transmitted to the NRC.
c. PMP-2080-EPP-100 Data sheet 1, Technical Information sheet, is completed every 15 minutes.
d. PMP-2080-EPP-100 Data sheet 4, Plant Status sheet, is completed every 60 minutes.
c. PMP-2080-EPP-100 Data sheet 1, Technical Information sheet, is completed every 15 minutes.
During steady state 100% power operation, you are performing a Plant Computer Online Calorimetric Validation in accordance with 01-OHP-4030-114-029 Reactor Thermal Power.
The computer points for Steam Generator (S/G) Blowdown are reading as follows:
SG # - PPC Value (gpm) - PPC Color - Local Value (gpm)
- 11 - 98 - Green - 98
- 12 - 100 - Magenta - 105
- 13 - 95 - Green - 95
- 14 - 96 - Green - 95
Which ONE of the following would be a correct response to these conditions?
a. Use the online calorimetric since the computer value for the #12 S/G is less than the actual blowdown.
b. Manually enter a value of 105 gpm for the #12 S/G Blowdown and insure the online calorimetric remains below 100%.
c. Isolate SG Blowdown. A Manual calorimetric may be used after the plant has been stable for 10 minutes.
d. Use the online calorimetric since the computer value for the #12 S/G is within allowed tolerance. The magenta color indicates a deviation from the other SGs.
C: The computer input for #12 SG blowdown is inaccurate. The magenta reading means that it is inaccurate and should not be used. The SG Blowdown Flow should be Isolated. The manual calorimetric may then be used.
When during the review/approval process does a On-The-Spot Change (OTSC) become available for immediate use?
a. Once the applicable 10CFR50.59 review is complete.
b. Following SRO review of the change and signature.
c. After the Qualified Technical Reviewer reviews the change.
d. When the Department Manager signs the change.
b. Correct - The procedure is ready for use after the SRO has approved the changes.
Prior to entering the Auxiliary Building for a tour, you identify a limited access area as having the following readings:
* Surface Contamination Level of 80 dpm/100 cm2 (Alpha)
* General Area Radiation Level of 1200 mRem/hr
* Airborne Radioactivity Level of 7 DAC-hours/week
Which ONE of the following postings is required at the entrance to this area?
a. High Radiation and Contamination Area
b. Very High Radiation and Airborne Area
c. Locked High Radiation and Contamination Area
d. Very High Radiation, Contamination and Airborne Area
c. Correct - A Locked High Radiation area is defined as an Area accessible in which radiation levels could result in a dose equivalent in excess of > 800 mrem in 1 hour at 30 cm. A Contamination area is defined as An area where loose surface contamination may exceed 1000 dpm/100 cm2 smear or 20 dpm/100 cm2 of (Alpha)
12-THP-6010-RPP-418
FOLLOWING the Initial Notifications for an Emergency Plan accident classified as an ALERT, the SEC must FAX an updated EMD-32 form to the State of Michigan every ____ minutes until relieved by the EOF.
a. 15
b. 30
c. 60
d. 120
b. Correct - PMP-2080-EPP-100 Attachment 8 Section 3.1 requires EMD32 followup notifications every 30 minutes.
Step 2.2.6
During an independent verification a valve is found out of position.
Which of the following is the way the component out of position shall be handled? The component shall be repositioned…
a. by the person who did the initial lineup and then verified
b. and verified by the person performing the verification
c. and the supervisor notified of the discrepancy
d. after the supervisor gives the approval
d. Correct - PMP-4010-HUT-001 requires notification of the supervisor for resolution of the discrepancy.
The following conditions exist :
- Unit 2 is in Mode 1.
- A Reactor Operator and the Unit Supervisor are in the Unit 2 Control Room.
- A high vibration alarm is received on the HD pump requiring someone to go behind the panel to check the indications.
Which ONE of the following describes the procedurally accepted method of checking the indications?
a. The Unit Supervisor can go behind the panel to check the vibration.
b. The Reactor Operator can go behind the panel to check the vibration.
c. Both the Reactor Operator and the Unit Supervisor are allowed to go behind the panel to check the vibration as long as all controls are in automatic.
d. Neither the Reactor Operator or the Unit Supervisor can go behind the panels. They must get another operator to check the vibration.
a. Correct - The Unit Supervisor must be in the Control Room but may go behind the panels. The RO must remain in the view of the panels. OHI-4000
Which ONE of the following describes a responsibility of the SRO when reviewing an On-The- Spot Change (OTSC)?
a. Verifies that the change is consistent with appropriate source documentation.
b. Determines that the change is technically correct.
c. Ensures that the change meets equipment engineering requirements.
d. Ensures that the change does not adversely affect plant safety or operation.
d. Correct - The SRO is responsible for ensuring that the change doesn’t affect safety or plant operation.
Rad monitor VRS-1505, Unit Vent Effluent Low Range Noble Gas Channel, has failed HIGH. Repairs will take at least 3 days.
Which ONE of the following actions is required by PMP-6010-OSD-001, Off-site Dose Calculation Manual, regarding a release from the waste gas decay tank?
References Attached:
PMP-6010-OSD-001, Off-site Dose Calculation Manual, Attachment 3.4 (pages 50-52)
The release …
a. may NOT be started until the repairs on VRS-1505 are completed.
b. may be started provided RP recalculates the trip set points using VRS-2505 as the release path alarm and termination monitor.
c. may be started for up to 30 days provided grab samples are taken shiftly and analyzed within 24 hours
d. may be started for up to 14 days provided 2 independent samples are analyzed and the calculations and valve lineups are dual verified
d. PMP-6010-OSD-001 Attachment 3.4 Action 9 allows releases to continue for 14 days provided 2 independent samples are analyzed and the calculations and valve lineups are dual verified.
The maximum time that can elapse between a gas decay tank being approved for release and the start of the release is …
a. 4 hours
b. 12 hours
c. 24 hours
d. 48 hours
c. Correct - 12-OHP-4021-023-002 Release of Radioactive Waste from Gas Decay Tanks, Data Sheet 1 requires the SRO to ensure that not more than 24 hours have elapsed since the Release was approved.
Unit 1 was in MODE 4 with a Containment Inspection in progress.
An explosive device was found in close proximity to the Main Steam Leads.
How should the this event be classified per the Emergency Plan? (PMP-2080-EPP-101 Attachment 1 is attached)
a. General Emergency
b. Site Area Emergency
c. Alert
d. Unusual Event
b. Correct - Security event H-2 requires a Site Area Emergency if a bomb is found within the Vital Area.
Which one of the following is required to identify/track Tech Spec status of equipment that is made Inoperable for planned maintenance during Modes 1 through 4? (Assume Inoperability will continue through shift turnover.)
a. A Control Room Log entry and Shift Manager Log entry
b. An AR (eSAT) and Control Room Log entry
c. An AR (eSAT) and an Abnormal Position Log entry
d. A Control Room Log entry and an Open Items Log entry
d. Correct A Control Log Entry and Open Items Log Entry is required for inoperable TS equipment.