Analyze Missile Material Condition Status Reporting System Flashcards
(10 cards)
Admin Swap
.
- Moving major end item(s) from two separate NMC systems within a unit to make 1 NMC system and 1 FMC system
Controlled Substitution
- Moving a serviceable component from an NMC piece of equipment to another NMC piece of equipment to make only 1 system NMC instead of 2
Lateral Transfer
- Moving major end item(s) from two separate NMC systems within two different units to make 1 system FMC
Float Transaction
.
- Moving major end item(s) from the SSA’s Stock Record Account to the unit needing the equipment
All missile equipment will be reported monthly for all units. The monthly reporting period is defined to be a period beginning.
at 0001 hours on the 16th day of the month and ending at 2400 hours on the 15th day of the following month
Utilization codes can be found in
AR 700-138
PMC
Partially Mission capable
NmC
Non mission capable
USR
Unit status report
Commanders mission accomplishment estimate
MAE
1-MAE in conjunction with 4 Rated areas
1. Personnel - P Rating
2. Supply / EOH (Equipment On Hand) - S Rating
3. Equipment Readiness - R Rating
4. Training - T Rating
CA12 Analyze Missile Material Condition Status Reporting System
4F-140L PATRIOT SYSTEM